Letter Sequence Draft Other |
---|
|
|
|
|
---|
Category:License-Operator
MONTHYEARML21245A2192021-09-0202 September 2021 Requalification Program Inspection ML21200A1392021-07-19019 July 2021 Operator Licensing Examination Approval ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20105A1882020-04-14014 April 2020 March 4, 2020, NRC Generic Fundamentals Examination Results for Susquehanna Steam Electric Station, Units 1 and 2 (Cover Letter Publicly Available, Enclosures Withheld from Public) PLA-7852, Response to NRC Regulatory Issue Summary 2020-1 Preparation and Scheduling of Operator Licensing Examinations (PLA-7852)2020-03-19019 March 2020 Response to NRC Regulatory Issue Summary 2020-1 Preparation and Scheduling of Operator Licensing Examinations (PLA-7852) ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19235A0642019-08-22022 August 2019 Operator Licensing Examination Approval PLA-7801, Response to Request for Information Pertaining to a Licensed Operator2019-07-31031 July 2019 Response to Request for Information Pertaining to a Licensed Operator ML19189A3522019-07-0808 July 2019 LLC Licensed Operator Positive Fitness-For-Duty Test ML18296A4472018-10-23023 October 2018 Senior Reactor and Reactor Operator Initial License Examinations PLA-7701, Response to NRC Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examination.2018-04-11011 April 2018 Response to NRC Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examination. ML18060A2842018-03-0101 March 2018 Operator Licensing Examination Approval ML18109A3292018-02-21021 February 2018 Final Qa/Related Forms (Folder 1) ML18086B0252018-02-16016 February 2018 Facility Cover Letter - Ri - March 2018 - GFE ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 PLA-7598, Response to NRC Regulatory Issue Summary 2017-03 'Preparation and Scheduling of Operator Licensing Examinations PLA-75982017-05-0505 May 2017 Response to NRC Regulatory Issue Summary 2017-03 'Preparation and Scheduling of Operator Licensing Examinations PLA-7598 ML17018A2822017-01-17017 January 2017 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2017 IR 05000387/20163012017-01-17017 January 2017 NRC Initial Operator Licensing Examination Report 05000387/2016301 and 05000388/2016301 ML17013A4622016-11-14014 November 2016 Draft Operating Exam (Section a, Section B, Section C) (Folder 2) ML17013A4582016-11-14014 November 2016 NRC Comments on Draft Written Exam (Folder 2) ML17013A4602016-11-14014 November 2016 Draft - Outlines (Folder 2) ML17013A4612016-11-14014 November 2016 Draft Written Exam ((Folder 2) ML17102A8382016-11-14014 November 2016 Final Q/A Related Forms (Folder 1) ML16315A2442016-11-10010 November 2016 and Electric Station Units 1 and 2 - Initial Operator Licensing Operating Test and Writen Examination Approval - ML17102A8392016-11-10010 November 2016 Final Qa/Related Forms - Form ES-401-6 (Folder 1) ML17013A4552016-11-10010 November 2016 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML17013A4572016-11-10010 November 2016 Final Operating Test Sections a, B, and C) (Folder 3) ML17013A4542016-11-10010 November 2016 Final Outlines (Folder 3) ML17013A4592016-11-0404 November 2016 Facility Comments on Draft NRC-Developed Operating Test (Folder 2) ML16155A0692016-06-0202 June 2016 Senior Reactor and Reactor Operator Initial Examinations - Susquehanna Units 1 and 2 IR 05000387/20153022015-10-0707 October 2015 Examination Report 05000387/2015302 and 05000388/2015302; August 17-21, 2015 and August 27, 2015-Susquehanna Steam Electric Station, Units 1 and 2 ML15266A2352015-09-22022 September 2015 Requalification Program Inspection Susquehanna Steam Electric Station, Units 1 and 2 ML15275A3622015-08-27027 August 2015 Handouts to Applicants (Folder 3) Summary of References ML15275A3632015-08-11011 August 2015 Final Outlines (Folder 3) ML15275A3642015-08-11011 August 2015 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML15275A3652015-08-11011 August 2015 Final Operating Exam (Sections a, B, and C) (Folder 3) ML15223A0332015-08-10010 August 2015 Initial Operator Licensing Operating Test and Written Examination Approval ML15244A3162015-07-30030 July 2015 Draft Written Exam (Folder 2) ML15244A3202015-07-30030 July 2015 Draft Operating Exam (Sections a, B, and C) (Folder 2) ML15244A3142015-07-30030 July 2015 Draft - Outlines (Folder 2) PLA-7366, Response to NRC Regulatory Issue Summary 2015-05, Preparation and Scheduling of Operator Licensing Examinations.2015-07-30030 