Category:Letter
MONTHYEARML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 ML24233A2192024-09-0303 September 2024 – Authorized Alternative to Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code IR 05000387/20240052024-08-29029 August 2024 Updated Inspection Plan for Susquehanna Steam Electric Station, Units 1 and 2 (Report 05000387/2024005 and 05000388/2024005) IR 05000387/20240022024-08-12012 August 2024 Integrated Inspection Report 05000387/2024002 and 05000388/2024002 ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification PLA-8117, 23rd Refueling Outage Owners Activity Report (PLA-8117)2024-07-23023 July 2024 23rd Refueling Outage Owners Activity Report (PLA-8117) ML24197A0982024-07-15015 July 2024 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000387/2024010 and 05000388/2024010 PLA-8126, Response to Request for Confirmation of Information Regarding Relief Request 1RR062024-05-29029 May 2024 Response to Request for Confirmation of Information Regarding Relief Request 1RR06 ML24127A2262024-05-29029 May 2024 Issuance of Amendment Nos. 288 and 272 Adoption of TSTF-563 PLA-8122, Annual Radiological Environmental Operating Report (PLA-8122)2024-05-28028 May 2024 Annual Radiological Environmental Operating Report (PLA-8122) PLA-8115, Relief Request IRR06 One Time Extension to the Fourth 10-Year Inservice Testing Program Interval (PLA-8115)2024-05-23023 May 2024 Relief Request IRR06 One Time Extension to the Fourth 10-Year Inservice Testing Program Interval (PLA-8115) IR 05000387/20240012024-05-13013 May 2024 Integrated Inspection Report 05000387/2024001 and 05000388/2024001 IR 05000387/20244042024-05-0707 May 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000387/2024404 and 05000388/2024404 PLA-8094, Radioactive Effluent Release Report and Offsite Dose Calculation Manual PLA-80942024-04-22022 April 2024 Radioactive Effluent Release Report and Offsite Dose Calculation Manual PLA-8094 PLA-8095, 2023 Annual Radiological Environmental Operating Report (PLA-8095)2024-04-22022 April 2024 2023 Annual Radiological Environmental Operating Report (PLA-8095) PLA-8101, Re 2023 Annual Report of Radiation Exposure2024-04-22022 April 2024 Re 2023 Annual Report of Radiation Exposure ML24082A1372024-04-22022 April 2024 Issuance of Amendment Nos. 287 and 271 Adoption of TSTF-568, Revision 2 and Associated Technical Specification Changes PLA-8113, Response to Request for Additional Information Regarding Relief Request 4RR-11 (PLA-8113)2024-04-11011 April 2024 Response to Request for Additional Information Regarding Relief Request 4RR-11 (PLA-8113) PLA-8102, Annual Environmental Operating Report (Nonradiological) PLA-81022024-04-11011 April 2024 Annual Environmental Operating Report (Nonradiological) PLA-8102 PLA-8112, Relief Request 4RR-11 Relief from End of Interval Boundary Leakage Test PLA-81122024-04-0909 April 2024 Relief Request 4RR-11 Relief from End of Interval Boundary Leakage Test PLA-8112 PLA-8110, Submittal of Unit 1 Cycle 24 Core Operating License Report (Pla 8110)2024-04-0404 April 2024 Submittal of Unit 1 Cycle 24 Core Operating License Report (Pla 8110) PLA-8100, Property Insurance Program (PLA-8100)2024-04-0101 April 2024 Property Insurance Program (PLA-8100) ML24092A4022024-04-0101 April 2024 Annual Financial Report (PLA-8098) PLA-8109, Supplement to Request for Exemption from Certain Requirements of 10 CR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance (PLA-8109)2024-03-21021 March 2024 Supplement to Request for Exemption from Certain Requirements of 10 CR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance (PLA-8109) ML24067A2512024-03-19019 March 2024 Authorized Alternative to Requirements of the ASME Code PLA-8107, Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance2024-03-19019 March 2024 Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance ML24044A2532024-03-14014 March 2024 Associated Independent Spent Fuel Storage Installation – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0077 (Security Notifications, Reports, and Recordkeeping & Suspicious Activity Reporting)) IR 05000387/20240112024-02-29029 February 2024 Commercial Grade Dedication Inspection Report 05000387/2024011 and 05000388/2024011 IR 05000387/20230062024-02-28028 February 2024 Annual Assessment Letter