IR 05000387/1981018

From kanterella
Jump to navigation Jump to search
IE Insp Rept 50-387/81-18 on 810720-25.No Noncompliance Noted.Major Areas Inspected:Review of Security Plan.Details Withheld (Ref 10CFR73.21)
ML20041B383
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 01/13/1982
From: Devlin J, Madden W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20041B377 List:
References
50-387-81-18, NUDOCS 8202230593
Download: ML20041B383 (1)


Text

-

.

.

,

,

,

,

U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT Region I Report No.

50-387/81-18 Docket No.

50-387 Construction Permit No. CPPR-101 Safeguards Group IV Licensee:

Pennsylvania Power and Light Company 2 North Ninth Street g

Allentown, Pennsylvania 18101 (RAM 8)/

(Sy/ / $h)

GN.yURE 71 L5 d2 /

Facility Name:

Susquehanna Steam Electric StataggBGANIZATION) ;,

(DATE)

-Inspection at: Berwick, Pennsylvania Inspection conducted: July 20-25,1981 Date of Last Physical Protection Inspection: None Type of Inspect on:

Preoperationa)'lPhysical Protection Program Review Inspectors:

' d'

M

/ /

-

TW/Madd

, Physi al Protection Inspector date siijned Approved byb ///

' -

/

/

~~

/ JJ Devlin, Acting Chief.. Safeguards section, ddte signed L/ Technical Inspuction Branch Inspection Summary:

Announced, Special, Preoperational Physical Protection Program Review on July 20-25, 1981 (Report No. 50-387/81-18)

Areas Inspected:

Included review of the proposed Security Plan which includes; Security Program Audit; Security Organization; Physical Barriers (Protected Area); Physical Barriers (Vital Areas); Lighting; Access Control (Identification, Authorization, and Badging); Access Control (Search); Access Control (Escorting);

Access Control (Vital Areas); Alarm Stations; Detection Aids; Assessment Aids; Communications; Testing and Maintenance; Compensatory Measures; Power Supply; Response; Locks, Keys and Combinations; and Records and Reports. The inspection involved 34 inspector-hours onsite by a Regional-based inspector. The inspection began during regular working hours and 2 inspection hours were accomplished during offshift periods.

Results:

No items of noncompliance were identified in the 19 areas inspected.

Major installation and acceptance testing of planned security systems and equipment as well as the training and qualification of security organization personnel were on schedule.

Required construction of security operational and training facilities has been completed.

THE INFORMATION ON THIS PAGE IS DEEMED TO BE APPROPRIATE FOR S-F1-82-04 PUBLIC DISCLOSURE PURS_UANT TO 10 CFR 73.21 Copylof ICopies c "E REPORT DETAILS CONTAIN (Sa feguards Information)

12 Pages IA1 WING: SAFEGUARDS n m A g SECTION147 ATONIC ENERGY ACI 1954 8202230593 820201

.VIDIaATIONS OF THE PROTECTION PDR ADOCK 05000387 G

PDR REQUIREENTS 0710 CER 73.21 L