IR 05000341/1987004

From kanterella
Jump to navigation Jump to search
Partially Withheld Matl Control & Accountabilty Insp Rept 50-341/87-04 on 870120-21 & 23 (Ref 10CFR2.790).No Violations Noted.Major Areas Inspected:Snm Control & Accountability Program
ML20210H003
Person / Time
Site: Fermi 
Issue date: 01/30/1987
From: Creed J, Madeda T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML19292G730 List:
References
50-341-87-04, 50-341-87-4, NUDOCS 8702110365
Download: ML20210H003 (1)


Text

-

.

.

.

U.S. NUCLEAR REGULATORY COMMISSION

REGION III

Report No. 50-341/87004(DRSS)

Docket No. 50-341 License No. NPF-43 Safeguards Group IV Licensee: Detroit Edison Company 2200 Second Avenue Detroit, MI 48226 Facility Name:

Fermi 2 Inspection At: Plant Site Inspection Conducted: January 20-21, and 23, 1987 Date of Previous Physical Security Inspection: September 26 and 27, 1983 Type of Inspection: Announced, Material Control and Accountability Inspection Inspector: h

/

9. J. Madeda Date Physical Security Specialist Approved By:

/ Jo y

ff. R. Creed, Chief Date /

(/ Safeguards Section Inspection Sununary Inspection on January 20-21 and 23, 1987 (Report No. 50-341/87004(DRSS))

Areas Inspected:

Included a review of the licensee's Special Nuclear Material Control and Accountability Program.

Results: The licensee was found to be in compliance with NRC requirements in the areas examined during the inspection. The licensee's program for controlling and accounting of Special Nuclear Material was found to be adequate.

,

'

8702110365 870130 PDR ADOCK 05000341 O

PDR

,

l DiCLOSUFI CONTAINS 10CFR2.790 INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED k