UNITED STMES cJt KEcug[..
.,.
.
NUCLEAR REGULATORV COMMISSION
[.;
-/
'
o j!
[,
rn REGION 11
,
i g -f
'[
101 MARIETTA STREET, N.W.
l
' t --
ATLANTA, GEORGIA 30323 L
$g...,./
.
. Report No.:
50-395/87-25 Licensee:
South Carolina Electric and Gas Company Columbia, SC 29218
~ Docket. No.:
50-395 License No.:
NPF-12-Facility Name:
Summer Inspection d:
u ust 10-13, 1987 Inspect r:
- 4
W. P. K4e'insorge Date Signed i
Acco any ng 1:
M. M. Glasman Approved by:
8/5 /87 J.
Taks, Section Chief Date' Signed
'
.
E gi eering Branch-iv sion of Reactor Safety
SUMMARY
Scope:
This routine, announced inspection was conducted in the areas' of j licensee actions.on previous enforcement matters (92701B) (927028), housekeeping (548348), material identification and control (4290213), material control (42940B). Inservice Testing (IST) of pumps and valves (73756), Licensee Event Report (LER) follow-up and inspector f.0110w-up items.
Results:
No violations or deviations were identified, hD?Oj0$CM05000395 35 B70020 G
_____. _ _ _. _ _ _ _
__
__.
-
_ _ _ __.___ _ _ _
_ _ _ _
i l I
.
I l I
REPORT DETAILS
1. Persons Contacted
Licensee Employees j
i
- 0. S. Bradham, Director, Nuclear Operations
{
- M. D. Quinton, Manager, Maintenance Services
- W. R. Higgins, Associate Manager of Regulatory Compliance
- L. B. Collier, Welding Supervisor Other licensee employees contacted included engineers, technicians, security office members, and office personnel.
NRC Resident Inspectors R. Prevatte, Senior Resident Inspector P. Hopkins, Resident Inspector
- Attended exit interview
2. Exit Interview
The inspection scope and findings were summarized on August 13, 1987, with those persons indicated in paragraph 1 above. The inspector described the areas inspected. No dissenting comments were received from the licensee.
The licensee did not identify as proprietary any of the materials provided to or reviewed by the inspectors during this inspection.
i
3. Licensee Action on Previous Enforcement Matters (927018) (927028)
l (0 pen) Unresolved Item 50-395/86-18-01:
"VT-2 Eye Examination" This item concerns the eye examinations given to Operations Personnel Performing VT-2 Ex:.minations in accordance with ASME Boiler and Pressure (ASME B&PV) Code Section XI.
The item concerned the equivalency of the SCE&G eye test with that specified in ASME B&PV Section XI. To avoid any questions, the licensee is retesting all operations VT-2 examination personnel with a test identical to that specified by ASME B&PV Section
'
XI. To date all but 14 examiners have been tested and found optically qualified to perform VT-2 examinations.
Pending the completion of the I
examinations of the remaining 14 VT-2 examiners (confirming that all past VT-2 examinations were performed by optically qualified examiners) this matter will remain open.
l
4. Unresolved Items
Unresolved items were not identified during this inspection.
L____-_.
__
___ - _ _ _ _ _ - _
_
__
_ _ _ _ _ _ _ _ _
._
_ _ _ _ _ _ _ _ _
- _ - _ _ _ _
__
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _
.
.
'
5. Independent Inspection Effort
l-Housekeeping (54834B), Material Identification and Control (42902B) and Material Control (42940B)
The inspector conducted a general inspection of protected area to observe activities such as housekeeping, material identification and control;
,
l material control, and storage.
Within the areas examined, no violations or deviations were identified.
6. Inservice Testing (IST) of Pumps and Valves (73756)
The inspectors reviewed procedures, observed work activities and reviewed pertinent quality records as indicated below to determine whether inservice testing regulatory requirements and licensee commitments are l
being met.
The applicable code for IST of valves is ASME Boiler and Pressure (ASME B&PV) Code Section XI 1977 Edition Summer 1978 Addenda i
(77S78), The applicable code for IST of pumps is ASME B&PV Code Section XI, 80W80 as documented SCE&G 1etter from O. W. Dixon, Jr.,
to H. R. Denton, Director of the office Nuclear Reactor Regulations dated l
May 23, 1983.
a.
The inspectors interviewed Licenseee/ Contractor personnel and
. reviewed the below listed documents to verify that the licensee has assigned responsibilities to persons and organizations for:
preparation, review, and approval of IST procedures; scheduling of IST for normal and increased frequency testing; performance of testing per approved procedures; performance of post-maintenance and post-modification IST; proper certification and calibration of IST
"
instruments; and training for those personnel responsible for implementing IST procedures.
