IR 05000397/1985017

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Position Re Validity of Violation Identified in Insp Rept 50-397/85-17. Info/Position Will Be Evaluated by Nrc.Util Will Be Notified of Findings
ML17278A380
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 09/11/1985
From: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Sorenson G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17278A381 List:
References
NUDOCS 8509160401
Download: ML17278A380 (2)


Text

Docket No.

50-397

"/7 SEP IiIssue Washington Public Power Supply System P. 0. Box 968 3000 George Washington Way Richland, Washington 99352 Attention:

Mr.

G.

C. Sorensen Manager of Regulatory Programs Gentlemen:

Thank you for your letter dated August 21, 1985, informing us of your position regarding the validity of the violation identified in NRC Inspection Report 85-17.

Your information/position will be evaluated by the NRC and you will be notified of our findings.

Sincerely, Or<oinat s1gnad bp

~. F. Kirsch D. P. Kirsch, Acting Director Division of Reactor Safety and Projects cc:

C.

M.

P. L.

R.

BE J.

D.

G. E.

W.

G.

N. S.

State Powers, WNP-2 Powell, WNP-2 Glasscock, WNP-2 Martin, WNP-2 Doupe, Esq.9 WPPSS Conn, Burns 8 Roe, Inc.

Reynolds, Esq.,

Bishop, Liberman of WA bcc:

RSB/Document Control Desk (RIDS)

Mr. J. Martin, RV Mr. B. Paulkenberry9 RV G. Cook, RV Resident, Inspector RV CClark:dh 9/g /85 9//D/85

/

PJo on DKir h

9//0 /85 ~1, 9/ /g /85 7i ~

8509160401 800911 PDR

'*DOCK 00000097

PDR

~g h

I

  • ,

rtl$

t,'gK H

l'

V r

r I