July 2015 Response to NRC Regulatory Issue Summary 2015-05, Preparation and Scheduling of Operator Licensing Examinations. ML15244A3122015-07-27027 July 2015 NRC Comments on Draft FAC-Developed Written Exam (Folder 2) ML15244A3112015-07-27027 July 2015 NRC Comments on Draft FAC-Developed Operating Exam (Folder 2) ML15072A0182015-03-12012 March 2015 Senior Reactor and Reactor Operator Initial Examinations, Susquehanna, Units 1 and 2 IR 05000387/20153012015-02-25025 February 2015 Er 05000387/2015301; 05000388/2015301; January 19-20, 2015; Susquehanna Steam Electric Station, Units 1 and 2; Retake Operator Licensing Examination Report ML15128A4702015-01-21021 January 2015 Final Qa/Related Forms (Folder 1) ML15126A2662015-01-19019 January 2015 Final Outlines (Folder 3) ML15049A3502015-01-19019 January 2015 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML15049A3492015-01-19019 January 2015 Final Operating Exam (Sections a, B, and C) (Folder 3) ML15014A3062015-01-13013 January 2015 Operator Licensing Retake Examination Approval - Susquehanna Steam Electric Station, Units 1 and 2 2021-09-02
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML21245A2192021-09-0202 September 2021 Requalification Program Inspection ML21200A1392021-07-19019 July 2021 Operator Licensing Examination Approval ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 PLA-7852, Response to NRC Regulatory Issue Summary 2020-1 Preparation and Scheduling of Operator Licensing Examinations (PLA-7852)2020-03-19019 March 2020 Response to NRC Regulatory Issue Summary 2020-1 Preparation and Scheduling of Operator Licensing Examinations (PLA-7852) ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19235A0642019-08-22022 August 2019 Operator Licensing Examination Approval ML18296A4472018-10-23023 October 2018 Senior Reactor and Reactor Operator Initial License Examinations PLA-7701, Response to NRC Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examination.2018-04-11011 April 2018 Response to NRC Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examination. ML18109A3292018-02-21021 February 2018 Final Qa/Related Forms (Folder 1) ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 PLA-7598, Response to NRC Regulatory Issue Summary 2017-03 'Preparation and Scheduling of Operator Licensing Examinations PLA-75982017-05-0505 May 2017 Response to NRC Regulatory Issue Summary 2017-03 'Preparation and Scheduling of Operator Licensing Examinations PLA-7598 IR 05000387/20163012017-01-17017 January 2017 NRC Initial Operator Licensing Examination Report 05000387/2016301 and 05000388/2016301 ML17018A2822017-01-17017 January 2017 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2017 ML17013A4602016-11-14014 November 2016 Draft - Outlines (Folder 2) ML17013A4612016-11-14014 November 2016 Draft Written Exam ((Folder 2) ML17102A8382016-11-14014 November 2016 Final Q/A Related Forms (Folder 1) ML17013A4582016-11-14014 November 2016 NRC Comments on Draft Written Exam (Folder 2) ML17013A4622016-11-14014 November 2016 Draft Operating Exam (Section a, Section B, Section C) (Folder 2) ML16315A2442016-11-10010 November 2016 and Electric Station Units 1 and 2 - Initial Operator Licensing Operating Test and Writen Examination Approval - ML17013A4542016-11-10010 November 2016 Final Outlines (Folder 3) ML17013A4552016-11-10010 November 2016 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML17013A4572016-11-10010 November 2016 Final Operating Test Sections a, B, and C) (Folder 3) ML17102A8392016-11-10010 November 2016 Final Qa/Related Forms - Form ES-401-6 (Folder 1) ML17013A4592016-11-0404 November 2016 Facility Comments on Draft NRC-Developed Operating Test (Folder 2) ML16155A0692016-06-0202 June 2016 Senior Reactor and Reactor Operator Initial Examinations - Susquehanna Units 1 and 2 IR 05000387/20153022015-10-0707 October 2015 Examination Report 05000387/2015302 and 05000388/2015302; August 17-21, 2015 and August 27, 2015-Susquehanna Steam Electric Station, Units 1 and 2 ML15266A2352015-09-22022 September 2015 Requalification Program Inspection Susquehanna Steam Electric Station, Units 1 and 2 ML15275A3622015-08-27027 August 2015 Handouts to Applicants (Folder 3) Summary of References ML15275A3652015-08-11011 August 2015 Final Operating Exam (Sections a, B, and C) (Folder 3) ML15275A3642015-08-11011 August 2015 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML15275A3632015-08-11011 August 2015 Final Outlines (Folder 