IE Inspec Rept 50-395/78-21 on 780927-28 During Which No Items of Noncompliance Were Noted.Major Areas Inspected Incl:New Fuel Receipt & Fuel Handling
ML20062E094
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 10/18/1978
From: Robert Lewis, Skolds J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20062E091 List:
References
50-395-78-21, NUDOCS 7812040181
Download: ML20062E094 (3)


Text

(

"

4,

.

..,

  • .

I UNITED sT ATEs

.

gd E8 Coq'o NUCLEAR REGULATORY COMMISSION

,,

[

REGION 11

.,.. (

g 101 M ARIETT A sTRE ET. N.W.

  • r

'

.,

[

ATI. ANT A. GE oRGI A 3o303

,

%,.'.... /

,,

,,.,

- ;'

Report No.:

50-395/78-21

-

Docket No.:

50-395 f,

License No.: CPPR-94

<e

.

South Carolina Electric and Gas Company

.;

Licensee:

P. O. Box 764 Columbia, S. C. 29218

!

Facility Name: Virgil C. Summer

1j Inspection at:

Virgil C. Summer Site, Jenkinsville, S. C.

Inspection conducted:

September 27-28, 1978 Inspector:

J. L. Skolds Approved by: [. 6-

/s////[

Date R. C. Lewis, Chief Reactor Projects Section No. 2 Reactor Operations and Nuclear Support Branch Inspection Summary Inspection on September 27-28, 1978 (Report No. 50-395/78-21)

Areas Inspected:

Routine unannounced inspection of plant operations, new fuel receipt and fuel handling. The inspection involved 11 inspector-hours Q

on site by one NRC inspector.

i l

Results:

Of the two areas inspected, no items of noncompliance were identified.

-

l l

,

t

'

i i

}j 781204ot%i

'

. !,-, :..

.

.y.,,..,,

.,,

,

,

,

,. _.

,,

.

'a t

+

.c

.

.

t Q

  • s

.

k

.

.

j

-

.

..i

4
.y.

RII Rpt. No. 50-395/78-21 1-1

,

a

.

,~

N

, ',

' -}

DETAILS I Prepared by:

'e-. \\i a.l u ~~.

6,-

i t ',

.t

.:

.

, ' f)J J. L. Skolds, Reactor Inspector Date-i Reactor Projects Section No. 2

'

<

Reactor Operations and Nuclear

.

Support Branch i, c

,

y Dates of Inspection:

September 27-28, 1978

-

E 4 /M

/#/#F/

Reviewed by:

R. C. Lewi(, Chief Date Reactor Projects Section No. 2-s i

Reactor Operations and Nuclear

]

([)

Support Branch

1.

Persons Contacted South Carolina Electric and Gas

'

  • L. D. Shealy - Plant Manager A. B. Harrison - Operations Supervisor J. G. Connelly - Start Up Supervisor H. I. Donnelly, Jr. - Site QA Coordinator
  • S. Smith - QA Supervisor - Civil and Operations
  • R. M. Campbell - QC Engineer Various operations personnel
  • Denotes those present at exit interview.

()

I

!

l 2.

Licensee Action on Previous Inspection Findings l

There are no previous inspection findings requiring licensee action.

!

l 3.

New Unresolved Items

}

None identified during the inspection.

4.

Exit Interview The inspector set with Mr. Shealy and ot'uer licensee representatives listed in paragraph 1 at the conclusion of the inspection on

.

'I September 28, 1978. The inspector summarized the scope and findings of l

the inspection.

':

,

a-*r-+-e--c.n, q y ; w ;

,

_

ys.,. _y ;...

,

,.

_,

,.,

.,, _,,,,,,,,.

,

__

,,

'

_'

e.

,

,,

,

--

-~w n

.j

-,,u

.

j

~

e..

.;

f

-

,i

.

'd RII Rpt. No. 50-395/78-21 1-2 t

,

5.

Fuel Receipt and Storage

,

.

The inspector observed fuel handling operations in the Fuel Handling

Building. Fuel handling operations were observed to insure compliance with the Special Nuclear Material (SNM) license issued under 10 CFR

,

Part 70. Specifically, the following areas were observed:

1

.

I Special Nuclear Material specific storage requirements

-

,_.

,

Integrity of security controls

'

-

Control of the environment in the fuel storage area

-

O New fuel receipt inspection documentation and records were reviewed to insure compliance with the licensee documentation requirements.

Radiological controls were observed during the receipt inspection and during the fuel handling operation.

Licensee inspection of the shipping containers was also observed. Within the areas inspected no items of noncompliance or deviation were disclosed.

6.

General Plart Tour The inspector toured various areas of the entire site and observed general plant conditions.

Welding operations on reactor coolant

,

a piping was observed as well as various other construction activities.

Within the areas inspected, no items of noncompliance or deviations l

were disclosed.