IR 05000338/1980040

From kanterella
Jump to navigation Jump to search
IE Insp Rept 50-338/80-40 on 801203-05.No Noncompliance Noted.Major Areas Inspected:Inservice Insp Program Review, QA Plans & Procedure Review
ML19341D070
Person / Time
Site: North Anna Dominion icon.png
Issue date: 01/20/1981
From: Economos N, Herdt A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML19341D067 List:
References
50-338-80-40, NUDOCS 8103040801
Download: ML19341D070 (4)


Text

-.

%

,,

UNITED STATES (N k

NUCLEAR REGULATORY COMMISSION qi o

REGION 11 f

101 MARIETTA ST.. N.W., SulTE 3100

%..... #[

JAN 3 01981

.

ATLANTA, GEORGIA 30303 Report No. 50-338/80-40

'

Licensee: Virginia Electric and Power Company Richmond, VA 23261 Facility:

North Anna 1 Docket No. 50-338 License No. NPF-4 Inspection at Ms in house, Nuclear Service Division, Monroeville, PA Inspecto hl

/ #

/

N. Eco o s Dhte Signed O/f/

Approved by:

/

/4

'

A. R. Herdt, Section Chief, RC&ES Branch Ddte Signed SUMMARY Inspection on December 3-5, 1980 This routine, announced inspection involved 20 inspector-hours onsite in the areas of inservice inspection (ISI) program review, quality assurance plans

,

and procedure review.

-

Results

.

Of the two areas inspected, no violations were identified.

-

.

L 8103040 $ $

.

d

.

DETAILS 1.

Persons Contacted Licensee Employees

  • H. L. Travis, NDE Supervisor Other licensee employees contacted included construction cra ftsmen, technicians, operators, mechanic, security force members, and office personnel.

Other Organizations Westinghouse Nuclear Services Division (NSD)

  • D. C. Spencer, Assistant to General Manager
  • F. W. Hemming, Product Assurance Manager
  • B. E. Scanga, Product Assurance Systems Manager
  • Attended exit interview 2.

The inspection scope and findings were summarized on December 5,1980 with those persons indicated in Paragraph 1 above.

3.

Licensee Action on Previous Inspection Findings Not inspected.

4.

Unresolved Items

.

Unresolved items were not identified during this inspection.

5.

Inservice Inspection - Program Review The inspector accompanied the licensee's representative to NSD Headquarte s, Monroeville, Pa.,

i r.

order to review the W Quality Assurance Program Plan, (QAPP) Opertting Procedures Manual (0PR),

Product Assurance Manual (PA) the North Anna Unit 1. ISI program plan for the upcoming outage and to review the remote control tool

-

calibration records.

The above mentioned documents were reviewed in the areas of:

QA program requirements including organizational structure, audit requirements, general QA requirements (examination reports, control of deviations from established program, quality documentation and ' identification of components), work and quality inspection procedures, control of processes, corrective action, document control, control of examinations and examination equipment, quality re cords, inspection scope, inspection intervals, personnel qualification, and NDE records includino provisions for storage.

- -

-.

.

,

.

'

-

The documents reviewed included:

Westinghouse, Nuclear Services Division Quality Assurance Program a.

Plan WCAT 9245, Revision 5.

b.

OPS-MSD-101 Revision 5 Preservice and Inservice Inspection Documenta-tion.

c.

OPR 205-3, Revision 1, Inspection Verification d.

OPR 210-4, Revision 0, Control of Nonconformances of NSD Items and Services.

e.

OPR 210-5, Revision 0 Corrective Action Status Reporting f.

OPR 220-1, Revision 0 NDS Internal Audit Program g.

OPR 230-2, Revision 2 Personnel Qualification for Nondestructive Examination.

h.

OPR 610-1, Revision 2, Preparation of Procedures for Field Services.

1.

OPR 610-3, Revision 1, Control of Field Services Activitics.

j.

PA 10.1 Revision 1 Training, Qualification and Certification of Personnel in Nondestructive Examination.

k.

6.1 Revision 2 Isometric Sketch Preparation and Control

.

1.

6.2 Revision 2 Control of On-Site Inspection Activities m.

6.3 Revision 0 Control of On-Site Inspection Activities for Balance of Plant ISI Programs.

n.

OP9.2 Revision 1 Qualification of Visual Inspection Personnel

o.

RV-ISI-01 Revision 0 Reactor Vessel Inspection Program Preparation and Docum. ntation p.

RV-ISI-02 Revision 0 Remotely Operated Reactor Vessel Inspection Tool Running Procedure Peroperation.

q.

ISI-10 Revision 4 Preservice and Inservice Examination Manual Ultrasonic Equipment Qualification Within those areas, the inspector noted that the Division Operating Procedures, used to govern NSD quality-related activities, address field activities in broad terms which in certain instances are more applicable to construction activities rather than ISI and/or post operation plant modifications / repairs controlled by Section XI and addressed in WCAP9245.

The inspector discussed this matter in detail

-

.

b

with W NSD cognizant personnel and management who agreed to review the procedures and determine the steps that should be taken to improve the

_

situation.

In addition, NSD management agreed to provide ISI coordinators with controlled copies of NSD Operating Manuals and WCAP9245 in order tc facilitate review by NRC at the plants as required.

With the 4reas inspected, no violations were identified.

6.

Refueling Outage II-III Inservice Inspection Plan Review The applicable code for ISI is the ASME Boiler and Pressure Vessel Code,Section XI, 1974 Edition, with Addenda through the Summer of 1975.

Items scheduled for inspection / examination during this outage include selected portions of the reactor vessel to flange weld, loop 1 and 2 outlet nozzle welds, ligaments and other welds in piping and components in the Class 2 and 3 category.

A list of the designated welds is contained in the manual entitled:

Inspection Program Plan for NA-1 Refueling Outage II-III, 2nd Outage /1st Period /1st interval 1980.

(manual) At the time of this inspection, the manual had not yet been approved by W or VEPCO.

Welds designated of ISI were checked for code compliance with respect to type of examination, location and coverage e.g. nozzle to shell and vessel to flange.

In addition, the inspector

,

reviewed calibration records for ISI remotely control tool #1; personnel qualification, equipment / instruments including calibration block certifications. Within these areas, the inspector noted that the expiration dates for eye examinations for three technicians and the Telestronix time mark generator 5/NTF501 were approximately one month away.

The licensee and W NSN stated to have the eye examin;tions and

_

the calibration in order before the crew / equipment departs for NA-1.

Within these areas inspected, no violations were identified.

l

,

l l