IE Insp Repts 50-387/81-01 & 50-388/81-01 on 810105-08. Noncompliance Noted:Failure to Follow QC Instructions for Insp Cable Terminations Prior to Taping Connections
ML17139A133
Person / Time
Site: Susquehanna  
Issue date: 01/26/1981
From: Mattia J, Narrow L, Paolino R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML17139A129 List:
References
50-387-81-01, 50-387-81-1, 50-388-81-01, 50-388-81-1, NUDOCS 8104300503
Download: ML17139A133 (10)


Text

V.S.

NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT

'I 50-387/81-01 eport No.

50-388/81-01 50-387 Docket No.

50-388 IIAAIAI License No. CPPR-102 Region I Pr i.or ity Category

. Licensee:

'Penns lvania Power and Li ht Com an 2 North Ninth Street Allentown, Pennsylvania 18101 Faci lity Name:

Susquehanna Units 1 and

Inspection at:

Berwick, Pennsylvania Inspection condu ed:

~ nu 'ry 5-8, 1981 Inspectors:

L. Narrow, Reactor Inspector R.

Pa ino, Reactor Inspector 1 ar. g)

date igned

]-y~-Z /

date signed I

Approved by:

. Mattia, Act g Chief, Projects Section RC8ES Branch date signed

/>~~ 8l date signed Ins ection Summar

Unit No.

Ins ection on Januar 5-8 1981, (Re ort No. 50-387 81-01 A~I:

.

d

by dd I

b d

of the licensee's work and gC activities-related to installation of electrical systems; review of licensee's site audit program; and review status of outstanding item~.-

The insnection involved 30 inspector hours on-site.

Results:

No items of noncompliance were identified.

ection on Januar 5-8, 1981 (Re ort No. 50-388/81-01)

(Unit No.

Ins ection nannounced inspection by two regional base i

p censee's work and gC activities.related to installation of electrical ems; review of licensee's site audi audit program; and review status of outst e inspection involved 20 inspector hours on site.

~

~

~

esults:

One item of noncompliance was identified in one of the two ~ areas inspected (Failure to follow gC instructions for inspection of cable terminations prior to taping the connections).

Region I Form 12 (Rev. April 77)

>>o<SOOSM

DETAILS Persons Contacted Penns lvania Power and Li ht Com an

"P.

D. Capotosto, Electrical NQA Engineer E.

W. Carroll, Senior NQA Analyst

"S.

L. Denson, Project Construction Manager

"R.

H. Featenby, Assistant Project Director

"P. Kyner, Resident NQA

"R.

E. Matthews, NQA Engineer

"R. A. Schwarz, Senior Project Engineer, Construction Bechtel Power Cor oration M. Bali, Electrical Engineering Supervisor R. Bresland, Project Engineer K. Buchanan, Assistant Lead Field Engineer D. Donati, Assistant Project Field QC Engineer

~M. A. Drucker, Lead QA Engineer L. Hydrick, Lead QC Engineer, Instrumentation

~H.

F. Lill'igh, Project QA Engineer T. Miner, Project Field Engineer H.

Owen, Storage Supervisor J. Petty, QC Engineer N. Sheety, Lead QC Engineer, Electrical P. Smith, Lead Inspector, Receiving N. Snyder, Assistant Load Engineer, Electrical R. Steigerwalt, Lead Equipment Separations Engineer

  • K. G. Stout, Project Field QC Engineer
  • C. Turnbow, Field Construction Manager Peabod Testin Laborator M: Whelen, Manager

"denotes those persons present at the exit interview.

Other craftsmen and technicians were interviewed as necessary when the inspection interfaced with their work.

Plant Tour The inspector observed work activities in progress, completed work and plant status in several areas of the plant during a general inspection of Units 1 and 2.

The inspector examined work items for obvious defects or noncompliance with NRC requirements or licensee commitments.

Particular

note was taken regarding the presence of quality control inspectors and indications of qual'ity control activities.

In addition, the inspector interviewed craft and supervisory personnel encountered in the work area.

Specific work in progress and completed work observed by the inspector included lay-up of Unit 2 RHR heat exchanger, equipment in receiving and

"hold" areas of the'warehouse; laydown area storage, storage 'of pipe supports and restraints, electrical and instrumentation equipment installation.

The

'inspector questioned installation of a temperature sensing element as discussed in paragraph 3 below.

No items of noncompliance were identified.

ualification of Tem erature Sensin Element Su ort r

During the facility inspection, the inspector observed that the ambient

. temperature monitor (TE-15799A) installation in the Unit 1 drywell did not appear rig'id enough to withstand a seismic event and perform its intended function.

The thermo-element support bracket consisted of a 1/8 inch thick

- stainless steel right angle bracket bolted to a welded unistrut wall support plate.

The licensee stated that these Sensor Assemblies (Identified in Vendor Drawing H33205-4104, =Revision D) were supplied with the installed bracket and that the manufacturer had qualified the installation assembly.

