Text
g.
,
.
ouroy
UNITED STATES
8
1, NUCLEAR REGULATORY COMMISSION A
3'
-
E REGION ll
'#
101 MARIETTA sT., N.W., SulTE 3100 e$g
ATLANTA, GEORGIA 30303 j
.....
Report No. 50-395/80-19
,
Licensee: South Carolina Electric and Gas Company Columbia, SC 29218 Facility Name:
V. C. Summer Nuclear Station Docket No. 50-395
,
License No. CPPR-94 Inspection at V. C. Summer Nuclear Station near Columbia, South Carolina Inspector: ( 0.-[ k,
P 2 6- @
W. P. Ang i
Date Signed Approved by:
7 '30 -8e
-
A. E. Herdt, Section Chief, RCES Branch Date Signed SUMMARY Inspection on July 16-18, 1980 Areas Inspected This routine unannounced inspection involved 17 inspector-hours onsite in the areas of pipe support baseplate designs using concrete expansion anchor bolts (IEB 79-02); seismic analysis for as-built safety-related piping systems (IEB 79-14).
Results Of the 2 areas inspected, no items of noncompliance or deviations were identified.
.
M 8009110/@
-
.-
.
.
.
..
..
.
.
DETAILS 1.
Persons Contacted
.
Licensee Employees
- D. A. Nauman, QA Group Manager
- 0. W. Dixon, Production Engineering Group Manager J. Algar, Site Construction Manager
- J. M. Wood, Quality Control Manager
- A. A. Smith, Site QA Coordinator
- H. Radin, Engineer
- A. G. Alvares, Engineer Other licensee employees contacted included 4 construction craftsmen, 4 tech-nicians, 2 security force members, and 3 office personnel.
Other Organizations
-
.
Gilbert Associates, Inc.
(GAI)
- H. Bamberger, Resident Engineer
- Attended exit interview 2.
Exit Interview The inspection scope and findings were summarized on July 18, 1980 with those persons indicated in Paragraph-1 above. IEB 79-02 and IEB 79-14 work were discussed with the licensee.
3.
Licensee Action on Previous Inspection Findings Not inspected.
4.
Unresolved Items Unresolved items were not J.dentified during this inspection.
,
5.
Pipe Support Baseplate Designs Using Concrete Expansion Anchor Bolts (IEB
'
79-02)
On July 5, 1979, August 17, 1979 and January 7, 1980 the licensee provided responses to IEB 79-02.
On February 21, 1980 the licensee reported that deficiencies were identified in 97 out of 100 pipe supports installed. An inspection was performed to verify licensee compliance with IEB 79-02 requirements and licensee commitments.
I L
.
-2-g As a result of the deficiencies noted by the licensee.on pipe supports, the licensee's QC organization took over the pipe support QC functions from Daniel Construction Company. The following procedures were either modified or issued to provide for a pipe support re-inspection program.
South Carolina Electric and Gas (SCEG) FQCP 6.3.1, Rev. TA-1 - Inspection of Fabrication and Installation of Pipe Hangers and Supports SCEG Procedure MF-9 Rev. 4 - Inspection of Fabrication and Installation Of Safety-Related Pipe Hangers and Supports.
The above noted procedures also contained requirements for inspection of concrete expansion anchors.
The following pipe supports were inspected for compliance with IEB 79-02 requirements and licensee commitments:
Main Steam System MSH-289
.
MSH-290 MSH-291 MSH-292 MSH-294 No items of noncompliance or deviation were identified.
6.
Seismic Adalysis for As-Built Safety-Related Piping Systems (IEB 79-14)
On October 30, 1979, the licensee provided a response to IEB 79-14.
An inspection was conducted to verify licensee compliance with IEB 79-14 requirements and licensee commitments.
The pipe support reinspection procedures noted in paragraph 5 above provides for the reinspection of all safety related pipe supports. Approximately 30% of the pipe supports had already been reinspected. An as-built inspec-tion of piping was just starting. It was noted that the licensee was using existing general procedures for the piping as-built inspection. However, to assure that data that is important for the seismic analysis is obtained and provided to GAI, the licensee indicated that either a new procedure will be generated or existing procedures changed to detail the inspection requirements. Pending issuance of the procedure or change to the existing procedures this item was identified as inspector follow-up item 80-19-01
"As-Built Piping Inspection Procedure".
'
Inspection of the following pipe supports was in progress and was observed:
Component Cooling - CCH 1103 Reactor Cooling
- RCH 222 Chemical and Volume Control - CSH - 940
.
. - -.
e s -
-3-
- As-Built inspection of a portion of the spent fuel pool piping shown on Southwest Fabricating drawing SF06 Rev. 6A was in progress and was observed.
,
~ The pipe supports listed in paragraph 5 were also inspected for compliance
. with IEB 79-14 requirements and licensee commitments.
No items of noncompliance or deviations were identified.
.
.
f
,
i
.
%
-4
--
,- -
. _ - _,...,..
.. _.,. = - -
--
,..
-_,
,
-~. -,,..
---y