DOCUMENTS REVIEWED
SCE&G-SAP-134,
" Control of Station-
Rev. 4
Survelliance Test Activities"
SCE&G-SAP-139,
" Procedure Development,
Rev. 9
Review Approval and Control"
SCE&G-SAP-141,
" Control of Calibration of
Rev. 3
Measuring and Test Equipment"
SCE&G-SAP-145,
" Inservice Inspection"
Rev. 2
SCE&G-SAP-601
" Application, Scheduling and
Rev. 3
Handling of Maintenance
Activities"
_ _ _ _ _ - _ _ _ _ _ _ _ -
- _ _ _ _ - _ _ _ _ _ _
__
_. _ _ _
-
_
_.
.
l
l
SCE>P-301,
" Gen 6ral
Procedure
for
j
Rev. 1
Inservice Testing of Pumps"
'
i
SCE&G-GTP-302,
" General
Procedure
for
Rev. 1
Inservice Testing of Valves"
b.
The inspectors reviewed the below listed completed procedures to
verify that these procedures are the latest ones approved and that
!
test acceptance criteria used were valid for the component being
tested.
Procedures Reviewed
Identification
Title
SCE&G-STP-115.016,
" Components Cooling
Rev. 5
System Leakage
Test"
SCE&G-STP-130.005
" Valve Operability
Rev. 2
Testing (Mode 5)"
SCE&G-STP-401.003
" Code Relief Valves
Rev. 2
ASME XI Tests"
SCE&G-STP-130.003
" Valve Operability
Rev. 1
Testing (Modes 1, 2,
and 3)"
SCE&G-STP-121.002
" Main Steam Valve
Rev. 7
Operability Test"
SCE&G-STP-401.001
" Pressurizer Code
Rev. 4
Safety Valves ASME
Section XI Test"
SCE&G-115.006
" Chemical and Volume
Rev. 5
Control System Valve
J
Leakage Test"
SCE&G-112.002
" Reactor Building Spray
Rev. 12
Pump Test"
SCE&G-120.002
" Turbine Building
Rev. 16
Emergency Feedwater
Pump Test"
SCE-129.001
"HVAC Chilled Water
Rev. 10
Pump Test"
SCE&G-123.002
" Service Water System
Rev. 8
Pump Test"
l
.____---------____
-_-__
__
-
.
Valves Examined
Valve
Valve
Valve
No
Category
Type
System
SVC-9600
A
Component Cooling Water
XVR-8117
A/C
Relief
Chemical Volume and Control
XVR 8010B
C
Relief
XVC 2876A
C
Check
XVG-1037A
B
Emergency Feedwater
IFV-3321
B
ADV
AVO - Air Operated Valve
MOV - Motor Operated Valve
Pumps Examined
Pump
Pump
No
Description
XPP-0038A
"A Motor Driven Centrifugal Reactor Building Spray
XPP-0008
Turbine Driven Centrifugal Emergency Feedwater
XPP--0039C
"C" Mot r Criven Centrifugal Service Water
XPP-0048B
"B" HVAC Centrifugal Chilled Water
Procedure No.
Valve / Pump No.
STP-130.005
XVC 9600
STP-115.016
XVC 9600
STP-130.005
WVG 1037A
STP-121.002
XVC 2876A
STP-401.001
XVR 8010B
STP-401.003
XVR 8117
STP-115.006
XVR 8117
STP-130.003
IFV3321
STP-120.002
XPP-0008
STP-123.002
XPP-0039C
STP-112.002
XPP-0038A
.
STP-129.001
XPP-0048B
___
_
l
'
-
.
L.
'
I
t
.c.
The inspectors reviewed the last six completed procedures for the
above listed pumps and valves to verify that the licensee performed
IST per an approved schedule within the limitations described in the
IST program, including increased frequency testing.
!
d.
The inspectors reviewed the last six completed procedures for the
above indicated pumps / valves to verify that inservice test results
were recorded per the approved procedures and that data was evaluated
within the time constraints delineated in the appropriate edition of
the ASME Code Section XI, Subsections IWP and IWV.
e.
