IE Insp Repts 50-324-79-18 & 50-325/79-18 on 790518-19.No Noncompliance Noted.Major Areas Inspected:Verification of Piping Supports for Tour Safety Sys in Comparison to as-built Design Drawings
ML19249A708
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 06/20/1979
From: Blackwood E, Foster L, Kellogg P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML19249A703 List:
References
50-324-79-18, 50-325-79-18, NUDOCS 7908240181
Download: ML19249A708 (5)


Text

,

fa arcoq'o UNITED STATES

,

.,_, (f

'g NUCLEAR REGULATORY COMMISSION E ',

s,"g[,!

.

REGION 11

.g '., C a

h 101 MARIETTA sT., N.W., sulTE 3100 o, f ATLANTA, GEORGI A 30303

g*

.....

Report Nos. 50-324/79-18 and 50-325/79-18 Licensee:

Carolina Power and Light Company 411 Fayetteville Street Raleigh, North Carolina 27602 Facility Name: Brunswick Units 1 and 2 Docket Nos. 50-324 and 50-325 License Nos. DPR-71 and DPR-62 Inspection at Brunswick Units I and 2 near Southport, North Carolina bf N

Inspectors:

( (f E. Blackwood O

Date Signed Y[keh 6/l9/7f L. E. Foster'

Date Signed h fbh R

J,.c J. E. Gagliardo,

Date Signed

'

f 79 he W. D. Shafer Date Signed

'

lS W S

dat(/ igned 9z -

,

.

Approved by:

/

/

J

_

ate Sign 6d 20 29 P

cltogg, qdef, Section Chief, RONS Branch SUMMARY Inspection on May 18-19, 1979 Areas Inspected This special, announced inspection involved 33 inspector-hours onsite in the area of verification of piping supports for four safety systems to as built design drawings.

Results Of the four areas inspected, no apparent items of noncompliance or deviations were identified.

]b!I

__ ),

'

7908'240

.

- -.... -.

.

%

DETAILS 1.

Persons Contacted Licensee Employees

  • H. R. Banks, Manager, Nuclear Generation
  • A. C. Tollison, Plant Manager M. Brown, Superintendent, Operations and Maintenance
  • W. Triplett, Supervisor of Engineering W. Tucker, Superintendent, Administration and Technical

-

Other licensee employees contacted included four technicians.

  • Attended exit interview.

2.

Exit Interview The inspection scope and findings were summarized on May 19, 1979 with those persons indicated in Paragraph 1 above.

3.

Licensee Action on Previous Inspection Findings Not inspected.

,

4.

Unresolved Items Unresolved items were not identified during this inspection.

5.

Verification of Location, Installation and Type of Support For Safety Systems Piping to As-Built Design Drawings The following pipe supports were verified for agreement with as constructed drawings:

Support Detail System / Drawing Point Inspection Designation Drawing Sheet No.

Location Findings 2E41-60FH59 9527D6591 HPCI(2)Sh17 17-55-137S SAT 2E41-60SS102 9527D6591 HPCI(2)Sh17 17-172S SAT 2E41-60FliS6 9527D6591 HPCI(2)Sh-17 17-65-220S SAT 2E41-3PG61 9527D-6591 HPCI(2)Sh17 17-33-65S SAT 2E41-60FH60 9527D6591 HPCI(2)Sh17 17-45-95S See Comment 1 2E41-60SSS2 9527D6591 6PCI(2)Sb17 17-402S SAT 1E41-20FH13 9527D65090 HPCI(1)Sh510 510-19S See Comment 2 1E41-60PG7 9527D65090 HPCI(1)Sh510 510-270 See Comment 3 1E41-60A12 9527D65090 HPCI(1)Sh510 510-5 SAT 1E41-2VH1 9527D65090 HPCI(1)Sh510 510-219 SAT 1E41-2P62 9527D65090 HPCI(1)Sh510 510-224 SAT

'

.. h

,

_

.

'

-2-IE41-60FH8 9527D65090 HPCI(1)Sh510 510-40 SAT 2E51-11FS40 9527D6600 RCIC(2)Sh'i9 49-325 SAT 2E51-16P693 9527D6600 RCIC(2)Sh49 49-270 SAT 2E51-16SS91 9527D6600 RCIC(2)Sh49 49-270 SAT 2E51-17FH38 9527D6600 RCIC(2)Sh49 49-225 SAT 2E51-17PG37 9527D6600 RCIC(2)Sh49 49-225 SAT 2E51-10PG39 9527D6600 RCIC(2)Sh49 49-350 SAT 2E51-4SS87 9527D6597 RCIC(2)Sh12 12-272 See Comment 5 2E51-40SS84 9527D2846 RCIC(2)Sh12 12-257 See Comment 6 2E51-40SS86 9527D2846 RCIC(2)Sh12 12-558 See Comment 6 2E21-39SS109 9527D6565 CS(2)Sh18 18-901(E)

SAT 2E21-15SS20 9527D6565 CS(2)Sh20 20-101 See Comment 4 (Two Devices)

2E21-6SS21 9527D6565

'S(2)Sh19 19-110 SAT 2E21-6SS22 9527D6565 CS(2)Sh19 14-130 SAT 2E21-28SS23 9527D6565 CS(2)Sh19 19-37 SAT 2E21-40FS90 9527D6567 CS(2)Sh18 18-236 See Comment 7 (Two Devices)

