UNITED STATES
'
Kicoq f
/
jg NUCLEAR REGULATORY COMMISSION
[ %c([ g REGloN il
.
"-
.g 101 M ARIETTA STR E ET, N.W.
ATLANTA, GEORGIA 30303
.....
'
,
Report Nos.: 50-395/78-19
,
Docket Nos.: 50-395
. ;)
License Nos.:
CPPR-94
. J.
,
',,
Licensee:
South Carolina Electric and Gas Company
,
P. 0. Box 764 s
'"
Columbia, SC 29218
'
..
Facility Name: Virgil C. Summer j
Q-Inspection at: Virgil C. Summer Site, Jenkinsville, S.C.
Inspection conducted: September 6-7, 1978 Inspectors:
F. Jape J. L.
Ids r
[lh Approved by-
_.1.ewis, Chief, Mattor Projects Section
/ Date R
o. 2, Reactor Operations and Nuclear
Support Branch
.
Inspection Sunnary Inspection on September 6-7, 1978 (Report No. 50-395/78-19)
n Areas Inspected:
Routine, unannounced inspection of plant operations and U
preparation for receipt of fuel. The inspection involved 16 inspector-hours onsite by two NRC inspectors.
Results1 Of the two areas inspected, no items.of noncompliance were identified.
vence el6 h q
a
.; y
,cc~.,
n.7
.,m-.m, r.
7, 7,7 s.q.,
,
,_,.y..,,..
y.,,
...,
..,..,
,;.,. 7,,,, m.
,
,.,,,,,,
,
, '. -
>-
s
,
~
~
,
,
i
.
<
, ';
I g
_
,
-
-
t
.d-t t
RII Rpt. No. 50-395/78-19 I-1 DETAILS I Prepared by:-
w<
8 J. L. Skolds, Reactor Inspector i Da~te
.
Reactor Projects Section No. 2 Reactor Operations and
'
q Nuclear Supp rt Branch h
i[.1h d
Ah
-
//
/
Date
'
'
F. 'dape
Reactor Projects Seftion No. 2
'
,
- 'i Reactor Operations and
'
Nuclear Support Branch Dates of Inspect'
September 6-7, 1978
- A
9/l</'r O
nevie ea 6 :
./ C.' Lewis, Chief,Aeactor Projects
/ D6te
!
Section No. 2 Reactor Operations and Nuclear Support Branch 1.
Persons Contacted South Carolina Electric and Gas Company
- H. T. Babb, General Manager Nuclear Operations and System Planning M. B. Whitaker, Jr. Licensing Engineer
- L. D. Shealy, Plant Manager A. B. Harrison, Operations Supervisor
'
0. S. Bradham, Maintenance Supervisor
- J. G. Connelly, Start Up Supervisor
{-
D. Boward, B0P Lead Test Supervisor M. Kapousouz, Mechanical Systems Test Supervisor
.
H. Donnely, Site QA Coordinator
- S. Smith, QA Supervisor - Civil & Operations
- Denotes those attending the exit interview.
2.
Licensee Action on Previous Inspection Findings There are no previous inspection finding requiring licensee action.
a
!
3.
New tinres:1ved Iteas
!
,
q
.
.,.
._,.
___
_.._
r._,__<
<
c
,
-._,.;
,
m.
-r
. - - - - - - -
,
s
o
,a
.
.
.
q
- s
-
,;
RII Rpt. No. 50-395/78-19 I-2
-
j
-
.
None identified during this inspection 4.
Exit Interview
- <-
The inspectors met with Mr. Babb and other licensee representatives listed in paragraph I at the conclusion of the inspection on c
September 7, 1978.
The inspectors summarized the scope of the inspection and informed the licensee that J. L. Skolds had assumed the
,
project inspector responsibilities.
'
'
5.
Preparation For Receipt Of Fuel The inspectors reviewed a copy of the Application for Special Nuclear
,
Material License and made a general tour of the Fuel Handling Building.
i The final work to prepare the Fuel Handling Building for the receipt of new fuel was being performed. Housekeeping within the storage area was j
-
j found acceptable.
Within the areas inspected, no items of noncompliance or deviations were identified.
6.
General Plant Tour The inspectors toured various areas of the entire site and observed general plant conditions. Welding operations on the reactor coolant piping was observed as well as various construction activities. Within the areas inspected, no items of noncompliance or deviations were disclosed.