IE Inspec Repts 50-395/78-25 & 50-395/78-26 on 781031-1102 During Which No Items of Noncompliance Were Noted.Major Areas Inspected Incl:Welder Qual Prog,Pumps,Elec,Mech & Snubber Installation,Qa Procedures & Records
ML20148A331
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 11/21/1978
From: Crowley B, Economos N, Vallish E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20148A305 List:
References
50-395-78-25, 50-395-78-26, NUDOCS 7812280315
Download: ML20148A331 (13)


Text

- - - _ _ _ _ _ _ _ _ _

.

.

NUCLLAH HtbuLA B UF 1 ovmmiaaevis

/

'o,,

nscioN u f

,

g toi u AnittT A s1 RE ET, N w.

,

?*

e ATL ANT A, CE oRGI A 3o3o3 g

%.,...../

Report No.: 50-395/78-26 Docket No..

50-395

.

License No.. CPPR-94 Category: A3 Licensee: South Carolina Electric and Gas Company Post Of fice Box 764 Columbia, South Carolina 29202 Facility Name:

V. C. Summer Nuclear Station, Unit 1 Inspection at: Fairfield County, South Carolina Inspection conducted: October 31 - November 2,1978 Inspectors:

E. J. Vallish N. Economos B. Crowley J. Lenaban

,

y,

". 2%

7E Reviewed by Na u'

m bate

.

J. C. Bryant, [hief Engineering Support Section No.1 Reactor Construction and Engineering Support Branch lospection Swnmary 50-395/78-26)

Inspection on October 31 - November 2, 1978 (Report No.

Areas Inspected: Welder training and qualification program, safety-related installation of the service water, containment spray, RHR and high pressure safety injection pumps; progress of installatic x of electrical penetrations,

afety-related pipe dynamic major safety-related mechanical components ani snubbers; QA procedures, work and quality reco: ds for containment prestress-ing; service water pumphouse settlement records stid work on the serv 2ce water The inspection involved 72 inspect:rehours on-site by four NRC pond dams.

inspectors.

Results: No items of noncompliance or deviations were identified.

781228 0316 o

_ _ _ _ - _ _ - _ - -

_ - _ _ _ _ _ _ _ _ _ _ _

___

.

.

RII Report No. 50-395/78-26 I-?

[-? d, O'h ' Y Y'

L DETAILS I Prepared by: E.M. Vallish, Mechanical Engineer Date Engineer;ng Support Section No.1 Reactor Construction and Engineering Support Branch Dates of Inspection: October 31 - November 2, 1976 (n

.

2i 7f Reviewed by tm J. C. Bryant, Chie f f> ate Engineering Support Sectio,n No.1 Reactor Construction and Engineering

.

Support Branch 1.

Persons Contacted South Carolina Electric and Gas Company (SCE&C)

a.

  • J. F. Alger, Site Manager
  • D. A. Nauman, Quality Assurance Manager
  • H.1. Donnelly, Jr., Site QA Coordinator J. E. Bocock, QA Mechanical Supervisor S. E. Cash, Senior QA Surveillance Specialist b.

Contractor Organizations Daniel Construction Company (DCC)

  • V. L. West, Project Quality Assurance Manager K. E. Featon, Piping / Welding QC Engineer J. Frick, Mechanical QC Supervisor
  • Denotes present at the exit interview.

2.

Licensee Actions on Previous Inspection Findings inspection ihndings were nct reviewed Licensee actions on previous during this inspection.

-

Unresolvec Items No unresolved items were identified during this inspection.

4.

Independent Inspection Effort This effort included the progress of installation of the safety-related mechanical components in the reactor and auxiliary buildings, including

. _ - _ _ ___- _ ___ - -

-

_

..

- - - _ _ - _ _ _ _ _ _

.

.

RII Report No. 50-395/78-26 I-3 the reactor vessel, steam generators, pressurizer and in-core instru-mentation system; general construction activities and the' progress of installation of the safety-related pipe support and restraint systems.

No items of noncompliance vere identified.

  • Containment (Penet rations) Work Observation

.

One electrical penetration was observed to be velded into the contain-l ment shell.

The licenser's representative stated that electrical penetrations were first starting to be installed and that none were

'

very f ar along toward complete installation.

'

No items of noncompliance were ident2 fied.

6.

