Insp Rept 50-395/87-04 on 870201-28.No Violations or Deviations Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings,Onsite Followup of Events & Written Observations & Monthly Surveillance & Maint Observations
ML20207T223
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 03/04/1987
From: Dance H, Hopkins P, Prevatte R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20207T219 List:
References
50-395-87-04, 50-395-87-4, NUDOCS 8703230321
Download: ML20207T223 (7)


Text

_

_ . - -__ -__ ____

__ - __ - _ - ___-

s i

.4

,

  1. Moo -o UNITE 3 STATES NUCLEAR REGULATORY COMMISSION
  • o,$

.

p [ REGION 11

$ ' MARIETTA STREET. t* * ATLANTA, GEORGI A 30323 s

.....

r. ,

, Report No. :- 50-395/87-04 Licensee : _ South Carolina Electric and Gas Company Columbia, SC 29218

i Docket No. : 50-395 License No. : NPF-12 i Facility Name : V. C. Summer Inspection Condu ed : ebrua y 1 - 28, 1987 Inspector : < b T Rich rd L.'P evatte Date Signeti ,

>> a~u> -

> $4 I Psrry_C. Hopkins # Date Signed Approved by : k -

I Hugh W. Dance,-Section Chief Date Signed Division of Reactor Projects SUMMARY Scope: This routine, announced inspection was conducted by the resident inspectors onsite, in the areas of licensee action on previous inspection findings, onsite followup of events and subsequent written reports, monthly surveillance observations, monthly maintenance observation, operational safety verification, refueling activities and other area Results: No violations or deviations were identifie B70304 gDR ADOCK 05000395 PDR

- - - _ - - - \

nc

.

REPORT DETAILS Persons Contacted Licensee Employees D. Nauman, Vice President, Nuclear Operations-0. Bradham, Director, Nuclear Plant Operations -

J. biolds, Deputy Director, Operations and Maintenance G. Soult,~ Manager, Operations M. Browne, Group _. Manager, Technical and Support Services M. Quinton, Manager, Maintenance Services A. Koon, Manager, Technical Support G. Putt, Manager, Scheduling and Materials Management K. Woodward, Manager, Nuclear Education and Training L. Blue, Manager, Support Services S. Hunt, Manager, Quality Assurance Surveillance Systems K. Beale, Manager Nuclear Protection Services W. Higgins, Associate Manager, Regulatory Compliance B. Williams, Supervisor, Operations Other licensee employees contacted included engineers, technicians, operators, mechanics, security force members, and office personne . ExitInterview(30702,30703)

The inspection scope and findings were summarized on March 2, 1987, with those persons indicated in paragraph 1 above. The inspectors described the areas inspected and discussed the inspection findings. The licensee did not identify as proprietary any of the materials provided to or reviewed by the inspectors during the inspectio . Licensee Action on Previous inspection Findings (92701, 92702)

(Closed) Violation 86-13-01, Failure to perform hourly fire watch patrol. The licensee provided a written response to this violation in a letter to Region II, dated September 5, 1986. The inspectors reviewed the licensee's response and corrective actions implemented to prevent recurrence. Followup inspections by the resident inspectors indicated that this item has been adeauataly addressed and resolved. This item is close (Closed) Inspection Followup Item 82-41-13, Procedures for transients and accidents, license condition first refueling (1.C.1, SSER 4). This iten is administrative 1y closed on the open items listing. It will still be tracked until closed under TMI action plan listing of open items as item 1.C.1.3 . Monthly Surveillance Observation (61726)

-

y ,

-

.

.

2-

<

. The inspectors' observed surveillance activities of. safety related systems and components to ascertain that these. activities were conducted in accordance with license requirements. . The .. inspectors

. observed portions of selected: surveillance-tests including all aspects of-one major surveillance test involving safety- related system The-inspectors also -verified that .the required administrative approvals were obtained prior to initiating the~ test, that the testing was accomplished by qualified personnel, that required test instrumentation was properly

. calibrated, that' data' met TS requirements,' that test discrepancies were rectified,- and that the systems were properly returned to service. The

.

^

-following specific surveillance activities were observed:-

'

STP 122.002 Component cooling. water pump test STP 125.002 Diesel generator operability test STP 113.001 Remote shutdown instruments channel check STP 128.001 Electric fire pump weekly test STP 555.001 Spent fuel ventilation canister test STP 555.00 Spent-fuel pool ventilation system performance test STP 360.038 Reactor buildin monitor (RM-A4)g purge exhaust operational test atmospheric radiation STP 303.001 Reactor building pressure instrument (PT-950) operational test-No violations or deviations were identifie . MonthlyMaintenanceObservation(62703)

The inspectors observed maintenance activities of safety related systems and components to ascertain that these activities were conducted in accordance with approved procedures, TS and appropriate industry codes and standards. The inspectors also determined that the procedures used were adequate to control the activity, and that these activities ware accomplished by - qualified personne The inspectors independently verified that equipment was properly tested before being returned to servic Additionally, the inspectors reviewed -severa1 ' outstanding job orders to determine that the licensee was giving priority to safety related maintenance and a backlog which might affect its performance was not developing on a given system. The following specific maintenance activities were observed:

MWR 8750022 Investigate and repair door 304A, in the RCA MWR 8601858 Repair diesel fire pump exhaust system

,

.

.