for Susquehanna Steam Electric Station, Units 1 and 2 (Reports 05000387/2023006 and 05000388/2023006) ML24039A1882024-02-27027 February 2024 Issuance of Amendment Nos. 286 and 270 Changes to Technical Specifications for Control Rods ML24037A3072024-02-22022 February 2024 Summary of Regulatory Audit in Support of Relief Request 5RR-02 PLA-8099, Proof of Financial Protection and Guarantee of Payment of Deferred Premiums (PLA-8099)2024-02-13013 February 2024 Proof of Financial Protection and Guarantee of Payment of Deferred Premiums (PLA-8099) IR 05000387/20230042024-02-0707 February 2024 Integrated Inspection Report 05000387/2023004 and 05000388/2023004 PLA-8096, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval2024-01-0404 January 2024 Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval PLA-8077, Emergency Plan Revision 67 (PLA-8077)2023-12-27027 December 2023 Emergency Plan Revision 67 (PLA-8077) IR 05000387/20230102023-12-11011 December 2023 Fire Protection Team Inspection Report 05000387/2023010 and 05000388/2023010 PLA-8089, Submittal of Revision to Inservice Testing Program Plan2023-12-0505 December 2023 Submittal of Revision to Inservice Testing Program Plan PLA-8084, Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.22023-11-29029 November 2023 Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 ML23345A0682023-11-28028 November 2023 Technical Specification Bases, Manual PLA-8091, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inseervice Inspection Interval (PLA-8091)2023-11-0808 November 2023 Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inseervice Inspection Interval (PLA-8091) IR 05000387/20230032023-11-0303 November 2023 Integrated Inspection Report 05000387/2023003 and 05000388/2023003 PLA-8082, Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2023-11-0202 November 2023 Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML23291A1132023-10-12012 October 2023 Submittal of Revision 71 to Updated Final Safety Analysis Report and Revision 25 to Fire Protection Review Report ML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23277A0412023-10-0505 October 2023 Notification of Commercial Grade Dedication Inspection (05000387/2024011 and 05000388/2024011) and Request for Information IR 05000387/20233012023-09-20020 September 2023 Initial Operator Licensing Examination Report 05000387/2023301 and 05000388/2023301 ML23254A0242023-09-0606 September 2023 Paragon Energy Solutions LLC, Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) IR 05000387/20230052023-08-31031 August 2023 Updated Inspection Plan for Susquehanna Steam Electric Station, Units 1 and 2 (Report 05000387/2023005 and 05000388/2023005) ML23228A1952023-08-21021 August 2023 Summary of August 10, 2023, Public Observation Meeting Re. Proposed Alternative PLA-8080, Proposed Relief for Valve 251130 (PLA-8080)2023-08-14014 August 2023 Proposed Relief for Valve 251130 (PLA-8080) 2024-09-04
[Table view] Category:License-Operator
MONTHYEARML21245A2192021-09-0202 September 2021 Requalification Program Inspection ML21200A1392021-07-19019 July 2021 Operator Licensing Examination Approval ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20105A1882020-04-14014 April 2020 March 4, 2020, NRC Generic Fundamentals Examination Results for Susquehanna Steam Electric Station, Units 1 and 2 (Cover Letter Publicly Available, Enclosures Withheld from Public) PLA-7852, Response to NRC Regulatory Issue Summary 2020-1 Preparation and Scheduling of Operator Licensing Examinations (PLA-7852)2020-03-19019 March 2020 Response to NRC Regulatory Issue Summary 2020-1 Preparation and Scheduling of Operator Licensing Examinations (PLA-7852) ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19235A0642019-08-22022 August 2019 Operator Licensing Examination Approval PLA-7801, Response to Request for Information Pertaining to a Licensed Operator2019-07-31031 July 2019 Response to Request for Information Pertaining to a Licensed Operator ML19189A3522019-07-0808 July 2019 LLC Licensed Operator Positive Fitness-For-Duty Test ML18296A4472018-10-23023 October 2018 Senior Reactor and Reactor Operator Initial License Examinations PLA-7701, Response to NRC Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examination.2018-04-11011 April 2018 Response to NRC Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examination. ML18060A2842018-03-0101 March 2018 Operator Licensing Examination Approval ML18109A3292018-02-21021 February 2018 Final Qa/Related Forms (Folder 1) ML18086B0252018-02-16016 February 2018 Facility Cover Letter - Ri - March 2018 - GFE ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 PLA-7598, Response to NRC Regulatory Issue Summary 2017-03 'Preparation and Scheduling of Operator Licensing Examinations PLA-75982017-05-0505 May 2017 Response to NRC Regulatory Issue Summary 2017-03 'Preparation and Scheduling of Operator Licensing Examinations PLA-7598 ML17018A2822017-01-17017 January 2017 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2017 IR 05000387/20163012017-01-17017 January 2017 NRC Initial Operator Licensing Examination Report 05000387/2016301 and 05000388/2016301 ML17013A4622016-11-14014 November 2016 Draft Operating Exam (Section a, Section B, Section C) (Folder 2) ML17013A4582016-11-14014 November 2016 NRC Comments on Draft Written Exam (Folder 2) ML17013A4602016-11-14014 November 2016 Draft - Outlines (Folder 2) ML17013A4612016-11-14014 November 2016 Draft Written Exam ((Folder 2) ML17102A8382016-11-14014 November 2016 Final Q/A Related Forms (Folder 1) ML16315A2442016-11-10010 November 2016 and Electric Station Units 1 and 2 - Initial Operator Licensing Operating Test and Writen Examination Approval - ML17102A8392016-11-10010 November 2016 Final Qa/Related Forms - Form ES-401-6 (Folder 1) ML17013A4552016-11-10010 November 2016 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML17013A4572016-11-10010 November 2016 Final Operating Test Sections a, B, and C) (Folder 3) ML17013A4542016-11-10010 November 2016 Final Outlines (Folder 3) ML17013A4592016-11-0404 November 2016 Facility Comments on Draft NRC-Developed Operating Test (Folder 2) ML16155A0692016-06-0202 June 2016 Senior Reactor and Reactor Operator Initial Examinations - Susquehanna Units 1 and 2 IR 05000387/20153022015-10-0707 October 2015 Examination Report 05000387/2015302 and 05000388/2015302; August 17-21, 2015 and August 27, 2015-Susquehanna Steam Electric Station, Units 1 and 2 ML15266A2352015-09-22022 September 2015 Requalification Program Inspection Susquehanna Steam Electric Station, Units 1 and 2 ML15275A3622015-08-27027 August 2015 Handouts to Applicants (Folder 3) Summary of References ML15275A3632015-08-11011 August 2015 Final Outlines (Folder 3) ML15275A3642015-08-11011 August 2015 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML15275A3652015-08-11011 August 2015 Final Operating Exam (Sections a, B, and C) (Folder 3) ML15223A0332015-08-10010 August 2015 Initial Operator Licensing Operating Test and Written Examination Approval ML15244A3162015-07-30030 July 2015 Draft Written Exam (Folder 2) ML15244A3202015-07-30030 July 2015 Draft Operating Exam (Sections a, B, and C) (Folder 2) ML15244A3142015-07-30030 July 2015 Draft - Outlines (Folder 2) PLA-7366, Response to NRC Regulatory Issue Summary 2015-05, Preparation and Scheduling of Operator Licensing Examinations.2015-07-30030 July 2015 Response to NRC Regulatory Issue Summary 2015-05, Preparation and Scheduling of Operator Licensing Examinations. ML15244A3122015-07-27027 July 2015 NRC Comments on Draft FAC-Developed Written Exam (Folder 2) ML15244A3112015-07-27027 July 2015 NRC Comments on Draft FAC-Developed Operating Exam (Folder 2) ML15072A0182015-03-12012 March 2015 Senior Reactor and Reactor Operator Initial Examinations, Susquehanna, Units 1 and 2 IR 05000387/20153012015-02-25025 February 2015 Er 05000387/2015301; 05000388/2015301; January 19-20, 2015; Susquehanna Steam Electric Station, Units 1 and 2; Retake Operator Licensing Examination Report ML15128A4702015-01-21021 January 2015 Final Qa/Related Forms (Folder 1) ML15126A2662015-01-19019 January 2015 Final Outlines (Folder 3) ML15049A3502015-01-19019 January 2015 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML15049A3492015-01-19019 January 2015 Final Operating Exam (Sections a, B, and C) (Folder 3) ML15014A3062015-01-13013 January 2015 Operator Licensing Retake Examination Approval - Susquehanna Steam Electric Station, Units 1 and 2 2021-09-02