2E21-45A94 9527D6567 CS(2)Sh167D 167D-30 SAT (Two Devices)

2E21-6PG85 9527D6567 CS(2)Sh167B 167B-40 SAT 2E21-40SS106 9527D6565 CS(2)Sh18 18-900X SAT 2E21-39SS108 9527D6565 CS(2)Sh16 16-9003 SAT 2E21-40SS107 9527D6565 CS(2)Sh18 18 901E SAT 2E51-40SSS8 9527D6597 IU0R(2)Sh12 12-281 F 4T 2E51-40SS85 9527D6597 RHR(2)Sh12 12-264 SAT 2E51-40SSb4 9527D6597 IUDR(2)Sh12 12-257 SAT 2E51-40SSB3 9527D6597 RHR(2)Sh12 12-246 SAT (Two Devices)

2E51-40PG6 9527D6597 IUUl(2)Sh12 12-10 SAT 2E51-40PG7 9527D6597 IUDR(2)Sh12 12-35 SAT 2E51-40FH10 9527D6597 RHR(2)12 12-245 SAT 2E51-40SS86 9527D6597 RHR(2)Sh12 12-256 SAT 2E11-116FH142 9527D6553 RER(2)Sh1 1-230L SAT 2E11-116FS147 9527D6553 RHR(2)Sh1 1-150R SAT 2E11-116SS143 2527D2553 RHR(2)Sh1 1-145R SAT 2E11-71SS393 9527D6553 RHR(2)Sh48 48-165S SAT 2E11-95SS233 9527D6555 RHR(2)Sh2 2-163 SAT 2E11-95SS234 9527D6555 IUUl(2)Sh2 2-162 SAT 2E11-95SS235 9527D6555 IUUl(2)Sh2 2-161 SAT 2E11-47SS227 9527D6555 RHR(2)Sh28 28-523 SAT 2E11-473S228 9527D6555 RHR(2)Sh28 28-828 SAT 2E11-46SS216 9527D6555 RHR(2)Sh28 28-452 SAT 2E11-46SS217 9527D6555 RHR(2)Sh28 28-452 SAT 2E11-46SS218 9527D6555 RHR(2)Sh28 28-452 SAT 2E11-89SS439 9527D6556 RHR(2)Sh55 55-77S SAT 2E11-89SS487 9527D6556 RHR(2)Sh55 55-64S SAT 2E11-89sS491 9527D6556 RHR(2)Sh55 55-304S SAT 2E11-50SS201 9527D6554 RHR(2)Sh60 60-154 SAT 2E11-21SS63 9527D6554 RHR(2)Sh3 3-322S SAT (Two Devices)

bi

-' ( C

.

&

.

-3-s 2E11-18SS40 9527D6554 RHR(2)Sh3 3-140S SAT (Two Devices)

2E11-46SS511 9527D6554 RHR(2)Sh28 28-478 SAT 2E11-56SS504 9527D6554 RHR(2)Sh28 28-325S SAT COMMEhT 1 HPCI Fixed Pipe Hanger (2E41-60FH60) located 9 ft. 2 ins. from valve instead of 7 f t. O ins. as shown on as built drawing 9527-D-6591.

COMMEhT 2 HPCI fixed pipe hanger (IE41-20FH13) (trapeze type) for 10 ins. pipe not located in center of cross bar as shown on detail drawing located about 3 ins. off center in between hangers located 2 f t.

11 ins. apart.

(0ft center reported to be no problem.)

COMMEhT 3 HPCI fixed pipe guard support plate for pipe guide (IE41-60PG7) not full weld in attacament to support beam (reported to be no problem designed with weld skips to allow for differential expansion).

COMMEhT 4 One core spray pump discharge piping snubber (2E21-15SS20) located 1 ft. 3 ins. off from dimensions as shown from valve on as built drawing 9527-D-6565.

COMMEhi 5 RCIC snubber (2E51-4SS87) located on opposite side of piping elbow from that shown on as built drawing 9527-D-2846 (Drawing will be revised).

COMMEhT 6 RCIC snubbers (2E51-40SS84 and 2E51-40SS86) at locations #257 and #258 nucbers were swapped from as shown on as built drawing 9527-0-2846 (drawing will be revised).

COMMEhT 7 Core spray fixed pipe supports (2E21-40FS90) located 1) ins. closer to slidding support than as shown on as built drawing 9527-D-6567.

The problems as identified above by the NRC inspection were reviewed with the licensee and he discussed them with the United Engineers and Constructors (UE&C) Engineer who performed the seismic analysis.

The resolutions to Comments 1, 4, 5 and 7 are discussed in Attachment 3 of CP&L correspondence to b'RR (T. A. Ippolito) Serial GO-79,1401 of May 29,1979. These resolutions as determined by a stress analysis showed no adverse impact on the pipe stresses.

The licensee indicated that where significant discrepancies

'

n.

k.

.

~

.

_4

-

existed between the as built systen and the drawings; i.e.

Locations12-272, 12-257 and 12-258 the drawings would be changed. Maintenance items identified during the inspection such as loose jam nuts, missing nuts and bolts and mis-alignments were identified to the licensee, and he promptly prepared work request to have these corrected.

'

,,

,,

.

.