UNITED STATES
~p,R R600, (4 P0
Docket Nos.
50-387 50-388 Pennsylvania Power
& Light Company ATTN:
Mr. Norman W. Curtis Yice President Engineering and Construction (N-4)
2 North Ninth Street Allentown, Pennsylvania 18101 NUCLEAR REGULATORY COMMISSION
REGION I
631 PARK AVENUE KING OF PRUSSIA, PENNSYLVANIAl 9406 Gentlemen:
Subject:
Combined Inspection 50-387/80-07; 50-388/80-05 This refers to the inspection conducted by Mr. J.
P.
Durr of this office on April 21-24, 1980 at Susquehanna Steam Electric Station, Units 1 and 2, 8erwick, Pennsylvania, of activities authorized by NRC License Nos.
CPPR-101 and CPPR-102 and to the discussions of our findings held by Mr. Durr with Mr.
R.
Featenby of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the Office of Inspection and EnforceIImnt Inspection Report which is enclosed with this letter.
Within
~
~
these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were observed.
In accordance with Section 2.790 ot the NRC's "Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room.
If this report contains any information that you (or your contractor) believe to be proprietary, it is necessary that you make a written application within 20 days to this office to withhold such information from public disclosure.
Any such application must be accompanied by an affidavit executed by the owner of the information, which identifies the document or part sought to be withheld, and which contains a
statement of reasons which addresses with specificity the items which will be considered by the Commission as listed, in subparagraph (b) (4) of Section 2.790.
The information sought to be withheld shall be incorporated as far as possible into a separate part of the affidavit. If we do not hear from you in Boo ex vo b9y
Pennsylvania Power and Light Company this regard within the specified period, the report will be placed in the Public Document Room.
No reply to this letter is required; however, should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Sincerely, Robert T. Carlson, Chief Reactor Construction and Engineering Support Branch Enclosure:
Office of Inspection and Enforcement Combined Inspection Report Numbers 50-387/80-07; 50-388/80-05 cc w/encl:
A.
R. Sabol, b1anager, Nuclear equality Assurance W.
E. Barberich, Licensing Engineer S.
H. Cantone, Superintendent of Plant
Report No.
Docket No.
License No.
Licensee:
-1
CPPR-102 Priority Category 2 North Ninth Street Al 1entown Penns 1 vania 18101 U.S.
NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT Region I 50-387/80-07 50-388/80-05 50-387 50-388 Facility Name:
Sus uehanna Units 1 and
InsPection at:
Berwick, Pennsylvania Inspection condu ged r;l 2]
1g80 Inspectors:
.
P. Durr, Reactor Inspector date signed date signed Approved by:
L. E. Tri
, Chief, Engineering Support Section, RC8ES Branch date signed date signed Ins ection Summar
Unit No.
1 Ins ection on A ril 21-24, 1980 Re ort Number 50-387/80-07
~pf:
A gf 1-d f
g p f d
f, d
inspection of the licensee's site audit program and reviewed the outstanding items file.
The inspection involved.13 inspector-ho'urs on site by one NRC in-spector.
Results:
No items of noncompliance were identified.
Unit No.
2 Ins ection on A ril 21-24, 1980 Re ort Number 50-388/80-05 d:
g
d f p
pf, d
inspection of the licensee's site audit program and reviewed the outstanding items file.
The inspection involved 13 inspector-hours on site by one NRC in-spector.
Results:
No items of noncompliance were identified.
Region I Form 12 (Rev. April 77)
DETAILS Persons Contacted Penns lvania Power and Li ht Com an R. Beckley, Site guality Assurance Engineer
- M. Gorski, Resident Engineer
- W. Gulliver, Acting Resident Nuclear guality Assurance Engineer
- R. Featenby, Assistant Project Director Bechtel Cor oration
- M. Drucker, Lead guality Assurance Engineer N. Griffin, Assistant Project Field Engineer
- J. O'ullivan, Assistant Project Field Engineer
- K. Stout, Project Field guality Control Engineer
denotes those persons present at the exit interview.
Licensee's Action on Previous Ins ection Findin s (Closed)
Noncompliance (387/79-14-01):
Failure to inspect pipe spool for cleanliness prior to closure by welding.
The licensee stated in his response that:
(1) NCR-3618 was issued to document the condition and that the valve directly adjacent to the weld joint would be disassembled and inspected for cleanliness; and (2) an interoffice memorandum would be issued to emphasize the need for notification of quality control when cleanliness boundaries are violated.
The inspector examined NCR-3618 for verification of the disposition and its adequacy.
He also reviewed the guality Control Inspection Record No. 49.0-M204, dated January 3,
1980, and the guality Assurance Letter - 702 which verified the cleanliness of the valve and that it had been monitored.
He verified that an interoffice memorandum was issued on March 22, 1979, noti-fying all quality control and welding engineers to be aware of the need to renotify quality control of cleanliness boundary violations.
Since the occurrence of this item, the inspector has made special efforts to recognize similar noncompliances; none were identified.
This item is considered closed.
(Closed)
Unresolved Item (387/79-14-02):
Welding Procedure Specification Pl-AT-LH-CVN impact test requirements.
The foregoing welding procedure..
was used to weld Pl group 1 material to Pl group 2 material.
It appeared that the ASME Code,Section IX required separate qualification for these materials.
Code reviews and NRC evaluation have found this practice ac-ceptable in this specific use.
This item is considered close.
Plant Tour The inspector toured the Unit
and 2 facilities observing work in progress, completed work and evidence of quality control activities.
It was noted that a large number of pipe caps were missing from the Unit No.
2 Primary Building area.
Reinspection after normal working hours disclosed that...a significant number of pipe caps were not replaced.
Further inspection disclosed that...the 1'icensee has established an inspection program which does identify this kind of a deficiency.
Records are available to show that this condition is regularly identified, proper supervisors notified, and corrective action taken.
However, it did not appear that sufficient cooperation and com-pliance was being given the program by construction forces.
The licensee issued an interoffice memorandum, dated April 23, 1980, em-phasizing the responsibility of construction supervisors to maintain pro-tective covers.
The inspector had no further questions at this time.
I No items of noncompliance were identified.
4.
PP&L ualit Assurance Audit Pro ram
,
The PPSL guality Assurance program was reviewed for audit area and frequency.
These attributes were verified to comply with the PSAR, Appendix 0 and
CFR 50, Appendix B requirements.
No items of noncompliance were identified.
Facilit Turnover Activities In preparation for changing NRC facility construction inspectors, a large part of the inspector's time was devoted to the review of outstanding items.
6.
Exit Interview The inspector met with the licensee's staff members (denoted in paragraph 1) on April 24, 1980, at the conclusion of the inspection.
He summarized the scope and findings of the inspection.