The inspector reviewed-the manufacturer's test report (RMT-57510) and found that the report which had been approved by Bechtel., does not meet the device qualification test requirement of Section 4e nor the documentation require-ment of Section 7 of the purchase specification 8856-J-800.

The licensee furnished the inspector. additional data in the form of a Supplier Deviation Disposition Request (SDDR) 8003 dated November 15, 1979 on the requirement for a Registered Professional Engineer signature and a

reply to the manufacturer dated October 27, 1980 stating it had rejected the SDDR 8003 deviation request.

This item is unresolved pending NRC review of licensee resolution (050-387/81-01; 050"388/81"Ol"Ol).

Electrical Cable and Terminations - Mork Observation The inspector examined work performance, partially completed work and completed work pertaining to the installation of 480V and 4160V cable to determine whether the requirements of applicable specifications, work procedures, drawings and instructions have been met in areas relating to installation, routing', termination and inspectio a.

Items examined for this determination include:

Specifications E-49, E-59, E-60, E10 and E-396.

Cable Scheme. Numbers CP1D0020M, LP1Y0109M, MKlK0212C, HK1K0212D, CPlB053G and CPlB0503H.

Panel No.

1B230LC (Unit 1):

Cable Raceway E1PJ81.

Cable Conduit ClP007, ElP154 and E10155.

- The inspector observed that exposed cables from conduit E1P154 and ElP155 were routed through Cable Tray E10J81 then into Panel No.

, 1B230LC adjacent to conduit ClP007.

There was no separation or barrier between the exposed cable (color code red) and the conduit (color code, orange).

Inspection data was not available at the time of the exit

'nterview to indicate status.

The licensee stated that the separation problem would have been identified in the final inspection and that they had a field procedure (E-10) for accomplishing this task.

The inspector reviewed the field procedure E-10 and found that the procedure does not address separation requirements external to panels/

equipment.

The licensee agreed to revise the field procedure to include separation criteria requirements external to panels/equipment up to the first raceway.

This item is unresolved pending NRC review of licensee procedural changes to ensure all separation.requirements are adhered to and/or justified (050-387/81-01-03).

b.

Items examined for this determination include:

Cable No.

FP2B0504C in Panel No.

2B24021 Cable No's FP2B0504ABC in Panel No.

2B24601 The inspector observed that the cable adjacent to FP2B0504C in panel 2B24021 was not lableled.

Discussions with gC personnel and a search of inspection records indicate the above cable installation had not been inspecte Item 6 of the equality Control Instructions (gCI) E-5.0, Revision 3, dated October 9, 1979 states, in part, that:

"All specialized termin-ations shall have their applicable final inspection activities performed prior to becoming inaccessible for visual inspection due to progression of construction.

Specialized terminations being terminations requiring shrink tubing...tapeing...".

Section 3.3 of gCI-E5.0 requires veri-fication that cable stripping does not nick, scrape or damage wiring.

The licensee was informed that this was in noncompliance with 10 CFR 50, Appendix B, Criterion V in that the cables were terminated, taped and bolted to the respective bus without prior inspection as required in gCI E-5. 0 (050-388/81-01-03).

5.

Electrical (Com onent and S stem) - Work Observation The inspector examined work performance relating to gA Surveillance Audit SSES (CL-37) dated October 30 through December 12, 1980 to determine whether deficiencies identified during the audit were corrected and that the correc-tive action precludes recurrence.

Equipment identified in the audit and examined January 6, 1981 for this determination include:

=

Panels 2C-038, 2C226B and 2C-227B at elevation 719'-0", Area 33.

Panel 2C-038 was found to contain excessive amounts of dirt and debris in the form of paper cups, scrap tubing and scrap wire.

Panel 2C-226B was found to be without heat.

The applications of heat internally to equipment. was identified as a deficiency which had been corrected following the audit report.

Discussions with the licensee, construction personnel and a review of the applicable maintenance requirements indicate the inspection requirements consist of a monthly inspection of the equipment cover for repairs and availability of internal heat.

(The last inspection of the above listed panels was conducted December 16, 1980.)

In addition, the daily walk-through inspection initiated by gC and Field Engineering Personnel in response to MCAR-1-26 had been discontinued.

On January 7, 1981 the licensee issued a memo re-instituting the daily walk-through inspections.

This item is unresolved pending NRC evaluation and verification of sur-veil 1 ance program (050-387/81-01-02; 050-388/81-01-02).

6.

Licensee. Site Audit Pro ram The inspector reviewed the gA audits shown below to determine whether the records establish that the required audits were performed, that the audit procedures or instructions were adhered to, and that audit reports were sent to management.

The inspector also reviewed the auditor s qualifications.

