IR 05000395/1987025

From kanterella
Jump to navigation Jump to search
Insp Rept 50-395/87-25 on 870810-13.No Violations or Deviations Noted.Major Areas Inspected:Housekeeping,Matl Identification & Control,Matl Control,Inservice Testing of Pumps & Valves & LER Followups
ML20237K407
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 08/26/1987
From: Blake J, Kleinsorge W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20237K397 List:
References
50-395-87-25, NUDOCS 8709040335
Download: ML20237K407 (8)


Text

-, _ - _ _ _ _ _ - -. _ - _ _

UNITED STMES cJt KEcug[..

.,.

.

NUCLEAR REGULATORV COMMISSION

[.;

-/

'

o j!

[,

rn REGION 11

,

i g -f

'[

101 MARIETTA STREET, N.W.

l

' t --

ATLANTA, GEORGIA 30323 L

$g...,./

.

. Report No.:

50-395/87-25 Licensee:

South Carolina Electric and Gas Company Columbia, SC 29218

~ Docket. No.:

50-395 License No.:

NPF-12-Facility Name:

Summer Inspection d:

u ust 10-13, 1987 Inspect r:

  1. 4

W. P. K4e'insorge Date Signed i

Acco any ng 1:

M. M. Glasman Approved by:

8/5 /87 J.

Taks, Section Chief Date' Signed

'

.

E gi eering Branch-iv sion of Reactor Safety

SUMMARY

Scope:

This routine, announced inspection was conducted in the areas' of j licensee actions.on previous enforcement matters (92701B) (927028), housekeeping (548348), material identification and control (4290213), material control (42940B). Inservice Testing (IST) of pumps and valves (73756), Licensee Event Report (LER) follow-up and inspector f.0110w-up items.

Results:

No violations or deviations were identified, hD?Oj0$CM05000395 35 B70020 G

PDR

_____. _ _ _. _ _ _ _

__

__.

-

_ _ _ __.___ _ _ _

_ _ _ _

i l I

.

I l I

REPORT DETAILS

1. Persons Contacted

Licensee Employees j

i

  • 0. S. Bradham, Director, Nuclear Operations

{

  • M. D. Quinton, Manager, Maintenance Services
  • W. R. Higgins, Associate Manager of Regulatory Compliance
  • L. B. Collier, Welding Supervisor Other licensee employees contacted included engineers, technicians, security office members, and office personnel.

NRC Resident Inspectors R. Prevatte, Senior Resident Inspector P. Hopkins, Resident Inspector

  • Attended exit interview

2. Exit Interview

The inspection scope and findings were summarized on August 13, 1987, with those persons indicated in paragraph 1 above. The inspector described the areas inspected. No dissenting comments were received from the licensee.

The licensee did not identify as proprietary any of the materials provided to or reviewed by the inspectors during this inspection.

i

3. Licensee Action on Previous Enforcement Matters (927018) (927028)

l (0 pen) Unresolved Item 50-395/86-18-01:

"VT-2 Eye Examination" This item concerns the eye examinations given to Operations Personnel Performing VT-2 Ex:.minations in accordance with ASME Boiler and Pressure (ASME B&PV) Code Section XI.

The item concerned the equivalency of the SCE&G eye test with that specified in ASME B&PV Section XI. To avoid any questions, the licensee is retesting all operations VT-2 examination personnel with a test identical to that specified by ASME B&PV Section

'

XI. To date all but 14 examiners have been tested and found optically qualified to perform VT-2 examinations.

Pending the completion of the I

examinations of the remaining 14 VT-2 examiners (confirming that all past VT-2 examinations were performed by optically qualified examiners) this matter will remain open.

l

4. Unresolved Items

Unresolved items were not identified during this inspection.

L____-_.

__

___ - _ _ _ _ _ - _

_

__

_ _ _ _ _ _ _ _ _

._

_ _ _ _ _ _ _ _ _

- _ - _ _ _ _

__

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _

.

.

'

5. Independent Inspection Effort

l-Housekeeping (54834B), Material Identification and Control (42902B) and Material Control (42940B)

The inspector conducted a general inspection of protected area to observe activities such as housekeeping, material identification and control;

,

l material control, and storage.

Within the areas examined, no violations or deviations were identified.

6. Inservice Testing (IST) of Pumps and Valves (73756)

The inspectors reviewed procedures, observed work activities and reviewed pertinent quality records as indicated below to determine whether inservice testing regulatory requirements and licensee commitments are l

being met.

The applicable code for IST of valves is ASME Boiler and Pressure (ASME B&PV) Code Section XI 1977 Edition Summer 1978 Addenda i

(77S78), The applicable code for IST of pumps is ASME B&PV Code Section XI, 80W80 as documented SCE&G 1etter from O. W. Dixon, Jr.,

to H. R. Denton, Director of the office Nuclear Reactor Regulations dated l

May 23, 1983.

a.

