IR 05000395/1978027
| ML19274D727 | |
| Person / Time | |
|---|---|
| Site: | Summer |
| Issue date: | 12/14/1978 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Mary Johnson SOUTH CAROLINA ELECTRIC & GAS CO. |
| Shared Package | |
| ML19274D723 | List: |
| References | |
| NUDOCS 7902220236 | |
| Download: ML19274D727 (2) | |
Text
'
s
.-
-
-
/ g *R80u9'o,,
UNITED STATES NUCLEAR REGULATORY COMMISSION
[
o itEGioN 11
- , E 101 M ARIETTA STR E ET, N.W.
ATLANTA, GEORGI A 30303
%******
DEC 14197b Corrected Copy issued January 31, 1979, due to clerical error.
In Reply Refer To:
RII:TEB 50-395/78-27 South Carolina Electric and Gas Company Atta: Mr. H. C. Johnson, Vice President and Group Executive-Special Services and Purchasing P. O. Box 764 Columbia, South Carolina 29218 Gentlemen:
This refers to the inspection conducted by Mr. T. E. Burdette of this office on November 27-30, 1978, of activities authorized by NRC Construction Permit No. CPPR-94 for the Virgil C. Summer facility, and to the discussion of our findings held with Mr. D. A. Nauman at the conclusion of the inspec-tion.
Areas examined during the inspection and our findings are discussed in the enclosed inspection report. Within these areas, the inspection consisted of selective examinations of procedures and representative records, inter-views with personnel, and observations by the inspectors.
Five new unresolved items resulted from this inspection and are discussed in the enclosed report. These items will be examined during subsequent inspections.
During the inspection, it was found that certain activities under your license appear to be in noncompliance with NRC requirements. This item and
,
references to pertinent requirements are listed in the Notice of Violation enclosed herewith as Appendix A.
This notice is sent to you pursuant to the provisions of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.
Section 2.201 requires you to submit to this office, within 20 days of your receipt of this notice, a written statement or explanation in reply including:
(1) corrective steps which have been taken by you and the results achieved; (2) corrective steps
- which will be taken to avoid further noncompliance; and (3) the date when full compliance will be achieved.
NO222073 G
.
.-
der. 4 lyic
.
South Carolina Electric and Gas Co.
-2-In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room.
If this report contains any information that you (or your contractor) believe to be proprietary, it is necessary that you make a written application within 20 days to this office to withhold such information from public disclosure.
Any such application must include a full statement of the reasons on the basis of which it is claimed that the information is proprie-tary, and should be prepared so that propriet'ary information identified in the application is contained in a separate part of the document. If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss them with you.
Sincerely,
f C. E. Murphy, C f
Reactor Construction and Engineering Support Branch Enclosures:
1.
Appendix A, Notice of Violation 2.
Inspection Report No. 50-395/78-27 cc w/ enc 1:
Mr. H. I. Donnelly, Jr.
Quality Assurance P. O. Box 8 Jenkinsville, South Carolina 29065
Mr. T. B. Conners, Jr.
Conners, Moore and Corber 1747 Pennsylvania Avenue, N.W.
Washington, D.C.
20006 Mr. L. D. Shealy, Manager Nuclear Operations
. P. O. Box 8 Jenkinsville, South Carolina 29065
.
-