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML21245A2192021-09-0202 September 2021 Requalification Program Inspection ML21200A1392021-07-19019 July 2021 Operator Licensing Examination Approval ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 PLA-7852, Response to NRC Regulatory Issue Summary 2020-1 Preparation and Scheduling of Operator Licensing Examinations (PLA-7852)2020-03-19019 March 2020 Response to NRC Regulatory Issue Summary 2020-1 Preparation and Scheduling of Operator Licensing Examinations (PLA-7852) ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19235A0642019-08-22022 August 2019 Operator Licensing Examination Approval ML18296A4472018-10-23023 October 2018 Senior Reactor and Reactor Operator Initial License Examinations PLA-7701, Response to NRC Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examination.2018-04-11011 April 2018 Response to NRC Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examination. ML18109A3292018-02-21021 February 2018 Final Qa/Related Forms (Folder 1) ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 PLA-7598, Response to NRC Regulatory Issue Summary 2017-03 'Preparation and Scheduling of Operator Licensing Examinations PLA-75982017-05-0505 May 2017 Response to NRC Regulatory Issue Summary 2017-03 'Preparation and Scheduling of Operator Licensing Examinations PLA-7598 IR 05000387/20163012017-01-17017 January 2017 NRC Initial Operator Licensing Examination Report 05000387/2016301 and 05000388/2016301 ML17018A2822017-01-17017 January 2017 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2017 ML17013A4602016-11-14014 November 2016 Draft - Outlines (Folder 2) ML17013A4612016-11-14014 November 2016 Draft Written Exam ((Folder 2) ML17102A8382016-11-14014 November 2016 Final Q/A Related Forms (Folder 1) ML17013A4582016-11-14014 November 2016 NRC Comments on Draft Written Exam (Folder 2) ML17013A4622016-11-14014 November 2016 Draft Operating Exam (Section a, Section B, Section C) (Folder 2) ML16315A2442016-11-10010 November 2016 and Electric Station Units 1 and 2 - Initial Operator Licensing Operating Test and Writen Examination Approval - ML17013A4542016-11-10010 November 2016 Final Outlines (Folder 3) ML17013A4552016-11-10010 November 2016 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML17013A4572016-11-10010 November 2016 Final Operating Test Sections a, B, and C) (Folder 3) ML17102A8392016-11-10010 November 2016 Final Qa/Related Forms - Form ES-401-6 (Folder 1) ML17013A4592016-11-0404 November 2016 Facility Comments on Draft NRC-Developed Operating Test (Folder 2) ML16155A0692016-06-0202 June 2016 Senior Reactor and Reactor Operator Initial Examinations - Susquehanna Units 1 and 2 IR 05000387/20153022015-10-0707 October 2015 Examination Report 05000387/2015302 and 05000388/2015302; August 17-21, 2015 and August 27, 2015-Susquehanna Steam Electric Station, Units 1 and 2 ML15266A2352015-09-22022 September 2015 Requalification Program Inspection Susquehanna Steam Electric Station, Units 1 and 2 ML15275A3622015-08-27027 August 2015 Handouts to Applicants (Folder 3) Summary of References ML15275A3652015-08-11011 August 2015 Final Operating Exam (Sections a, B, and C) (Folder 3) ML15275A3642015-08-11011 August 2015 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML15275A3632015-08-11011 August 2015 Final Outlines (Folder 3) ML15223A0332015-08-10010 August 2015 Initial Operator Licensing Operating Test and Written Examination Approval ML15244A3202015-07-30030 July 2015 Draft Operating Exam (Sections a, B, and C) (Folder 2) ML15244A3162015-07-30030 July 2015 Draft Written Exam (Folder 2) ML15244A3142015-07-30030 July 2015 Draft - Outlines (Folder 2) PLA-7366, Response to NRC Regulatory Issue Summary 2015-05, Preparation and Scheduling of Operator Licensing Examinations.2015-07-30030 July 2015 Response to NRC Regulatory Issue Summary 2015-05, Preparation and Scheduling of Operator Licensing Examinations. ML15244A3112015-07-27027 July 2015 NRC Comments on Draft FAC-Developed Operating Exam (Folder 2) ML15244A3122015-07-27027 July 2015 NRC Comments on Draft FAC-Developed Written Exam (Folder 2) ML15072A0182015-03-12012 March 2015 Senior Reactor and Reactor Operator Initial Examinations, Susquehanna, Units 1 and 2 IR 05000387/20153012015-02-25025 February 2015 Er 05000387/2015301; 05000388/2015301; January 19-20, 2015; Susquehanna Steam Electric Station, Units 1 and 2; Retake