The inspectors interviewed Licenseee/ Contractor personnel and

. reviewed the below listed documents to verify that the licensee has assigned responsibilities to persons and organizations for:

preparation, review, and approval of IST procedures; scheduling of IST for normal and increased frequency testing; performance of testing per approved procedures; performance of post-maintenance and post-modification IST; proper certification and calibration of IST

"

instruments; and training for those personnel responsible for implementing IST procedures.

DOCUMENTS REVIEWED

SCE&G-SAP-134,

" Control of Station-

Rev. 4

Survelliance Test Activities"

SCE&G-SAP-139,

" Procedure Development,

Rev. 9

Review Approval and Control"

SCE&G-SAP-141,

" Control of Calibration of

Rev. 3

Measuring and Test Equipment"

SCE&G-SAP-145,

" Inservice Inspection"

Rev. 2

SCE&G-SAP-601

" Application, Scheduling and

Rev. 3

Handling of Maintenance

Activities"

_ _ _ _ _ - _ _ _ _ _ _ _ -

- _ _ _ _ - _ _ _ _ _ _

__

_. _ _ _

-

_

_.

.

l

l

SCE&GTP-301,

" Gen 6ral

Procedure

for

j

Rev. 1

Inservice Testing of Pumps"

'

i

SCE&G-GTP-302,

" General

Procedure

for

Rev. 1

Inservice Testing of Valves"

b.

The inspectors reviewed the below listed completed procedures to

verify that these procedures are the latest ones approved and that

!

test acceptance criteria used were valid for the component being

tested.

Procedures Reviewed

Identification

Title

SCE&G-STP-115.016,

" Components Cooling

Rev. 5

System Leakage

Test"

SCE&G-STP-130.005

" Valve Operability

Rev. 2

Testing (Mode 5)"

SCE&G-STP-401.003

" Code Relief Valves

Rev. 2

ASME XI Tests"

SCE&G-STP-130.003

" Valve Operability

Rev. 1

Testing (Modes 1, 2,

and 3)"

SCE&G-STP-121.002

" Main Steam Valve

Rev. 7

Operability Test"

SCE&G-STP-401.001

" Pressurizer Code

Rev. 4

Safety Valves ASME

Section XI Test"

SCE&G-115.006

" Chemical and Volume

Rev. 5

Control System Valve

J

Leakage Test"

SCE&G-112.002

" Reactor Building Spray

Rev. 12

Pump Test"

SCE&G-120.002

" Turbine Building

Rev. 16

Emergency Feedwater

Pump Test"

SCE-129.001

"HVAC Chilled Water

Rev. 10

Pump Test"

SCE&G-123.002

" Service Water System

Rev. 8

Pump Test"

l

.____---------____

-_-__

__

-

.

Valves Examined

Valve

Valve

Valve

No

Category

Type

System

SVC-9600

A

MOV

Component Cooling Water

XVR-8117

A/C

Relief

Chemical Volume and Control

XVR 8010B

C

Relief

Reactor Coolant

XVC 2876A

C

Check

Main Steam

XVG-1037A

B

MOV

Emergency Feedwater

IFV-3321

B

ADV

Feedwater

AVO - Air Operated Valve

MOV - Motor Operated Valve

Pumps Examined

Pump

Pump

No

Description

XPP-0038A

"A Motor Driven Centrifugal Reactor Building Spray

XPP-0008

Turbine Driven Centrifugal Emergency Feedwater

XPP--0039C

"C" Mot r Criven Centrifugal Service Water

XPP-0048B

"B" HVAC Centrifugal Chilled Water

Procedure No.

Valve / Pump No.

STP-130.005

XVC 9600

STP-115.016

XVC 9600

STP-130.005

WVG 1037A

STP-121.002

XVC 2876A

STP-401.001

XVR 8010B

STP-401.003

XVR 8117

STP-115.006

XVR 8117

STP-130.003

IFV3321

STP-120.002

XPP-0008

STP-123.002

XPP-0039C

STP-112.002

XPP-0038A

.

STP-129.001

XPP-0048B

___

_

l

'

-

.

L.

'

I

t

.c.

The inspectors reviewed the last six completed procedures for the

above listed pumps and valves to verify that the licensee performed

IST per an approved schedule within the limitations described in the

IST program, including increased frequency testing.

!

d.

The inspectors reviewed the last six completed procedures for the

above indicated pumps / valves to verify that inservice test results

were recorded per the approved procedures and that data was evaluated

within the time constraints delineated in the appropriate edition of

the ASME Code Section XI, Subsections IWP and IWV.

e.