Follow-up on Regional Requests This ef fort was to include a review of the QA records for final setting of the Service Water Pumps, and to review the detailed installation removal requirements of the containment spray pumps, the residual beat (RHR) pumps, and the high pressure safety injection pumps and to confirm their proper installation by review of the QA records.

The following documents were reviewed to determine the licensee's connitments and QA/QC requirements for the installation of these pumps:

SCE&G Field QC Procedure 6.2.1, " Inspection of Alignment of Rotating Equipment" SCE&G Field QC Procedure 6.2.2, " Installation of Rotating Equip-sent" DCC Construction Procedure AP-Vill-03 RS, " Cleaning, Handling and Preservation", and Exhibit A, " Plant Equipment Maintenance Log" a.

Service Water Pumps

.

revie\\ed and used to verify The following gal drawings were locations, orientation details and installation requirements for these pumps :

E-026-102 R13. " Service Water Screen and Pump House Plans and Sections" E-426-702, "Se rvi ce Water Intake Screen and Pump House Plan - Floor Ele 425'-0" - Concrete Outline"

_ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _

- ^ - ~ ' - - - - '

.

O Rll Report No. 50-395/78-26 I-4 E-426-703, " Service Water Intake Screen and Pump House Plan - Floor Ele. 436'-0" "

The SCE&G audits of Goulds Pumps were reviewed in File 301.1.7,

" Surveillance and Audits". These were the pre-award of contract QA audits of the vendor on December 10 and 11,1974, and February 12 and 13, 1975, and a pre-shipping of pumps audit inspection of June 29 and 30, 1977.

All findings were dispositioned in a timely, adequate manner.

The installation of the three service water pumps was inspected in the service water pump bouse. These pumps are identified as

,XPP-39A, B and C - SW.

Some discharge piping is connected to the pump bowls, but the discharge header is disassembled and awaiting the backfilling of the lines outside the pump bouse structure.

The pump r. tors are not mounted on the pumps and final alignment and grouting of the pumps is yet to be accomplished. Nonconforming Condition Notice (NCN) 0527 dated October 24, 1978, concerning the three pumps' discharge flange connections was reviewed.

Actions are being taken to resolve this open NCN.

No items of noncompliance were identified.

b.

Containment Spray and RHR Pumps

.

The following documents were reviewed and used to verify the location, orientation details, and detailed installation require-l

/

ments for these pumps.

gal drawing E-412-070 P4, " Auxiliary Building - Third Basement Floor El. 370'-0" - Section" Ingersol-Rand drawing C-8X20VDFB6X11-E, " General Arrangement" gal drawing E-412-061, "3rd Batement Floor Elevation 374'-0" -

Southeast - Concrete Outline"

.

Installation of these pumps has one coritainment spray and one RHR l

pump in a room; the other one of each pump is in an adjacent l

room.

Inspection was made of the installation of RER pumps XPP 31B RH and XPP 31A RH. Both pumps are mounted and grouted with suction and discharge lines attached. The drive motors are not installed.

The licensee stated that preliminary aligenent is completed, but final alignment and setting will follow the disposition of out-standing NCN's 423M, 476M and 472M. These WCN'c were reviewed and action by the licensee is adequate and timely.

_ _ _ - _

_

- - - _ _ _ _ _ _ _ _ - _ _ _

RII Report No. 50-395/78-26 I-5 The installation of the containment spray pumps XPP 38A SP and XPP 38B SP was inspected.

These pumps and their speed reducers and motors have had preliminary alignment settings, but are not coupled together. The licensee stated that final alignment and setting will be done after disposition of outstanding NCN's 554M, 476M, 552M, 554M and DN's 1710M and 1375M. The NCN'. and DN's were reviewed and f ound to be current with adequate and timely disposition actions.

File 307 SP XPP 38A was reviewed and contained " Check Form for Mechanical Vessels", dated May 27, 1978, which verified center-

. lines and elevations of the pump installation, and the FQC Form 6.2.2-1,

" Inspection of Installation of Equipment", dated

' September 11, 1978, certifying status of installation and referencing applicable NCN's and DN's.

File 307 SP XPP 3oB was reviewed and contained comparable data for that pump installation.

,

No items of noncompliance were identified.

'

High Pressure Safety Injection Pumps c.

The following gal drawings were reviewed and used to verify locations, orientation details and installation requirements of

,

the safety injection pumps XPP 0043A, B and C.

