IR 05000397/1985005

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-397/85-05
ML17277B739
Person / Time
Site: Columbia 
Issue date: 05/17/1985
From: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
References
NUDOCS 8505210166
Download: ML17277B739 (2)


Text

Docket No. 50-397 NAY 17 1985 Washington Public Power Supply System P. 0.

Box 968 3000 George Washington Way Richland, Washington 99352 Attention:

Mr.

G.

C. Sorensen, Manager Regulatory Programs Gentlemen:

t Thank you for your letter dated April 17, 1985, informing us of the steps you have taken to correct the items which we brought to your attention in our letter dated March 19, 1985.

Your corrective actions will be verified during a future inspection.

Your cooperation with us is appreciated.

Sincerely, Original signed by D. F, Kirsch D. P. Kirsch, Acting Director Division of Reactor Safety and Projects CC:

C.

M.

P. L.

R. B.

State N. S.

Powers, WNP-2 Plant Manager Powell, WNP-2 Licensing Manager Glasscock, Director, Assurance

Licensing of WA (Curtis Eschels)

Reynolds bcc:

RSB/Document Control Desk (RIBS)

Mr. J. Martin Resident Inspector

'v P(}ualls:dh 5/ @85 P ognson 5/i

/85 DKir ch 5/g /85 8505210ih6 8505i7 PDR ADOCK 05000397

PDR

Y.

l