Operator Licensing Examination Report ML15128A4702015-01-21021 January 2015 Final Qa/Related Forms (Folder 1) ML15049A3492015-01-19019 January 2015 Final Operating Exam (Sections a, B, and C) (Folder 3) ML15049A3502015-01-19019 January 2015 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML15126A2662015-01-19019 January 2015 Final Outlines (Folder 3) ML15014A3062015-01-13013 January 2015 Operator Licensing Retake Examination Approval - Susquehanna Steam Electric Station, Units 1 and 2 ML15126A2622015-01-10010 January 2015 Licensee Comments on Draft Facility-Developed Exam (Written) (Folder 2) ML15126A2632015-01-0808 January 2015 Draft - Outlines (Folder 2) ML15126A2652015-01-0808 January 2015 Draft Operating Exam (Sections a, B, and C) (Folder 2) ML15126A2642015-01-0808 January 2015 Draft Written Exam (Folder 2) ML15146A4192014-10-23023 October 2014 Final Qa/Related Forms (Folder 1) 2021-09-02
[Table view] |
Text
ber 1, 2003
SUBJECT:
SUSQUEHANNA STEAM ELECTRIC STATION UNITS 1 & 2 STATION OPERATOR AND SENIOR REACTOR OPERATOR INITIAL EXAMINATION REPORT NO. 05000387/2003301 AND 05000388/2003301
Dear Mr. Shriver:
This report transmits the results of the reactor operator (RO) and senior reactor operator (SRO)
licensing examination conducted by the NRC during the period of August 8-15, 2003. This examination addressed areas important to public health and safety and was developed and administered using the guidelines of the Examination Standards for Power Reactors (NUREG-1021, Draft Revision 9).
Based on the results of the examination, five Senior Reactor Operators and three Reactor Operator applicants passed all portions of the examination. Two Senior Reactor Operators Upgrade applicants failed the written examination. Examination results indicated that generally the applicants were well prepared for the examination. On September 12, 2003, the NRC provided final examination results, including individual license numbers, during a telephone call between Mr. R. Conte and Mr. Robert Boesch and others of your staff. No findings of significance were identified.
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). These records include the final examination and are available in ADAMS RO and SRO Written - Accession Number ML032650565; RO and SRO Operating Section A -
Accession Number ML032650571; RO and SRO Operating Section B - Accession Number ML032650579; and RO and SRO Operating Section C - Accession Number ML032650586, and Facility Post Examination Comments on the Written and Operating Exams - Accession No.
ML032590862. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Mr. Bryce Should you have any questions regarding this examination, please contact me at (610) 337-5183, or by E-mail at RJC@NRC.GOV.
Sincerely,
/RA/
Richard J. Conte, Chief Operational Safety Branch Division of Reactor Safety Docket Nos. 50-387/50-388 License Nos. NPF-14/NPF-22 Enclosure: Initial Examination Report No. 05000387/2003301 and 05000388/2003301 w/attachments cc w/encl:
J. H. Miller, President - PPL Generation, LLC R. L. Anderson, Vice President - Nuclear Operations for PPL Susquehanna LLC R. A. Saccone, General Manager - Nuclear Engineering A. J. Wrape, III, General Manager, Nuclear Assurance T. L. Harpster, General Manager - Plant Support K. Roush, Manager, Nuclear Training G. F. Ruppert, Manager, Nuclear Operations J. D. Shaw, Manager, Station Engineering T. P. Kirwin, Manager, Nuclear Maintenance R. M. Paley, Manager, Work Management Director, Bureau of Radiation Protection R. E. Smith, Jr., Manager, Radiation Protection W. F. Smith, Jr., Manager, Corrective Action & Assessments D. F. Roth, Manager, Quality Assurance R. R. Sgarro, Manager, Nuclear Regulatory Affairs R. Ferentz, Manager - Nuclear Security C. D. Markley, Supervisor - Nuclear Regulatory Affairs W. E. Morrissey, Supervising Engineer M. H. Crowthers, Supervising Engineer H. D. Woodeshick, Special Office of the President B. A. Snapp, Esquire, Associate General Counsel, PPL Services Corporation R. W. Osborne, Allegheny Electric Cooperative, Inc.
Board of Supervisors, Salem Township J. Johnsrud, National Energy Committee Supervisor - Document Control Services Commonwealth of Pennsylvania (c/o R. Janati, Chief, Division of Nuclear Safety, Pennsylvania Bureau of Radiation Protection)
Mr. Bryce