IR 05000335/1982007

From kanterella
Jump to navigation Jump to search
Forwards IE Safeguards Insp Rept 50-335/82-07 on 820216-19. No Noncompliance Noted.Rept Withheld (Ref 10CFR2.790)
ML20041E271
Person / Time
Site: Saint Lucie 
Issue date: 03/02/1982
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
References
NUDOCS 8203100312
Download: ML20041E271 (1)


Text

i.

s;dba

.

..

.

-

.

MAR 0 21982 m

c 0)

Florida Power and Light Company UC$ PED ATTN:

Dr. R. E. Uhrig, Vice President 4 0 9 79g b "11

-

-

Advanced Systems and Technology S#

l P. O. Box 529100 3*

'

'

Miami, FL 33152 y

p Gentlemen:

'c

,

Subject:

Report No. 50-335/82-07 This refers to the routine safeguards inspection conducted by Mr. B. Hall of this office on February 16-19, 1982, of activities authorized by NRC License Nos. DPR-67 and CPPR 144 at the St. Lucie facility and to the discussions of our findings held with Mr. C. M. Wethy, Plant Manager, at the conclusion of the inspection.

Areas examined during this inspection included your physical security prosram as implemented under the provisions of Title 10, Code of Federal Regulatio,s, Part 73, " Physical Protection of Plants and Materials" and the specific requirements of your approved Security Plan. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, performance tests, and observationc by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

We have examined actions you have taken with regard to previously identified enforcement matters.

These are discussed in the enclosed inspection report.

The material enclosed herewith contains Safeguards Information as defined by 10 CFR 73.21 and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended.

Therefore, the material, with the exception of the report cover page which is an inspection summary, will ng be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss them with you.

Sincerely, EncLorm conIAINS sArsca.nns Irr0K2 TION.

F. J. Long, Acting Chief UPON SFSARATIcN Itils Reactor Projects Branch 2 PACE IS DEonIROLLED.

Division of Resident and Reactor Project Inspection Enclosure:

See Page 2

AFEGUARDS INFORMATION

$%A3!s'c!* OSSE!NA

$

{

o

_ZEdL

ij

'.

,

Florida Power and Light Company

-

,

MAR 0 215 J2 Enclosure:

Inspection Report No. 50-335/82-07 cc w/ encl:

C. M. Wethy, Plant Manager Nat Weems, QA Construction Manager bcc w/ enc 1:

Document Management Branch /

bcc w/ Inspection Summary NRC Resident Inspector State of Florida a

ENCLOSURE 00:iTAI:13 SAFEGUA3DS INF03'.*ATION.

UPON SEPARATION IHIS PAGE IS DECONIROLLED.

RII RI RII RII RII BHall:my DMcGuire AGib on KLandis FLong 02/4/82 03/) /82 Q2' x/82 0'3/l /82

"3 02/,\\ /82 3,

Q/\\CCpllrsi v 0 l5iC.v 51A"I'l N'.]

ApnD

...i v.s...,

.

.vi v,,,

m