The inspectors reviewed the last six completed procedures for the

above indicated pumps and valves to ensure that IST procedures and

data reflect all requirements of the appropriate editien of the ASME

Code Section XI, including:

evaluations cf imposing and removing

increased

frequency

testing

requirements;

evaluation

and

justification of changes to test acceptance criteria; pump vibration

l'

test data analysis and acceptance criteria justification, including

locations of vibration measurement; requirements that pump tests be

conducted at reference conditions, including reference speed;

'

compliance of test instruments to 10 CFR 50 and ASME Code

requirements; performance of positive testing of Category C check

valves whose safety function is to open and close; evaluation of

Category A valve leak test data conducted in accordance with ASME

IWV-3426 and -3427 guidelines and including containment isolation and

pressure isolation valves; testing of safety and relief valves in

accordance with ASME IWV-3510 through -3513; observation of remote

position indicators, including those on the remote shutdown panels,

at least once 'every two years to verify that valve operation is

!

accurately indicated; and indication that valve stroke times are

commensurate with the capabilities of the valve tested.

f.

The inspectors reviewed the data for the above indicated pumps and

'1

valves for the last six intervals to verify that IST data was

evaluated per the requirements of ASME Code Section XI, subsections

IWP and IWV, and 10 CFR 50.55a(g) and ensured that appropriate

,

follow-up actions were taken.

j

!

g.

The inspectors examined selected records to verify that IST records

are maintained as delineated

in ASME IWP-6000 and IWV-6000; and

'

Engineering evaluations are sufficient to justify changes to reference

values and removal of increased frequency testing requirements should

be documented and reviewed.

i

_ - _ _ _

_

. _ _ _ _ _ _ _ _ _ - _ _

_ _ - __

_-

- _ _ _ _ _ - _ _. - _ _ - - - _ _ - _ _ _ _ _ _ _.

_ _ _ _ _ _ _ _ _ _ _. _ _ _ _ _ _ _ _ - _ _ - _ - _ _ _ _ _

-

.

h.

Observations

(1) The licensee was not able, during this inspection, to located

.

sufficient records for the inspectors to evaluate compliance in

the area of valve testing.

The licensee indicated that they

would locate the following:

dates of cold shut downs lasting longer than 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />

-

-

completed procedures for the last six valve tests fur the

above indicated valves

effective dates of the above completed procedures

-

(2) The licensee was not able, during this inspection, to locate

!

the objective quality evidence to support the establishment of

the reference values contained in the above four pump test

procedures. The licensee indicated that they would locate the

same.

(3) The inspectors indicated that the above would be examined during

future inspections.

Within the areas examined no violations or deviations were identified.

7.

Licensee Event Report (LER) Follow-up

,

l

The.following LER was reviewed and closed. The inspectors verified that

reporting requirements had been met, causes had been identified, corrective

actions appeared appropriate, generic applicability had been considered,

and the LER forms were complete.

The inspectors also verified that the

licensee had reviewed the event, corrective action had been taken, no

{

unreviewed safety questions were involved, and violations of regulations

-

or Technical Specification conditions had been identified.

(Closed)87-007 " Steam Generator Tube Misplugging"

j

8.

Inspector Follow-up Items

(Closed) Item 50-395/85-08-02

<

This item concerns whether valves XVG 9503A and B in the component cooling

j

water system should be included in the IST program.

The licensee claims that these valves were not include in the IST program

based on discussions which occurred during meetings held on February

24-25, 1982, between NRC and SCE&G regarding the IST program for pumps and

valves.

This meeting was documented in a March 16, 1982, letter to the

licensee. The licensee contends that inclusion of the subject valves and

other valves of similar function which do not received an automatic ESF

signal represents a departure from a previous NRC interpretation.

. _. __ ___ _-

_

. _ _ _ _ _ _ - _ _ _

__ - _ - _ - _ - _ - _ _ _

__

_ _ _ - _

!-

p

..

-

l

The March 16, letter indicates " Listed Valves" have no safety function.

Therefore, it follows that the " Listed Valves" would not be required to be

includac' in the IST program.

Unfortunately, the March 16, 1982, letter

does not identify the " Listed Valves."

The licensee presented the -

inspectors a photocopy of'an unsigned handwritten document; apparently the

notes from which the March 16, 1982 letter was written.

This document

indicates that Valves XVG 9503A and B are among the " Listed Valves." This

matter was left open pending the legitimization of the unsigned photocopy

,

of handwritten notes.

Subsequently, the inspectors have reviewed the trip report covering

the

February 24-25,

1982. meeting and discussed the above with

'

Mr.

H. C. Rockhold of EG&G Idaho an attendee of February 24-25, 1987

meeting.

The inspectors have determined that Valves 9503 A & B were

intended to be part of the " Listed Valves" (Paragraph N 9 of Enclosure I

to the March 16, 1982 letter). Therefore, the valves are not required to

be included in the IST program because EG&G Idaho determined that they

provide no safety function. This matter is considered closed,