IE Insp Rept 50-395/81-35 on 811228-31.No Noncompliance Noted.Major Areas Inspected:Licensee Identified Items, Independent Insp & Inspector Followup Item
ML20040E732
Person / Time
Site: Summer 
Issue date: 01/18/1982
From: Conlon T, Gibbons T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20040E722 List:
References
50-395-81-35, IEB-78-04, IEB-78-4, NUDOCS 8202050293
Download: ML20040E732 (3)


Text

-

E UNITED STATES o%

NUCLEAR REGULATORY COMMISSION

$

$

REGION 11 101 MARIETTA ST., N.W., SUITE 3100 o,

s ATLANTA, GEORGIA 30303 s

Report No. 50-395/81-35 Licensee:

South Carolina Electric and Gas Company Columbia, SC 29218 Facility Name:

V. C. Summer Docket No. 50-395 License No. CPPR-94 Inspection at V. C. Summer Site near Columbia, South Carolina

/[I 6/8 2.

Inspector:

/

nW T. D. Gibbons Dat6 Signed Approved b d

M

/ - / 7 - F#--

T. E. Conlon, Section Chief Date Signed Engineering Inspection Branch Engineering and Technical Inspection Division SUMMARY Inspection on December 28-31, 1981 Areas Inspected This routine, unannounced inspection involved 29 inspector-hours on site in the areas of licensee actions on previous inspection findings, licensee identified items, independent inspection and inspector followup item.

Results Of the areas inspected, no violations or deviations were identified.

i 8202050293 820119 PDR ADOCK 05000395

PDR g

_

.

.

.

REPORT DETAILS 1.

Persons Contacted Licensee Employees

  • T. C. Nichols, Jr., Vi-President and Group Executive Nuclear Operations
  • 0. S. Bradham, Statio;. M: nager
  • W. A. Williams, Jr., General Manager Nuclear Operations
  • A. R. Koon, Technical Services Coordinator
  • C. Bailey, Supervisor Instrument and Controls
  • T. Brewer, Nuclear Engineer
  • D. A. Navman, Group Manager Nuclear Services
  • J. W. Parks, Technical Specialist
  • Attended exit interview 2.

Exit Interview

'

The inspection scope and findings were summarized on December 31, 1981 with those persons indicated in paragraph 1 above.

3.

Licensee Action on Previous Inspection Findings (Closed) Unresolved item 395/80-02-0'2 - Separation of Class 1E Circuits.

The licensee has responded to this item on January 16, 1982.

Region II forwarded the response to NRR for evaluation. NRR has responded that the (

information contained in the licensee response provides a technically acceptable conclusion to the problem. This item is closed.

4.

Unresolved Items Unresolved items were not identified during this inspection.

5.

Independent Inspection Effort The inspector examined electrical and instrumentation equipment in the auxiliary and fuel handling building to assure that the installations were completed in an acceptable manner.

Within the areas examined, there were no violations identified.

6.

Licensee Identified Items a.

(Closed) Item 395/79-20-02 - NAMCO Limit Switches (10 CFR 50.55(e)).

On June 14, 1979, the licensee notified Region II of a 50.55(e) item concerning NAMCO stem mounted valve limit switches. The final report was submitted on July 10, 1979. The report has been reviewed and

.

- _ - - - - - -. _. _

,

.

_

.

.

.

_

. - _ _.

_

..

.

.

..

.

t

determined to be acceptable.

The inspector held discussions with I

responsible licensee and/or contractor representatives, reviewed supporting documentation, and observed representative samples of work to verify that the corrective actions identified in the report have been completed.

.

b.

(Closed) Item 395/81-04-06 - Omission of Isolation. Devices (10 CFR 50.55(e)).

On January 29, 1981, the licensee notified Region II of a 50.55(e) item concerning omission of isolation devices.

The final

,

report was submitted on February 6, 1981.

The report has been reviewed and determined to be acceptable.

The inspector held

'

discussions with responsible licensee and/or contractor representa-tives, and reviewed supporting documentation to verify that the corrective actions identified in the report have been completed.

I c.

(Closed) Item 395/81-04-09 - Pinched Wire in Square D. MCC (10 CFR 50.55(e)). On February 6,1981, the licensee notified Region II of a 50.55(e) item concerning Square D 480 volt Motor Control Centers. The

final report was submitted on September 11, 1981. The report has been reviewed and detern;ined to be acceptable.

The inspector held discussions with responsible licensee and/or contractor representatives and reviewed supporting documentation to verify that the corrective action identified in the report has been completed.

7.

IE Bulletins (IEB) and Circular (IEC)

a.

(Closed) IEC 81-13, Torque Switch Electrical Bypass Circuit for Safeguard Service Valve Motors. The licensee has evaluated this item found that no control circuit designs call for the bypassing of

,

operator torque switches at this site.

I b.

(Closed) IEB No. 78-04, NAMCO Limit Switches, Unit 1.

Licensee letter of April 13, 1978, reports that the subject type NAMCO Limit Switches

)

are used on safety-related components at the station. The inspector has reviewed licensee letter of February 13, 1979, and determined that the request actions of the bulletin have been acceptably addressed.

The inspector held discussions with respcnsible licensee representa-tives, reviewed supporting documentation and observed representative i

samples of work to verify that the action! identified in the letter of response have been completed.

8.

Inspector Followup Item t

(Closed) 396/81-14-06 - Procedure for verifying the tightness of instru-mentation boxes.

The licensee has issued a revision to the maintenance procedures which requires that the tightening of concuits fastened to instrumentation boxes be inspected. The licensee is issuing maintenance work orders to complete the inspections.

.