E-412-101, " Auxiliary Building - 2nd Basement Floor - Eleva-tion 388'-0" - North Concrete Outline" E-412-109, " Auxiliary Buildinc - 2nd Basement Floor - Eleva-tion 388'-0" - Sections" The installation of the three pumps was inspected.

The units were grouted-in, pipe installation was incomplete and the couplings between the motor and the speed reducer and between the speed reducer and the pump were not installed. DN 1268M relating to a flanged joint fit-up on the "C" pump is outstanding and is being dispositioned.

File 307 CS XPP0043A, " Charging /Saf ety inspe'etion Pump A", was reviewed and included the " Inspection of Installation of Tanks, Vessels, Heat Exchanges", FQC Form 6.2.2-1, dated May 10, 1977, which certified the pump's proper location, both centerlines and elevation.

File 307 CS XPP0043B contained similar documentation for the B pump.

File 307 CS XPP0043C indicated preliminary settings on " Check Form for Mechanical Vessels".

The licensee's representative stated final setting certification is pending the resolution of DN 1268M.

I No itees of noncompliance were identified.

l

--- _ _ -

--

- - _ - _ _ - -

_.

.

.

R11 Report No. 50-395/78-26 I-6

-

7.

Exit Int e rview A meeting was held with the licensee's representatives identified zu paragraph 1 and others to discuss the results of this inspection.

Items discussed included the service water pumps, containment spray pumps, RHR and safety injection pumps, and also the progress of instal-lation of electrical penetrations and safety-related mechanical com-The licensee was ponents and safety-related pipe dynamic snubbers.

informed that no items of noncompliance or new unresolved items were identified. The licensee's representative acknowledged these findings.

.

l

.

e

- - - - - - - - - - - - - - - -, _ _ _ _, _ _ _ _ _ _ _, _ _ _ _ _

.

.

- _ _ _ _ _ _.

W RII Rpt. No. 50-395/78-26 11-1

"/u//4 DETAILS II Prepared by:

)

1./J /Lenahan, Civil Engineer Date Engineering Support Section No. 1 Reactor Construction and Engineering Branch Dates of Insper*'

'nber 31 - November 2, 1978 Reviewed by: /]49,_

W jikj!)f Date V t.9 fyanu Chief 6rfigineering Support Section No. 1 Reactor Construction and Engineering

.

Support Branch 1.

Persons Contacted South Carolina Electric and Gas Company (SCE&G)

a.

  • J. F. Algar, Site Manager
  • H. I. Donnelly, Site QA Coordinator
  • A. A. Smith, Civil QA Supervisor J. Counts, QC Receiving Supervisor b.

INRYCO, Inc.

F. Rubio, QC Manager J. Brown, Lead QC Inspector W. Murray, Project Manager Gilbert Associates, Inc. (GA1)

c.

G. T. DeMoss, Resident Engineer

  • Denotes those present at the Exit Interview.

2.

Licensee Actions on Previous Inspection Findings This area was not inspected.

'.

3.

Unresolved items No new unresolved items were identified during this inspectio _ _ _ _ - _ _ _ _ _ _.

.

.

RII Rpt. No. 50-395/78-26 II-2 4.

Independent Inspection Effort Theinspectorexaminedtheoverallstatusofconstruction2servicewater settlement records, piezometer data obtained from piezometers pumpbouse installed in the North Dam of the service water pond and in the fill around the service water pumphouse, and condition of the slope protection (rip rap) which has been placed on the service water pond dam slopes and adjacent shore sections.

No deviations or items of noncompliance were identified in the areas examined.

5.

Containment (Prestressing) - Review of Quality Assurance Implementing Procedures The following procedures and specifications were examined to determine if saterials, work activities, quality control and quality assurance functions were provided for as stipulated in NRC requirements, and FSAR Sections 3.8 and 17:

Specification SP-207, " Fabrication and Installation of Reactor Building Post Tensioning Systems" SCE&G CR-1, " Instruction for Receipt and Storage Inspection of Tendon Conduit, Couplings, Embedded Anchorages, Tendons, and/or Other Related Post-Tensioning System Items" INRYC0 Field Installation Manual, Procedure: F2.0 through F7.2 No items of noncompliance or deviations were identified.

6.

Containment (Prestressing) - Observation of Work and Work Activities inspector examined the storage conditions of tendons, shims, grease The cans, field anchors, protective grease and other related post-tensioning Storage requirements are specified in SCE60,CR-1 and system components.

the INRYC0 Field Installation Manual.

