U. S,'UCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT Region I
0 1 8
. ~80-880 80-08 Docket. No.
50-387 License No.
CPPR-101 Priority Category B-l Licensee:
Penns lvania Power 5 Li ht Com an 2 'North Ninth Street Allentown, Penns lvania
. 18101.
Facility Name:
Sus uehanna Steam Electric Station, Unit
Meeting at:
U.S. Nuclear Regulatory Commission Regional Office, King of Prussia, PA Meeting conducted: April 16, 1980 NRC Personnel:
g R.
M. Gallo,'
r Resident Inspector I
,1 z
e s'gned R. ll.
c aug
.
e, rogec s
ection da ss ned Approved by:
gc;, /.
ar son, se
,
eac or ons ruction and Engineering Support Branch
~
date signed date signed MMti MS I
Meeting on April 16, 1980 (Re ort'No. 50-387/80-08)
reas Covere:
1s was a routine meeting e
wi that portion of licensee and g
ftd ftq 118
d tft ft q
d fg the Construction and Preoperational Testing Phases.
Discussions included the inspection program in these areas.
Region I Form 12-1 (Rev. August 77)
~&696@ g 7
'DETAILS Personnel'Attendin Penns lvania'Power'and Li ht Com an S.
S.
R.
E.
A.
R.
W.
H.
L.
H.
M.
R.
A.
Curtis, Vice President, Engineering and Construction, and Project Director Cantohe, Manager, Nuclear Support Denson, Project Construction Manager Featenby, Assistant Project Director Mead, Manager-Nuclear Plant Engineering Sabol, Manager-Nuclear guality Assurance Webster, Integrated Startup Group Supervisor Bechtel Power Cor oration M.
H.
J.
E.
K.
C.
R. Muir, Project Manager
'.
Lilligh, Project guality Assurance Engineer T. Minor, Project Field Engineer B. Poser, Project Engineer G. Stout, Project Field guality Control Engineer Turnbow, Field Construction Manager NRC R.
J.
P.
E.
R.
L.
J.
R.
H.
G.
T. Carlson, Chief, Reactor Construction and Engineering Support Branch W. Devlin, Chief, Security and Investigation Section, Safeguards Branch J.
Knapp; Chief, Radiation Support Section, FF8MS Branch C. McCabe, Chief, Reactor Projects Section 2, ROSNS B'ranch W. McGaughy, Chief, Projects Section, RC8ES.Branch H. Bettenhausen, Reactor Inspector P. Durr, Reactor Inspector M. Gallo, Senior Resident Inspector, Susquehanna H. Nicholas, Reactor Inspector G.
Rhoads, Resident Inspector, Susquehanna
'reas Discussed a
~
b.
C.
d.
Overview-of Construction and Startup Schedule.
Inspection and enforcement policy and programs.
(1)
Construction Program 2)
Preoperational and Startup Program 3)
Health Physics Program (4)
Security Program Near term operating licensing requirements.
Inspection and Enforcement Assessment of PP8L Performance.