U. S. NUCLEAR REGULATORY COMMISSION
' REGION III Report No. 50-341/87010(DRSS)
Docket No. 50-341 License No. NPF-43 Safeguards Group IV Licensee:
Detroit Edison Company 2200 Second Avenue Detroit, MI 48226-Facility Name:
Fermi 2 Atomic Power Plant Inspection At: Monroe Michigan I:1spection Conducted:
February 17-20, 19,, Onsite February 23-24, 196/, In Office Date of Previous Physical Security Inspection:
December 1-4, 1986 Type of Inspection:
Unannounced, Routine Physical Security Inspection Inspectors:
3.i @Jd$lJL 3 /14l 97 T. J. Madeda Date Physical Security Inspector 3.T.
slib(87 G. L. Pirtle Date Physical Security Inspector Approved By: 3.'s.hb s/t6(27 33.R. Creed, Chief Date
,
Safeguards Section
'
l l
Inspection Summary Inspection on February 17-24, 1987 (Reaort No. 50-341/87010(DRSS))
Areas Inspected:
Included Management Effectiveness; Security Program Audit; compensatory Measures; Assessment Aids; Access Control - Vehicles; Detection i-Aids - VA's; and Safeguards Information.
Licensee's corrective measures
!
to several areviously identified ins)ection findings were reviewed.
Results: T1e licensee was found to 3e in compliance with NRC requirements
within the areas examined, except for the following area:
Compensatory Measures - Compensatory measure implementation was not documented in the manner prescribed by the security plan.
Enclosure contains 8703230474 870318 1 PDR ADOCK 0500 Upon separation this O