c [810 UNITED STATES s
9k NUCLEAR REGULATORY COMMISSION
]
.,(
,
,
CE l!N 11
.j
't
, e.
g 101 M ARIETT A sT REET, N.W.
- r i
"o,
[
ATLANTA, GEORGIA 30303 s.,*...*/
Report No.:
50-395/78-20
Docket No.:
50-395 (
License No.:
CPPR-94
Category: A3/B1
,
s Licensee:
South Carolina Electric and Gas Company
'
P. O. Box 764 Columbia, South Carolina 29202 Facility Name:
Virgil C. Susmer Nuclear Station, Unit No. 1
'
Inspection at: Fairfield County, South Carolina Inspection Conducted: September 21-22, 1978
.
Inspectors:
T. E. Burdette B. J.
o hr n
/T M
M Reviewed by:
A. R. lierdt, Chief
~Dat'e Projects Section Reactor Construction and Engineering Support Branch Inspection Summary
,
1=arectio=== Se,te.ber 22-22. 1978 cRe, ort No. so-39sf>8-203
Areas Inspected:
Licensee's action on previously identified inspection
~j items; independent inspection of construction activities; turnover of principal inspector responsibilities. The inspection involved fourteen (14)
inspector-hours at the construction site by two NRC inspectors.
Results: No items of noncompliance or deviations were identified.
t i
'
781122 0L8 f/
~i-i
~~m~..-.7
,...,. -,. _.,....,.. _,,,,
, _
,
,
--
..
..
v
..
.
,
l
,
.
-
-
q Sj RII Rpt. No. 50-395/78-20 I-1
x wbM
/hJh/
DETAILS I Prepared by:
'
T. E. Burdette, Principal Irspector Da te'
,
Projects Section l
[t Reactor Construction and Engineering y
Support B h
_ _ _
/O
$
-
_
y B. J.'Coch g, Principal Inspector '
/ Dater
,
z Projects SEction
-
Reactor Construction and Engineering Support Branch n.
Dates of Inspecti
Se tember 21-22, 1978
.C.
-
!7L
/
Reviewed by:
A. R. Herdt, Chief Date Projects Section
'
h Reactor Construction and Engineering
'
Support Branch
,
1.
Persons Contacted South Carolina Electric and Gas Company (SCE&G)
a.
- J. F. Algar, Site Manager
- H. I. Donnelly, Jr., Site QA Coordinator
- J. M. Woods, Manager, QC b.
Daniel Construction Company (DCC)
- R. D. Gunderson, Project Manager
- W. L. West, Project QA Manager
- C. E. Hackney, QA Engineer l
(]
- Denotes those present at the exit interview 2.
Licensee Action on Previous Inspection Findings L
,
(Closed) Inspector Followup Ites (395/78-13-01): Documentation Requirements for Weld Buttering - The licensee has reviewed this l
problem. The procedure for welding of material has been revised to i
require documentation for buttering of welds. This ites is closed.
.
j l
3.
Unresolved Items
There were no new unresolved items identified during this inspection.
i
.
..
l i
)
'WT 'ry
" "* 7 s" p n { mas =en.m s=p er we p,,-..y.p.
,
+
_.
-.
.
-
. -.. -.
- - -.. - -.
.
-.....
l z...
, d,
-
RII Rpt. No. 50-395/78-20 I-2
...
,
4.
Independent Inspection Effort 5%
The inspector conducted a walk-through inspection of the contain-a.
ment and auxiliary building to observe construction progress and
,
a-construction activities.
',
b.
The inspector reviewed personnel changes in the SCE&G site organi-In zation and DCC organization.
In the SCE&G organization, J.D. Woods has replaced K. W. Nettles as the QC Manager; J. Bocock has replaced
,
,
11. W. Eddins as the Mechanical QA Supervisor; A. Smith has replaced T. Burdick as Civil QA Supervisor.
In the DCC organization,
'
'
K. Heaton hn assumed the duties of Piping / Welding Engineer.
' '
No items of noncompliance or deviations were identified.
' C 5.
Status of IE Bulletins O
(Open) 78-BU-04 - Stem Mounted Limit Switch - Action on this item has not been completed.
This item remains open pending completion of licensee's actions and receipt of the licensee's final report.
6.
Status of IE Circulars The licensee has received, reviewed, evaluated and is taking necessary action on information contained in the following circulars:
78-CI-15; Tilting Disc Check Valves Fail to Close With Gravity in a.
Vertical Position.
b.
78-CI-16; Limitorque Valve Actuators.
7.
Principal Inspector Turnover The inspectors met with the SCE&G and Daniel Construction Corporation
,
l management and informed them that the principal inspector responsi-
!
.
bilities for the V. C. Summer Nuclear Station were being transferred to i
T. E. Burdette of Region II.
8.
Exit Interview The inspectors met with licensee representatives (denoted in paragraph 1) at the conclusion of the inspection on September 22, 1978.
The inspectors sumarized the purpose and scope of the inspection and the findings of the inspection. There were no unanswered questions or dissenting comments.