MWR 20789002 ~ Perform wiring changes for modification.of service water pump speed switches MWR 317380017 Perform modifications to lock service water pump speed switches in high speed MWR 10723004 Install tubing, valves, mounting brackets, and flow indicator IFI 04587, in service water system MWR 85T0268 Change carbon in XAA 0021B canister MWR 87I0048 Investigate and repair.RM-A4 radiation monitor The inspectors, while observing the performance of maintenance activities during the month, noted the increased use of contractor personnel in the performance of these activitie Since these contractor personnel were performing basically the same type functions as members of the plant maintenance staff, the inspector decided to review the applicable procedures that govern the activities performed by these contracted personne A review of the resumes and documented training for two contractors, Primesouth and. Daniel Construction Corporation indicated that their presently assigned personnel are adequately qualified for their assigned tasks. However, numerous administrative errors were found in individual resumes and training record It was additionally noted that the administrative procedures which will govern Primescuth's activities are still in the developmental stage After discussing these deficiencies with the licensee, they agreed to immediately review the training records and resumes of all affected personne They additionally agreed to insure that individual record deficiencies would be cleared before the affected individuals are allowed to perform further work on safety related installation The licensee has committed to correcting all record discrepancies and implementing the administrative procedures for primesouth by March 13, 198 This item will be tracked by the inspector as an inspector followup item " Contractor Training Records ",

(87-04-01), until the corrective action is complete No violations or deviations were identifie . Operational Safety Verification (71707)

The inspectors toured the control room, reviewed plant logs, records and held discussions with plant staff personnel to verify that the plant was ' being operated safely and in conformance with applicable requirements. Specific items inspected in the control room included:

adequacy of staffing and attentiveness of control room personnel; TS and procedural adherence; operability of equipment and indicated control room status; control room logs, tagout books, operating orders, jumper / bypass controls; computer printouts and annunciators.

.

y-

.

Tours of other plant areas were conducted to verify equipment operability; control of ignition sources and combustible materials; the condition of fire detection and extinguishing equipment; the control of maintenance and surveillance activities in progress; the implementation of radiation protective controls and the physical security. plan. Tours were conducted during normal and random off hour period On February 16, 1987, the licensee identified that the Pressurizer Relief Tank (PRT) had been vented to the shutdown waste gas decay tank since November,1986, due to pressurizer safety valve leakage into the PR Due to an inadequate procedure, Health Physics was not notified and the surveillance requirements of Technical Specification (TS) 3.11.2.6, was not performed. This surveillance requires that the quantity of radioactive material contained in each gas storage tank be determined to be equal to or less than 160,000 curies of noble gas at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, when radioactive material is being added to the tan The licensee, upon discovery of this item, immediately performed the required surveillance and determined that the radioactive material in the applicable tank was well below the prescribed TS limits. A special instruction, PRT Venting and Pressure Control, SI 87-12, was issued by operations on February 17, 1987, to prevent recurrence of this even The licensee is additionally reviewing and making the necessary changes to the procedures that allowed this event to occu A review of the Reactor Coolant System chemistry and levels of radiation present in discharges to the shutdown waste gas decay tanks that have occurred since discovery of this item indicate the maximum level of radioactive material that could have been contair.ed in the tank during the time between venting the PRT to the waste gas decay tanks and their subsequent release was well below the applicable TS limi The licensee is currently preparing LER on this ite Since the NRC wants to encourage and support licensee initiative for self-identification and correction of problems, and since this item meets the applicable guidance of NRC enforcement policy for licensee identified items contained in 10 CFR 2, Appendix C, no violation will be issued for this ite No violations or deviations were identifie . Onsite Followup of Events and Subsequent Written Reports (92700,93713,93702)

The inspectors reviewed the following Licensee Event Reports (LER's) and Special Procedures Reports (SPR's) to ascertain whether the licensee's review, corrective action and report of the identified event or deficiency was in conformance with regulatory requirements, technical specifications, license conditions, and licensee procedures and controls. Based upon this review the following items are closed.

<

w-

.

,

.5 LER 86-13 Failure to perform hourly fire watch patrols SPR 86-013 Emergency diesel generator "B" non-valid failure LER'86-17- Failure to establish a continuous fire watch;

-SPR 86-015- Emergency diesel generator "B" breaker. tripped open on instantaneous overcurrent

.LER 86 003 Reactor trip /SI occurred as a result of a steamline low pressure signal generated during turbine roll up SPR 86-006 Reactor trip and safety inspection during a main turbine-roll up LER 86-009 Reactor tripped due to personnel error during testing of power range neutron detector channels No violations or deviations were identifie . Refueling Activities (60710)

The inspectors reviewed licensee progress to ascertain whether-pre-refueling activities specified in the Technical Specifications (TS)

-have been completed and whether refueling activities are being conducted as required by TS or approved procedures. Specifically, the inspectors (1) ' verified that al1~ surveillance testing required by the TS and licensee procedures for fuel handlin handling of fuel in the core, and (2)gverified is beingthat completed priortesting the periodic to the of refueling related equipment is being performed as required by TS or licensee administrative procedures. The performance of the following procedures were observed during the receipt of new fuel for the upcoming refueling outage:

FHP 607 Unpacking and handling of new fuel assemblies and shipping containers FHP 605 Receipt of new fuel and control components FHP 602 Limitations and precautions for handling new and partially spent fuel assemblies HPP 407 Controls for receipt of new fuel HPP 158 Contamination control for areas equipment and materials HPP 160 Controls and posting of radiation zones HPP 157 Personnel monitoring for contamination No violation or deviations were identified.

' .


------ - - - - - - - - - - - - - - - -

,,,, . . . .. ..

.

-

..

6 Other Areas The inspectors assisted Region II. inspectors and contract personnel ,in evaluating the emergency preparedness exercise conducted on February 11, 1987. The results of that inspection are documented in report 395/87-0 The resident inspector visited the H.B. Robinson plant during the week of February 23 to 27, 1987, to complete the site specific training requirements as a backup inspecto The resident inspectors assisted the Vendors Programs Branch during an inspection of penetration fire seals conducted at the Summer site on February 26, 27 and 28, 198 The inspection results will be documented in a separate repor i h

r