Discusses Insp Rept 50-400/90-01 on 891226-900105 & Forwards Notice of Violation.Response Describing Actions Taken or Planned to Improve Effectiveness of Program on Concerns Re Implementation of Mgt Controls Requested
ML18022A779
Person / Time
Site: Harris 
Issue date: 02/26/1990
From: Reyes L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Eury L
CAROLINA POWER & LIGHT CO.
Shared Package
ML18022A780 List:
References
NUDOCS 9003080372
Download: ML18022A779 (5)


Text

a FEH 8 6 199O Docket No. 50-400 License No.

NPF-63 EA 90-010 Carolina Power and Light Company ATTN:

Mr. Lynn W.

Eury Executive Vice President Power Supply P.

0.

Box 1551 Raleigh, NC 27602 Gentlemen:

SUBJECT:

NOTICE OF VIOLATION (NRC INSPECTION REPORT NO. 50-400/90-01)

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by J.

Tedrow on December 26, 1989 - January 5,

1990 at the Harris facility.

The inspection included a review of the circumstances surrounding a reactor startup performed in December 1989, and subsequent power ascension during which the Power Range Nuclear Instruments were not properly calibrated to adjust for a new low leakage core loading pattern.

The report documenting this inspection was sent to you by letter dated January 17, 1990.

NRC concerns relative to the inspection findings were discussed in an Enforcement Conference held on February 15, 1990.

The letter summarizing this Conference was sent to you on February 23, 1990.

The violation described in the enclosed Notice of Violation involved a failure to properly establish limiting safety system settings for the Reactor Trip System.

The events or circumstance that resulted in this violation included insufficient management attention and failure of operations personnel to identify the miscalibrated instruments despite various other instruments and events that could have alerted them to the problem early in its evolution.

Additionally, your personnel did not recognize the significance in the timeliness of reporting this event.

After careful consideration of this matter, the NRC staff has concluded that the safety significance of this violation is commensurate with a Severity Level IV violation.

In addition to the need for corrective action regarding the specific matters identifed in the enclosed Notice, we are concerned about the implementation of your management controls that permitted this situation to develop.

Consequently, your response should describe those particular actions taken or planned to improve the effectiveness of your program.

You are required to respond to this letter and should follow the instructions specified in the enclosed Notice when preparing your response.

Your response should document the specific actions taken and any additional actions you plan to prevent recurrence.

After reviewing your response to this Notice, including gpCK 0~000400 0~0372 900226 PDR A i PTw

.

A

Carolina Power and Light Company

~LB 86 tggo your proposed corrective actions and-the re'suits,of future inspections, the NRC will determine whether further NRC enforcement action is necessary to ensure compliance with NRC regulatory requirements.

In accordance with 10 CFR 2.790, a copy of this letter and its enclosure will be placed in the NRC Public Document Room.

The responses directed by this letter and its enclosure are not subject to the clearance procedures of the Office of Management and Budget as required by the Paperwork Reduction Act of 1980, Pub.

L.

No.96-511.

Should you have any questions concerning this letter, please contact us.

Sincerely, Enclosure:

Notice of Violation cc w/encl:

R.

B. Richey, Manager Harris Nuclear Project Box 165 New Hill, NC 27562 C.

S.

Hinnant Plant General Manager Harris Nuclear ProJect Box 165 New Hill, NC 27562 D.

L. Tibbitts, Director Regulatory Compliance Harris Nuclear Project P.

0.

Box 165 New Hill, NC 27562 Richard E. Jones General Counsel Carolina Power 5 Light Company P.

0.

Box 1551 Raleigh, NC 27602 (cc w/encl continued - See page 3)

Original Signed by Luis A. Reyes Luis A. Reyes, Director Division of Reactor Projects

(cc w/encl cont'd)

Dayne H. Brown, Director Division of Radiation Protection N.

C. Department of Environment, Health 8 Natural Resources P.

0.

Box 27687 Raleigh, NC 27611-7687 bcc w/encl:

C. Barth, OGC J.

Lieberman, OE A. Upchurch, Chairman, Triangle J Council of Governments Document Control Desk NRC Resident Inspector U.S. Nuclear Regulatory Commission Route 1, Box 315B New Hill, NC 27562 RII'DRP 02/~g /90 RII:

RP DVerrelli 02/y~/90

~

p RII:E S

r off GJ nkins

.)/90 02/y3/90

Cl