3) ML15223A0332015-08-10010 August 2015 Initial Operator Licensing Operating Test and Written Examination Approval ML15244A3202015-07-30030 July 2015 Draft Operating Exam (Sections a, B, and C) (Folder 2) ML15244A3162015-07-30030 July 2015 Draft Written Exam (Folder 2) ML15244A3142015-07-30030 July 2015 Draft - Outlines (Folder 2) PLA-7366, Response to NRC Regulatory Issue Summary 2015-05, Preparation and Scheduling of Operator Licensing Examinations.2015-07-30030 July 2015 Response to NRC Regulatory Issue Summary 2015-05, Preparation and Scheduling of Operator Licensing Examinations. ML15244A3112015-07-27027 July 2015 NRC Comments on Draft FAC-Developed Operating Exam (Folder 2) ML15244A3122015-07-27027 July 2015 NRC Comments on Draft FAC-Developed Written Exam (Folder 2) ML15072A0182015-03-12012 March 2015 Senior Reactor and Reactor Operator Initial Examinations, Susquehanna, Units 1 and 2 IR 05000387/20153012015-02-25025 February 2015 Er 05000387/2015301; 05000388/2015301; January 19-20, 2015; Susquehanna Steam Electric Station, Units 1 and 2; Retake Operator Licensing Examination Report ML15128A4702015-01-21021 January 2015 Final Qa/Related Forms (Folder 1) ML15049A3492015-01-19019 January 2015 Final Operating Exam (Sections a, B, and C) (Folder 3) ML15049A3502015-01-19019 January 2015 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML15126A2662015-01-19019 January 2015 Final Outlines (Folder 3) ML15014A3062015-01-13013 January 2015 Operator Licensing Retake Examination Approval - Susquehanna Steam Electric Station, Units 1 and 2 ML15126A2622015-01-10010 January 2015 Licensee Comments on Draft Facility-Developed Exam (Written) (Folder 2) ML15126A2632015-01-0808 January 2015 Draft - Outlines (Folder 2) ML15126A2652015-01-0808 January 2015 Draft Operating Exam (Sections a, B, and C) (Folder 2) ML15126A2642015-01-0808 January 2015 Draft Written Exam (Folder 2) ML15146A4192014-10-23023 October 2014 Final Qa/Related Forms (Folder 1) 2021-09-02
[Table view] |
Text
ES-401 Written Examination Review Worksheet Form ES-401-9
- 1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.
Q# LOK LOO (F/H) (1-5) Stem Cues T/F Cred. Partial Job- Minutia #I Back- Q= SRO B/M/N U/E/S Explanation Focus Dist. Link units ward KIA Only 1 F 3 N s 2 H 2 M s 3 H 4 B s 4 H 4 B s 5 H 2 N s 6 H 3 B s 7 F 2 N E changed no. of core quadrants fm 1 to 2 in Part 1 8 H 3 B s Instructions
[Refer to Section D of ES-401 and Appendix B for additional information regarding each of the following concepts.]
- 1. Enter the level of knowledge (LOK) of each question as either (F)undamental or (H)igher cognitive level.
- 2. Enter the level of difficulty (LOO) of each question using a 1 - 5 (easy - difficult) rating scale (questions in the 2 - 4 range are acceptable).
- 3. Check the appropriate box if a psychometric flaw is identified:
.. The stem lacks sufficient focus to elicit the correct answer (e.g., unclear intent, more information is needed, or too much needless information) .
.. The stem or distractors contain cues (i.e., clues, specific determiners, phrasing, length, etc) .
The answer choices are a collection of unrelated true/false statements .
. The distractors are not credible; single implausible distractors should be repaired, more than one is unacceptable .
One or more distractors is (are) partially correct (e.g., if the applicant can make unstated assumptions that are not contradicted by stem) .
4.
Check the appropriate box if a job content error is identified:
The question is not linked to the job requirements (i.e., the question has a valid KIA but, as written, is not operational in content) .
The question requires the recall of knowledge that is too specific for the closed reference test mode (i.e., it is not required to be known from memory) .
The question contains data with an unrealistic level of accuracy or inconsistent units (e.g., panel meter in percent with question in gallons) .
The question requires reverse logic or application compared to the job requirements .
- 5. Check questions that are sampled for conformance with the approved KIA and those that are designated SRO-only (KIA and license level mismatches are unacceptable).
- 6. Enter question source: (B)ank, (M)odified, or (N)ew. Check that (M)odified questions meet criteria of ES-401 Section D.2.f.
- 7. Based on the reviewer's judgment, is the question as written (U)nsatisfactory (requiring repair or replacement), in need of (E)ditorial enhancement, or (S)atisfactory?
