IR 05000400/1979013

From kanterella
Jump to navigation Jump to search
IE Insp Repts 50-400/79-13,50-401/79-13,50-402/79-12 & 50-403/79-11 on 790709-11.No Noncompliance Noted.Major Areas Inspected:Structural Concrete,Site Preparation,Dams & Licensee Action on Previous Insp Findings
ML18003A642
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 07/23/1979
From: Conlon T, Harris J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML18003A639 List:
References
50-400-79-13, 50-401-79-13, 50-402-79-12, 50-403-79-11, NUDOCS 7908300583
Download: ML18003A642 (8)


Text

1P,R REQy

~ 7

ce

~s P~

ts

+ +*4'

UNITED STATES NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTAST., N.W., SUITE 3100 ATLANTA,GEORGIA 30303 Report Nos. 50-400/79-13, 50-401/79-13, 50-402/79-12 and 50-403/79-12 Licensee:

Carolina Power and Light Company 411 Fayetteville Street Raleigh, North Carolina 27602 Facilty Name:

Shearon Harris Nuclear Power Plant Docket Nos.

50-400, 50-401, 50-402 and 50-403 License Nos.

CPPR-158, CPPR-159, CPPR-160 and CPPR-161 Inspection at Shearon Harris Site near Raleigh, Inspector:

J.

. Harris Approved byl'" = '~

c~>

T. E. Conlon, RCSES Branch North Carolina

~l ~ ~/7f Date Signed

~3. 7 Date Signed SUNNARY Inspection onI July 9-11, 1979

)

Areas Inspected This routine, unannounced inspection involved 24 inspector-hours onsite in the areas of structural concrete; site preparation; dams; and licensee action on previous inspection findings.

Results Of the 4 areas inspected, no items of noncompliance or deviations were identified.

V9088 0c ar z

DETAILS 1.

Persons Contacted Licensee Employees

""R. M. Parsons, Site Manager

-"G. L. Forehand, Principal gA Specialist

-"A. M. Lucas, Resident Engineer

="J. F. Nevill, Senior Engineer, Civil D.

S.

Canady, Geologist

'-"N. J. Chiangi, Manager Engineering and Construction, gA E. L. Kelly, Senior Civil Specialist, gA

-"T. H. Wyllie, Manager of Nuclear Construction Other Organizations I. Ciloglu, Geologist, Ebasco P. Shiebel, Geologist, Ebasco

-"Attended exit interview 2.

Exit Interview The inspection scope and findings were summarized on Ju1y ll, 1979 with those persons indicated in Paragraph 1 above.

Licensee Action on Previous Inspection Findings a.

(Closed)

Noncompliance (400/79-07-04, 401/79-07-04, 402/79-06-04 and 403/79-06-04):

Concrete Truck Revolution Counter.

Truck number 20 did not have a working revolution counter on pour number 1WPSL 23605 at 6:00 p.m.

on April 11, 1979 as required by specification CAR-SH-CH-6.

The inspector examined the licensees response dated June 25, 1979 and implementation of the proposed corrected action.

Revolutions showing on the counter are being recorded on batch tickets and new electronic digital counters are being installed on all concrete trucks.

b.

(Closed) Deviation (400/79-0701, 401/79-07-01, 402/79-06-01, 403/79-06-01):

Control of Moisture Content on Power Block Fill.

The inspector examined the licensees response dated June 18, 1979 and implementation of corrective action.

Specification CAR-SH-CH-8 and Procedure TP-02 have been revised to control the moisture content of backfill at plus or minus 4 percent of optimum specified in the PSAR.

Revisions and supporting data for revisions have been examined and approved by NRR and RII:IE.

Appropriate changes will be reflected in the FSAR. This item is close ('W

-2-c

~

(Open) Noncompliance (400/79-07-02, 401/79-07-02, 402/79-06-02 and 403/79-06-02): Failure to Place Embankment Core Fills At Specified Moisture Content.

Impervious fillin the separating dike has been removed and replaced in accordance with revised procedures and spe-cifications.

Controlling procedures and specifications have been examined and approved by NRR and IE:RII. New impervious fills are being placed in accordance with the revised procedures and specfi-cations.

Previously placed core fills are still being evaluated by the licensee.

This item remains open pending examination of the licensee's evaluation by NRR and IE:RII.

d.

(Open) Unresolved Item (400/79-07-03, 401/79-07-03, 402/79-06-03 and 403/79-06-03):

Category I Piping Fill Support.

The Licensee's re-sponse dated June 12, 1979 has been reviewed by NRR and IE:RII.

Region II, in a later dated June 18, 1979 from J.

P. O'Reilly to J.

A. Jones, concurred with CPRL's schedule for resumption of fill around seismic category I pipe and adjacent electric conduit between coordinate N230 and the number 1 tank building.

Emergency service water lines crossing fillbetween the tank building and rock will be on concrete extending to bed rock.

Density tests will be made at the 5 foot, 7 foot and 10 foot levels and the foundation grade proof rolled at excavations into old yard fillfor the nuclear service water line.

Where the nuclear service water lines cross natural ground, the excavations will be controlled in accordance with CAR-SH-CH-8.

The licensee is still evaluating powerblock fills and yard fills crossed by category I fuel lines and electrical ducts.

This item remains open pending examination of the licensee's evaluation by NRR and IE:RII.

4.

Unresolved Items Unresolved items were not identified during this inspection.

5.

Independent Inspection The inspector examined the following areas:

a.

Excavation and foundation preparation for Units 3 and

b.

Partial placement of concrete pour number 1FHIW 257025 in the fuel handling building c.

Installation of reinforcing steel and preparation for concrete pours in units 1 and 2 containment buildings and RAB building.

Lakes Dams and Canals - Observation of Work and Work Activities, Units 1, 2,

3 and 4.

The inspector performed a followup inspection of subsurface preparation at the Main Dam and West Auxilary Dam.

Acceptance criteria examined by the inspector were:

a.

PSAR, Section 2 and Appendix 2E b.

SER, Section 2.5 cd CAR-SH-CH-4, Embankments and Dams, Dikes and Channels d.

CAR-SH-CH-ll, Ebasco specification, Drilling and Grouting e.

Drawings CAR-2167-G6241 through CAR-2167-G-6245, Reservoir, Main Dam, Profile and Typical Sections f.

Drawings CAR-2167-6270, 6272 and 6273, Reservoir, West Auxiliary Dam, General Plan, Profile and Typical Observations included examination of excavations, geologic mapping and grouting~ and placement of impervious fillin the Main Dam and West Auxiliary Dam core trenches.

Areas examined are as follows'.

a.

West Auxiliary Dam Results of consolidation grouting between stations 0400 to 6+25 and stations 9+05 to 20+00 (2)

Results of curtain grouting between stations 00 to 3+85 and stations 10+05 to 20+00 (3)

Geologic mapping between stations-1+60 to 14+05 and results of excavations between stations 14+05 to -1+60.

Observations in-cluded preliminary mapping on an extension of the plant fault across dam station 4+27.

The licensee reported the fault to NRR in a letter from M. A. McDuffie to H. R. Denton, dated June 13, 1979.

(4)

Placement of impervious fillin the separating dike b.

Main Dam (1). Results of consolidation grouting between stations 2+00 to 4+50 and >00 to station 12+50.

(2)

Results of curtain grouting between stations 2+00 to 4+5 (3)

Results of excavation cleaning and mapping between stations 5+50 to 12+50.

(4)

Hand compaction of impervious fillat station 4+00.

No deviations or items of noncompliance were identified.