Forwards IE Insp Rept 50-395/81-35 on 811228-31.No Noncompliance Noted
ML20040E721
Person / Time
Site: Summer 
Issue date: 01/19/1982
From: Kellogg P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Nichols T
SOUTH CAROLINA ELECTRIC & GAS CO.
Shared Package
ML20040E722 List:
References
NUDOCS 8202050282
Download: ML20040E721 (2)


See also: IR 05000395/1981035

Text

-

,

&N

'

'

JAN 191982

g

e

?

>

/),,

( hM. rD ,.

h

South Carolina Electric and Gas Company

  1. f.

f

-f

TD

-

ATTN: Mr. T. C. Nichols, Jr. , Vice President

%

['gf /ogq % q ?",j

.\\

p

Power Production and System Operations

P. O. Box 764

Columbia, SC 29218

M

'"

-

,

,

Gentlemen-

'

~

Subject: Report No. 50-395/81-35

This refers to the routine safety inspection conducted by Mr. T. D. Gibbons

of this office on December 28-31, 1981, of activities authorized by NRC

Construction Permit No. CPPR-94 for the V. C. Summer facility and to the dis-

cussion of our findings held with Mr. T. C. Nichols, Jr. , Vice President, at

the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

We have examined actions you have taken with regard to previously reported

unresolved items.

The status of these items is discussed in the enclosed

inspection report.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will

be placed in the NRC's Public Document Room unless you notify this office, by

telephone, within ten days of the date of this letter and submit written appli-

cation to withhold information contained therein within thirty days of the date

of this letter.

Such application must be consistent with the requirements of

2.790(b)(1).

Should you have any questions concerning this letter, we will be glad to disc"ss

them with you.

Sincerely,

n

j

y& f < mf

Paul J. Kellogg, Chief

Reactor Projects Branch 2

Division of Resident and

Reactor Project Inspection

Enclosure:

See Page 2

8202050282 820119

PDR ADOCK 05000395

PDR

h$N'

G

o

.

' South Carolina Electric and

2

JAN 1g g

-Gas _ Company

Enclosure:

Inspection Report No. 50-395/81-35

cc w/ enc 1:

J. B. Knotts, Jr.

O. S. Bradham, Station Manager

J. P. Harrison, Manager Nuclear

Security

C. A. Price, Manager, Nuclear

Engineering

A. A. Smith, Site QA Coordinator

bec w/ encl:

NRC Resident Inspector

Document Management Branch

State of South Carolina

,

!

4

i

RII

RII

RII

RII

RII

(Md'

hd

r

'

.-

TDGibbons:ht

T Coni n

P CEMurphy

e

ogg

12/ /81

4f/ /8I

12/g /EI

19//7 L

/8

IP/#/ 81_.

f

t -s ea

i fl

\\

V

,

.

1

L.