INRYC0 has completed installation of 115 ve'rtical tendons and 93 done tendons, and has completed installation of field anchors and button-beading on 113 vertical tendons.

Buttonbeading and field anchor installation was in progress on the dome tendons.

IFRYC0 was in tbc process of cleaning and gressing the horizontal conduits in preparation

- - _ - _ - - _ - _ _ _ _ _ _ _ _ _ - _ _ - _ _ _ _

--.

_

_ _ _ _ - _ - _ _ _ _

,

.

RII Rpt. No. 50-395/78-26 11-3 for tendon installation.

Acceptance criteria for post-tensioning acti-vities are SP-207, the INYRCO Field Installation Manual, and IhTRCO Drawing Numbers 675-1 through 675-20.

No items of noncompliance or deviations were identified.

7.

Containment (Prestressing) - Review of Quality Records The inspector examined quality records for fabrication of the following tendons: numbers CB33, BA33, AC33, CB37, BA37, AC37, CB41, BA41, AC41, CB45, BA45, AC45, CB49, BA49, AC49 and CB48.

Acceptance criteria controlling tendon f abrication are those listed in paragraph 6.

No deviations or items of noncompliance were identified.

8.

Exit Interview The inspector met with the licensee representatives denoted in para-graph I at the conclusion of the inspection. The licensee was apprised of the scope of the inspection which included procedures, work performance and quality records for containment prestressing, reviow of service water pumphouse settlement records, and work performance on the service water pond dams.

No deviations or items of noncompliance were identified.

-

.

a

_ _ _ - - _ _ _ _ _ _ _ _ _ _ _

- - -- - -

________

,

.

.

RII Report No. 50-395/78-26 III-1 g %<% M N J</h DETAILS III Prepared by.

.

Da te /

N. Economos, tre,faJ 1urgical Engineer.

Engineering Support Section Reactor Construction and Engineering Support Branch

//ff'l V

C'Yh

'aW

<-

c B. R. Crowley, Metallurgical Engineer Dbte

"

Engineering Support Section No. 2 Reactor Construction and Engineering Support Branch Dates of Inspection: October 31 - November 2,1978 Reviewed

.

M W

// J' '{ ff Date'

T. E. Conlon, Chief Engineering Support Section No. 2 Reactor Construction and Engineering Support Branch

,

1.

Persons Contacted South Carolina Electric and Gas Company (SCE&G)

a.

  • J. S. Algar, Nuclear Site Manager
  • M. Eddins, General Superintendent - Welding
  • H. Donnelly, Eite QA Coordinator
  • D. Moore, Senior QA Engineer D. A. Nauman, Manager, QA
  • T. A. McAllist er, QA Surveillance Specialist b.

Contractor Organization Daniel Construction Company (DCC)

-

  • W. L. West, Project QA Manager
  • G. R. Curtis, Mechanical QA Supervisor

.

  • J. Har' ey, Construction Manager

,

J. J. Grabusky, Welding Manager D. Welker, Project Welding Engineer G. C. Garret, Jr., Project Training (Welding) Coordinator V. Cash, Project Welding Superintendent Q. Meares, Jr., Weld Test Shop Supervisor L. Sexton, QC Inspector - Welding

_ _ _ _ - _ _ _ _ _ _ - _ _

- _ - _ _ _ _ _ _

.

.

RII Report No. 50-395/78-26 III-2 In addition to the above, other craf t and inspection personnel were interviewed.

  • Denotes those present at the exit int e rview.

.

2.

Licensee Action on Previously Identified Inspection Findings Previously identified inspection findings were not reviewed during this inspection.

3.

Unresolved Items There were no unresolved items identified as a result of this inspection.

4.

Independent Inspection Effort Welder Qualification and Training Program a.

The QA/QC procedures used to indoctrinate, qualify, and train newly hired and other project personnel within the welding disci-pline are as follows:

-

" Orientation, Introduction, and Training of AP-II-05 R6

-

Personnel

" Qualification of Welding Procedures and Welders" QCP-II-01 R6

-

.

" Qualification of Welding Procedures and Welders" WE-II-01

-

In addition DCC has written specific instructions to be used in the welder upgrading program, i.e. upgrading from carbon steel plate welding to X-Ray Pipe Welding.

DCC stated that although the program for training and upgrading welders bas been in existence f-some time, it had never been documented until now.

Basically personnel with previous welding experience may take the standard performance quslification test as prescribed in Section IX, 1974 Edition of the ASMI Code.

