ML20054M938

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-389/82-06 on 820521-26.No Noncompliance Noted
ML20054M938
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 06/18/1982
From: Dance H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML20054M939 List:
References
NUDOCS 8207150172
Download: ML20054M938 (2)


See also: IR 05000389/1982006

Text

, . . . .~ . , - . . - . . - ~ . . . . _ . _ . . _ , . , _ - . _ .g .

. . . .

o ,

'_

,y //rJ

/

JUN 1P 1 W

Florid 1 Power ar.d Light Company

ATIN Dr, R. E. Unrig, Vice President

Advanced Systens and Technology

r C. Bux 529100

Miami, FL 23152

Uentlemen:

Subject Report Ne 50-359/82-06

This refers to t t"4 routine safety inspection conducted by Mr R. L. Fiedler of

thi: office on May 21-26, 1932, of activities authorized by NRC Construction

Pe rr i t N c, . CPPR-14' for the 5t. Lucie facility ano to the discussion of our

fincincs held ., i t h Mr. C. M. Wethy, Plant Manager, at the conclusion of the

inspectinn.

/reas examined during the inspection and our findings are -'i s c u s s ed in the

er.ciosed inspection report. Within these areas, the inspection consisted of

s.lective examinations of procecures and representative records, interviews with

per sonne' and observations by tne inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

In accordance with 10 CFR 2. 790( a), a copy of this letter and the enclosures

will be placed in the NRC's Public Document Room unless you notify this office,

b ,- t e l e;: hon e , within ten days of the date of this letter and submit written

app!ication to withhold information contained therein within thirty days of

the date of this letter. Such application must be consistent with the require-

rant s o r 10 CFR 2. 790( b)(1) .

Sheuld you have any questions concorning this letter we will be glad to discuss

the wi tn yoa.

Sincerel,,

n

htt f

H. C . Dance, Chiet

Reactor Pro ject: Branch 2

Division of Project and

Resident Programs

Enclosure:

inspec tion Report No. 50-389/S2-06

CC w enc I:

(see page 2)

8207150172 820618

PDR ADOCK 05000389

G PDR

{

. .

,

~

e

Florida Power and Light Company 2 JU?i 1 e ; ; __

cc w/ encl:

B. J. Escue, Plant Manager

N Weems, Assistant QA

Construction Manager

bcc w/ encl:

NRC Resident Inspector

Document Management Branch

State of Florida

.

R RII RII RII RI

RII,b

d H

?.Tk1edler:aw FJap 7 ARHerdt

'h ti9:'

klandis CJulian fik6ceAu

nin

06//0/82 06/ '52 06/gk/82 06/[(s/82 06<)L/82 06/782