- 8. At a minimum, explain any "U" ratings (e.g., how the Appendix B psychometric attributes are not being met).
ES-401 2 Form ES-401-9
- 1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.
Q# LOK LOO (F/H) (1-5) Stem Cues T/F Cred. Partial Job- Minutia #I Back- Q= SRO B/M/N U/E/S Explanation Focus Dist. Link units ward KIA Only 9 F 2 B s 10 F 2 B s 11 H 2 N s 12 H 3 B s 13 H 3 M s 14 F 2 N s 15 H 4 M s 16 H 3 N E Clarified timeline associated with operator actions.
17 F 3 B s 18 H 3 B s 19 H 3 M s 20 F 3 M s 21 F 2 M s 22 F 1 N u LOD=1. Low Discriminatory Validity. Replaced KA and wrote new Q.
23 H 3 B s 24 F 3 B s 25 H 4 N s 26 H 3 M s 27 F 2 B s 28 F 3 N s 29 H 3 N s 30 H 3 B s
- 1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.
Q# LOK LOO (F/H) (1-5) Stem Cues T/F Cred. Partial Job- Minutia #I Back- Q= SRO B/M/N U/E/S Explanation Focus Dist. Link units ward KIA Only 31 F 4 N s 32 H 3 B s 33 F 2 N s 34 H 3 N s 35 H 3 B s 36 H 3 N s 37 H 3 M s 38 F 3 N s 39 F 2 B s 40 H 3 B s 41 F 4 B s 42 H 3 B s 43 H 4 B s 44 H 4 B s 45 F 3 B s 46 F 3 M s 47 F 2 N s 48 H 3 x M E Revised stem and question to make clear the crew had entered alternate emergency depressurization 49 H 3 B s 50 H 3 x N E Distractor "B" Implausible. Reactor Recirc Pumps would not be running at the 75% power equivalent pre-trip speed following a Scram. Revised distractor B.
51 H 4 x N E Distractor "A" Implausible. Basic knowledge that RPV level is not restored to the normal band during an ATWS at the power level specified. Revised distractor A.
- 1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.
Q# LOK LOD (F/H) (1-5) Stem Cues T/F Cred. Partial Job- Minutia #I Back- Q= SRO B/M/N U/E/S Explanation Focus Dist. Link units ward KIA Only 52 H 3 M s 53 F 3 B s 54 H 2 N s 55 H 3 N s 56 H 3 N s 57 H 3 N s 58 H 3 B s 59 F 3 B s 60 H 2 M s 61 F 3 N s 62 F 3 B s 63 H 2 M s 64 H 4 M s 65 H 3 N s 66 F 1 N u LOD=1. Low Discriminatory Validity. Replaced KA and wrote new Q 67 H 3 B s 68 H 3 B s 69 F 3 M s 70 F 1 B u LOD=1. Low discriminatory validity. Wrote new Q.
71 H 3 B s 72 F 3 B s 73 F 2 N E Replaced APRM power level info with SRV tailpipe temps.
74 F 3 B s 75 F 2 N s
- 1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.
Q# LOK LOO (F/H) (1-5) Stem Cues T/F Cred. Partial Job- Minutia #I Back- Q= SRO B/M/N U/E/S Explanation Focus Dist. Link units ward KIA Only 76 H 2 N N u Not SRO-only; revised the Q to include procedure execution for Rx pressure control.
77 H 3 y M s 78 H 3 y M s 79 H 3 y B s 80 F 3 y B s 81 H 3 y N s 82 H 2 y B s 83 H 3 y M E Changed SP level to be above SRV tailpipe limit.
84 H 3 y N s 85 H 3 y N s 86 H 2 x y M E Removed area labels "Acceptable" and "Not Acceptable" on Figure 3.3.1.2-1. "Minimum SRM Count Rate Versus Signal to Noise Ratio,"
(a provided reference).
87 H 3 y N s 88 H 2 y N s 89 H 3 y M s 90 H 2 y M s 91 H 2 y M s 92 H 3 y N s 93 H 1 x y B u LOD=1. Low discriminatory value. Too easy to determine fuel NOT loaded properly, so can easily eliminate distractor A. Also, distractor B implausible. Wrote new Q.
94 F 2 y B s 95 F 2 y B s 96 F 3 y B s
- 1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.
Q# LOK LOO (F/H) (1-5) Stem Cues T/F Cred. Partial Job- Minutia #I Back- Q= SRO B/M/N U/E/S Explanation Focus Dist. Link units ward KIA Only 97 H 3 y M s 98 H 3 y N s 99 F 2 y N s 100 F 3 y N s