Those with no experience are given the opportunity to practice until supervision is satisfied that the required level of expertise for qualification has been attained; DCC stated tbat this usually takes between six to eight weeks.

Those candidates without experi,ence receive oral and practical welder training at the training facilities located outside the gate where no testing is performed.

All perf ormance qualification tests are conducted inside the gate at the test shop.

Qualified project welders who demonstrate good ability and

_ _ _ -

.

.

.

.

_ _ _ _ _ _ _ _ _ _.

,

.

-

.

RII Report No. 50-395/78-26 III-3 wish to upgrade from their present level, e.g., plate welding to carbon steel pipe velding or to stainless pipe welding, X-Ray quality, are given the opportunity to practice prior'to taking the required test.

In order to upgrade for X-Ray pipe welding, a qualified welder must weld 3 acceptable thin wall sockups conse-cutively and 2 acceptable heavy wall mockups consecutively for each material to be upgraded.

In addition,. welders who have upgraded to, but have not worked on X-Ray quality welds for a period of two weeks or more, are required to practice on a mock-up in the test shop prior to welding in the field.

This program has been in existence, although not documented, for approximately one Fresently there are about 33 to 35 welders qualified and year.

upgraded to do X-Ray welding.

The inspectors reviewed the personnel and performance qualifica-tion records of approximately 20 X-Ray qualified welders; observed welders practicing and upgrading in the test shop; audited the welder training presentation designed to familiarize new personnel with weld material control, QA practices, wel test shop rules and regulations, shop safety and welder testing procedures; and reviewed welder performance (rejection rate) records.

b.

Observation of Field Welding Activities Fabrication, inspection and testing of field welds, within the reactor coolant pressure boundary and safety related systems, is controlled by Section III,1971 Edition through the summer 1973 addenda of the ASME Cote.

In process and completed welds, selected at random, were inspected to verify compliance with code and procedural requirements.

The welds selected were as follows:

Weld No.

Size ISO Comments FW-18 32", C.S.

MS-08 Welding Fill Passes TV-15C)

14", S.S.

SI-04 Root Closure in Progress FW-21 14", S.S.

CS-04 Final Pass Completed FW-1 3.5", S.S.

CS-89

.

Final Pass in Progress FW-6C)

6.625", S.S.

SE-SI-20, Fitup in Progress FW-1 10.75", C.S.

DE-3A-319-P Root Closure in Progress FW-4 6.625", S.S.

SI-19 Final Fill Passes in Progre:

'

FW-10 3",

S.S SP-03 Completed FW-3 6.625", S.S.

SI-20 Root and Hot Pass Completed FW-9 10.75", S.S.

SP-16 Completed FW-19 10", S.S.

SP-16 Completed These welds were intpected for proper fitup, bead contour and appearance, are strikes, cleanliness, purge as applicable, identi-fication, location and position.

Related QA/QC records including

_,

.

.

- _ _ _ _ - _

.

.

RII Report No. 50-395/78-26 III-4 welder qualification cards, weld data cards, weld metal slips and isometric drawings were reviewed for completeness and accuracy.

In addition, selected radiographs were reviewed for weld quality and obvicus radiographic quality problems. These were:

Weld No.

150 Size W-7C1 SP-04 3" X.438" W-1C1R2 SP-17 3" X.438" W-15 SI-09 3" X.438" W-5C1 SI-09 3" X.968 W-10 SI-34 12" X 1.125" W-12 SI-34 12" X 1.125" W-7R1 RC-06 4. 5" X. 5 31"

,' W-3R 1 SI-22 6" X.719" W-5 SI-22 6" X. 719"

  • FW-4R2 SW-24 16" X. 375"
  • Repair of this joint not complete at time of inspection.

c.

Plant Tour areas of the plant to The inspectors walked through various obs e rve certain pipe bandling installation and other welding activities in progress.

Housekeeping and availablity of fire protection equipment were noted. Working areas were inspected for uncontrolled welding electrodes.

l Within the areas inspected no items of noncompliance or deviations I

were identified.

5.

Exit Inte rview The inspectors met with licensee representatives denoted in paragraph I at the conclusion of the inspection and summarized the scope and findings of the inspection. The inspection included observation of field pipe welding activities and examination of welder qualification and training program. The licensee bad no questions or comments.

--

- - - _ _ _ _ _ _ _ - _ _ _ _ _