ML18296A447
| ML18296A447 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 10/23/2018 |
| From: | Diane Jackson Operations Branch I |
| To: | Berryman B Susquehanna |
| Jackson D | |
| References | |
| Download: ML18296A447 (4) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PA 19406-2713 October 23, 2018 Mr. Brad Berryman President and Chief Nuclear Officer Susquehanna Nuclear, LLC 769 Salem Blvd., NUCSB3 Berwick, PA 18603
SUBJECT:
SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 - SENIOR REACTOR AND REACTOR OPERATOR INITIAL LICENSE EXAMINATIONS
Dear Mr. Berryman:
In a telephone conversation on October 16, 2018, between Mr. G. Van Den Berg, Operations Training Supervisor, and Mr. T. Fish, Chief Examiner, arrangements were made for the administration of operator licensing examinations at the Susquehanna facility during the weeks of August 26 and September 2, 2019. In addition, the U.S. Nuclear Regulatory Commission (NRC) will make an examination validation visit to your facility the week of July 29, 2019. As this is an NRC developed examination, the NRC will make additional site trips for exam development on dates to be determined as development progresses.
As agreed upon during the telephone conversation, the NRC staff will prepare the examinations based on the guidelines in Revision 11 to NUREG-1021, Operator Licensing Examination Standards for Power Reactors. The NRCs regional office will discuss with your staff any changes that might be necessary before the examinations are administered. Your staff will be given the opportunity to review the examinations during development.
To meet the above schedule, it will be necessary for your staff to furnish the reference materials identified in Attachment 3 to ES-201 as requested by the NRC exam developers. We request that any personal, proprietary, sensitive unclassified, or Safeguards Information in your response be contained in a separate enclosure and appropriately marked. Delays in receiving the required materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be cancelled or rescheduled.
To conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available for exam development as required as well as on the specific dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests, along with any video and audio recordings of the dynamic operating tests, until the NRC takes licensing action on all the applications and any adjudicatory actions on any hearing demands are complete.
Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
B. Berryman 2
To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator waiver or excusal requests (if any) (Office of Management and Budget (OMB) control number 3150-0090) at least 60 days before the first examination date (if possible). Contact Mr. Fish to determine the method for submission of the waiver or excusal requests. Preliminary reactor operator and senior reactor operator license applications (OMB control number 3150-0090) and medical certifications (OMB control number 3150-0024) should be submitted at least 30 days before the first examination date. If the preliminary applications are not received at least 30 days before the examination date, a postponement may be necessary. Final signed applications certifying that all training has been completed and requesting any waivers or excusals, as applicable, should be submitted at least 14 days before the first examination date.
Although the guidelines for receiving waiver or excusal requests call for at least 30 days before the first examination date (preliminary) and 14 days before the first examination date (final), the requests should be submitted as early as possible in the process (see the 60 day guideline above). Resolutions resulting from verbal inquiries by the licensee to the NRC are not binding.
Submittals addressing waivers or excusals, or both, should be in writing (i.e., using NRC Form 398, Personal Qualifications Statement - Licensee, or as directed by Mr. Fish when contacting him to determine the method for submission). The NRC will document its final decision on whether to grant a waiver or excusal on the final (not preliminary) NRC Form 398 submitted for the applicant. The NRC will not provide its decision until the final application is submitted to the agency.
Paperwork Reduction Act Statement This letter contains information collection requirements that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018.
The burden to the public for these mandatory information collections is estimated to average 400 hours0.00463 days <br />0.111 hours <br />6.613757e-4 weeks <br />1.522e-4 months <br /> per examination or response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the information collections. You may submit comments on any aspect of the information collections, including suggestions for reducing the burden, to FOIA, Privacy and Information Collections Branch (T-5F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by electronic mail to infocollects.resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.
Public Protection Notification The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless the document requesting or requiring the collection displays a currently valid OMB control number In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the agencys Rules of Practice, a copy of this letter will be available electronically for public inspection through the Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible on the NRCs Web site at http://www.nrc.gov/reading-rm/adams.html.
B. Berryman 3
After you have been notified by the NRC Chief Examiner or Branch Chief that operator licenses have been issued, please direct any inquiries concerning a formal presentation of certificates to this office. Our goal is to have the operator certificates available for your celebration. At least one month advance notice of your celebration arrangements would be appreciated to plan our senior manager attendance and process the certificates.
Thank you for your cooperation in this matter. Mr. Van Den Berg has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRCs examination procedures and guidelines, please contact Mr. Fish at (610) 337-5369 or me at (610) 337-5306.
Sincerely,
/RA/
Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-387 and 50-388 License Nos. NPF-14 and NPF-22 cc: Distribution via ListServ
B. Berryman 4
SUBJECT:
SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 - SENIOR REACTOR AND REACTOR OPERATOR INITIAL LICENSE EXAMINATIONS DATED OCTOBER 23, 2018 DISTRIBUTION: (via e-mail)
DLew, RA (R1ORAMAIL Resource)
RLorson, DRA (R1ORAMAIL Resource)
DPelton, DRP (R1DRPMAIL Resource)
PKrohn, DRP (R1DRPMAIL Resource)
JYerokun, DRS (R1DRSMAIL Resource)
BWelling, DRS (R1DRSMAIL Resource)
JGreives, DRP SBarber, DRP DBeacon, DRP LMicewski, DRP, SRI TDaun, DRP, RI AGould, DRP, AA CCook, RI, OEDO RidsNrrPMSusquehanna Resource RidsNrrDorlLpl1 Resource DOCUMENT NAME: G:\\DRS\\Operations Branch\\FISH\\Exam 19-SSES Aug Sep 2019\\ES-201-Rev11-SSES CorpNotifyLtr.docx ADAMS PKG No. ML18289A614 ADAMS ACCESSION No. ML18296A447
SUNSIReview
NonSensitive
Sensitive
PubliclyAvailable
NonPubliclyAvailable OFFICE RI/DRS/OB RI/DRS/OB NAME TFish DJackson DATE 10/19/2018 10/23/2018 OFFICIAL RECORD COPY