Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Rept 50-387/79-37
ML17138B298
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 04/16/1980
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Curtis N
PENNSYLVANIA POWER & LIGHT CO.
Shared Package
ML17138B299 List:
References
NUDOCS 8005130283
Download: ML17138B298 (1)


Text

~ RE0II

~4

"o

I 0O C

Vg gO

++*++

Docket No. 50-387 UNITEO STATES NUCLEAR REGULATORYCOMMISSION

REGION I

631 PARK AVENUE KING OF PRUSSIA, PENNSYLVANIA19406 APR l t'l'"g

+3 Pennsylvania Power

& Light Company ATTN:

Mr. Norman W. Curtis-.

Vice President Engineering and Construction (N-4)

2 North Ninth Street Allentown, Pennsylvania 18101 Gentlemen:

Subject:

Inspection 50-387/79-37 This refers to your letter dated March 6, 1980, in response to our letter dated November 19, 1979.

Thank you for informing us of your actions in this matter.

These actions will be examined during a subsequent inspection of your licensed program.

We have the following comment with respect to item 4 of your March 6, 1980 letter.

As stated in our Inspection Report No. 50-387/79-37, it is our position that a calibration standard containing representative welds must be used during actual weld examinations.

This standard will provide a block acoustically representative of the area being examined.

We continue to feel strongly that this is the best demonstrable way of'ssuring adequate sound penetration of this geometry so as to detect discontinuities of concern.

If, for any reason, you do not plan to use such a calibration standard, please inform us pr omptly.

Your cooperation with us is appreciated.

Sincer ely, PP, Robert T. Carlson, Chief Reactor Construction and Engineering Support Branch CC:

A. R. Sabol, Manager, Nuclear guality Assurance

~

~

W.

E.

Bar berich, Licensing Engineer S.

H. Cantone, Superintendent of Plant