ML20105A188

From kanterella
Jump to navigation Jump to search
March 4, 2020, NRC Generic Fundamentals Examination Results for Susquehanna Steam Electric Station, Units 1 and 2 (Cover Letter Publicly Available, Enclosures Withheld from Public)
ML20105A188
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 04/14/2020
From: Diane Jackson
Operations Branch I
To: Goodbred J
Susquehanna, Talen Energy
Jackson D
References
Download: ML20105A188 (2)


Text

April 14, 2020 Mr. John Goodbred, Jr.

Training Manager Susquehanna Nuclear, LLC Talen Energy Susquehanna Learning Center 769 Salem Boulevard (NUCLC)

Berwick, PA 18603

SUBJECT:

MARCH 4, 2020, NRC GENERIC FUNDAMENTALS EXAMINATION RESULTS FOR SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 (COVER LETTER PUBLICLY AVAILABLE, ENCLOSURES WITHHELD FROM PUBLIC)

Dear Mr. Goodbred:

On March 4, 2020, the U.S. Nuclear Regulatory Commission (NRC) administered the generic fundamentals examination (GFE) section of the written operator licensing examination to fourteen employees at your facility and all passed. A passing grade is 80 percent or better.

Enclosed with this letter are copies of both forms of the examination, including answer keys, the grading results for your facility, and copies of the individual answer sheets for each of your employees. Please forward the results to the individuals along with the copies of their respective answer sheets.

If you have any questions concerning this examination, please contact Mr. Eric Cushing at 301-415-1064 or Eric.Cushing@nrc.gov.

Sincerely, X /RA/

Signed by: Donald E. Jackson Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-387 and 50-388 Enclosures (Non-Public):

1. Examination Forms A with answers
2. Examination Results Summary for Susquehanna and Individual Answer Sheets cc w/o enclosures: Distribution via ListServ

SUBJECT:

MARCH 4, 2020, NRC GENERIC FUNDAMENTALS EXAMINATION RESULTS FOR SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 (COVER LETTER PUBLICLY AVAILABLE, ENCLOSURES WITHHELD FROM PUBLIC)

DATED APRIL 14, 2020 DOCUMENT NAME: G:\DRS\Operations Branch\GFE\2020\03-04 SUSQ GFE ResultsLtr.docx ADAMS Package No. ML20091M454 ADAMS No. ML20105A188 OFFICE RI/DRS/OB:OLA RI/DRS/OB:BC NAME CBixler DEJ for DEJackson DEJ DATE 04/13/20 04/14/20 OFFICIAL RECORD COPY