Items examined for this determination include:

gA Procedure 8.2, Revision 8,

"SSES Site guality Assurance Fun'ction" gA Procedure 16.0, Revision 2, "Reporting, Control and Disposition of Nonconforming Conditions" gA Procedure 19.0, revision 3, "Audits" Site Mork Instruction (SMI) No 2., Revision 7, Planning and Reporting of Comprehensive Preplanned Audits" SMI No. 3, Revision 6, "Unannounced Audits" SMI No. 5, Revision 2, Reporting of Deficiencies" SMI No. 7, Revision 2, "Scheduling and Status Keeping of Site Activities" SMI No. 10, Revision 1, "gualification of NgA Auditors" The following "Preplanned Audits" were examined:

Audit No. 85, "Bechtel Field Engineering Turnover Activities" b.

Audit No. 87, "Bechtel gC/gA Turnover Activities" C.

Audit No. 89, "Bechtel Field Procurement" d.

Audit No. 92, "Bechtel Field Engineering Design Calculations" e.

Audit No. 94, "Bechtel Resident Project Engineering Activities" f.

Audit No. 100, "Bechtel gC gualifications and Training" The following Unannounced Surveillance Audits were examined:

Small Pipe Hangers and Supports, February 15, 1980.

b.

Core Drilled Penetrations, April 30-May 7, 198 c.

Large Pipe Hangers, May 23, 1980; d;

Testing of Electrical Cables, August 4-September 10, 1980.

- e.

Field Control and Processing of Design Changes, September 2-25, 1980.

f.

In-Storage Maintenance Surveillance Activities, October 30-December 12, 1980.

g.

Verification of Conduit Installation per.Design Documents, August 25-September 9, 1980.

The inspector also examined the electrical, civil and mechanical activities status logs which showed the status of corrective action for nonconforming conditions identified during audits.

f No items'of noncompliance were identified.

7.

Licensee Action on Previous Ins ection Findin s (Closed)

Unresolved Item (387/78-18-03):

Clarification of acceptable toler-ances for clearance between pipe and box supports.

FCN No.

F-651 which established rigid,restraint clearance tolerances was incorporated as Appendix D of Specification M-213, Revision 7.-

The variations in clearance for hangers HRC-123-H3 and HRC-124-H2 were identified in NCR No. 4872.

This NCR was closed April 4, 1980 based on clearances meeting the revised speci-fication.

The inspector had no further questions concerning this item.

(Closed)

Unresolved Item (387/79-41-01):

Procedures for final inspection

'f pipe supports are vague, gC1 P210A, Revision 9, and P2108, Revision 9, have been issued and resolve the previously identified discrepancies.

(Closed)

Unresolved Item (387/80-01-05):

Unauthorized welding of attach-ment to RPV.

This item was also reported as a significant deficiency in accordance with 10 CFR 50.55(e)

(80-00-02).

The inspector examined the following documents:

GE FDDR K41-193 which was dispositioned by:

(a)

Removal of plate and grinding off heat affected zone in 0.020 inch increments followed by PT and MT examination.

(b)

Measure thickness of base material, (excluding cladding)

and depth of ground out are Mork to be performed in accordance with ASME XI, 1974 Summer

'75 Addendum and measurements (item b above) to be reported to GE Engine" ering for final disposition.

NCR No. 5241 which establishes requirement for removal, of affected material in accordance with FCl-M-180, "Instruction for ASME Section XI Repair of Reactor Pressure Vessel per FDDR KR1-193 and Attachment

"A" Sequence Control Checklist".

Sequence Control Checklist which showed acceptable performance of'he procedure for removal of heat affected material and nondestructive

'-examination which'ere initialed by Bechtel Lead Field Melding Engine-ering, Bechtel gC Engineer, PPSL N(A and the ANI at the appropriate points.

MCAR 1-46 and the Final Report on "Small Pipe Hanger Mislocation on the Reactor Pressure Vessel" dated February, 1980.

This report includes the cause, corrective actions (listed below), safety implications (no impact on safety).

The corrective actions included:

removal of

'anger and heat affected zone as described above; furnish as-built data to GE for final disposition; post notices forbidding welding on surface of RPV; meetings with crafts on are striker, welding, burning, grinding on finished work; and training sessions for field engineers.

This item is resolved.

However, item 80-00-02 remains open pending receipt of the final report from the licensee and review of the corrective actions by an NRC inspector.

(Closed)

Unresolved Item (387/80-21=02):

Inspection of shear clip welding nonconformance identified on NCR No.

6386.

This item was reviewed during Inspection 50-387/80-33 but remained unresolved.

NCR No.

6368 was closed December ll, 1980.

The inspector had no further questions and this item is resolved.

8.

Unresolved Items Unresolved items are matters about which more information is required in order to ascertain whether they are acceptable items or items of noncom-pliance.

Unresolved items identified during the inspection are discussed in Paragraphs 4, 5, and 6.

9.

Exit Interview

. The inspector met with licensee representatives (denoted in Paragraph 1) at the conclusion of the inspection on January 8, 1981.

In addition, the NRC Senior Resident Inspector, Mr.

R. Gallo, attended the meeting.

The inspector summarized the purpose and scope of the inspection and identified the inspection findings.