The inspectors reviewed the last six completed procedures for the
above indicated pumps and valves to ensure that IST procedures and
data reflect all requirements of the appropriate editien of the ASME
Code Section XI, including:
evaluations cf imposing and removing
increased
frequency
testing
requirements;
evaluation
and
justification of changes to test acceptance criteria; pump vibration
l'
test data analysis and acceptance criteria justification, including
locations of vibration measurement; requirements that pump tests be
conducted at reference conditions, including reference speed;
'
compliance of test instruments to 10 CFR 50 and ASME Code
requirements; performance of positive testing of Category C check
valves whose safety function is to open and close; evaluation of
Category A valve leak test data conducted in accordance with ASME
IWV-3426 and -3427 guidelines and including containment isolation and
pressure isolation valves; testing of safety and relief valves in
accordance with ASME IWV-3510 through -3513; observation of remote
position indicators, including those on the remote shutdown panels,
at least once 'every two years to verify that valve operation is
!
accurately indicated; and indication that valve stroke times are
commensurate with the capabilities of the valve tested.
f.
The inspectors reviewed the data for the above indicated pumps and
'1
valves for the last six intervals to verify that IST data was
evaluated per the requirements of ASME Code Section XI, subsections
IWP and IWV, and 10 CFR 50.55a(g) and ensured that appropriate
,
follow-up actions were taken.
j
!
g.
The inspectors examined selected records to verify that IST records
are maintained as delineated
in ASME IWP-6000 and IWV-6000; and
'
Engineering evaluations are sufficient to justify changes to reference
values and removal of increased frequency testing requirements should
be documented and reviewed.
i
_ - _ _ _
_
. _ _ _ _ _ _ _ _ _ - _ _
_ _ - __
_-
- _ _ _ _ _ - _ _. - _ _ - - - _ _ - _ _ _ _ _ _ _.
_ _ _ _ _ _ _ _ _ _ _. _ _ _ _ _ _ _ _ - _ _ - _ - _ _ _ _ _
-
.
h.
Observations
(1) The licensee was not able, during this inspection, to located
.
sufficient records for the inspectors to evaluate compliance in
the area of valve testing.
The licensee indicated that they
would locate the following:
dates of cold shut downs lasting longer than 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />
-
-
completed procedures for the last six valve tests fur the
above indicated valves
effective dates of the above completed procedures
-
(2) The licensee was not able, during this inspection, to locate
!
the objective quality evidence to support the establishment of
the reference values contained in the above four pump test
procedures. The licensee indicated that they would locate the
same.
(3) The inspectors indicated that the above would be examined during
future inspections.
Within the areas examined no violations or deviations were identified.
7.
Licensee Event Report (LER) Follow-up
,
l
The.following LER was reviewed and closed. The inspectors verified that
reporting requirements had been met, causes had been identified, corrective
actions appeared appropriate, generic applicability had been considered,
and the LER forms were complete.
The inspectors also verified that the
licensee had reviewed the event, corrective action had been taken, no
{
unreviewed safety questions were involved, and violations of regulations
-
or Technical Specification conditions had been identified.
(Closed)87-007 " Steam Generator Tube Misplugging"
j
8.
Inspector Follow-up Items
(Closed) Item 50-395/85-08-02
<
This item concerns whether valves XVG 9503A and B in the component cooling
j
water system should be included in the IST program.
The licensee claims that these valves were not include in the IST program
based on discussions which occurred during meetings held on February
24-25, 1982, between NRC and SCE&G regarding the IST program for pumps and
valves.
This meeting was documented in a March 16, 1982, letter to the
licensee. The licensee contends that inclusion of the subject valves and
other valves of similar function which do not received an automatic ESF
signal represents a departure from a previous NRC interpretation.
. _. __ ___ _-
_
. _ _ _ _ _ _ - _ _ _
__ - _ - _ - _ - _ - _ _ _
__
_ _ _ - _
!-
p
..
-
l
The March 16, letter indicates " Listed Valves" have no safety function.
Therefore, it follows that the " Listed Valves" would not be required to be
includac' in the IST program.
Unfortunately, the March 16, 1982, letter
does not identify the " Listed Valves."
The licensee presented the -
inspectors a photocopy of'an unsigned handwritten document; apparently the
notes from which the March 16, 1982 letter was written.
This document
indicates that Valves XVG 9503A and B are among the " Listed Valves." This
matter was left open pending the legitimization of the unsigned photocopy
,
of handwritten notes.
Subsequently, the inspectors have reviewed the trip report covering
the
February 24-25,
1982. meeting and discussed the above with
'
Mr.
meeting.
The inspectors have determined that Valves 9503 A & B were
intended to be part of the " Listed Valves" (Paragraph N 9 of Enclosure I
to the March 16, 1982 letter). Therefore, the valves are not required to
be included in the IST program because EG&G Idaho determined that they
provide no safety function. This matter is considered closed,