IR 05000325/1979023
| ML19249E681 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 07/23/1979 |
| From: | Gillespie F, Hodges J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML19249E676 | List: |
| References | |
| 50-325-79-23, NUDOCS 7910020158 | |
| Download: ML19249E681 (1) | |
Text
ETGIR TF " ? '.T- I'-- ~'"7 COM ES2.M m.
...J
[#" "%,'o
-
UNITED S'ATES l'
ig NUCLEAR REGULATORY COMMISSION
,,g g
REGION 11
- .l '
c o,
f 101 MARIETTA sT., N.W., sulTE 3100
,
ATLANT A. GEORGI A 30303
'
'%>
j'
JUL 2 51979
""*
Report No. 50-325/79-23 Docket No. 50-325 License No. SNM-1623 Safeguards Group IV Licensee: Carolina Power and Light Company Attn:
Mr. J. A. Jones Executive Vice President Engineering, Construction & Operation 411 Fayetteville Street Raleigh, NC 27602 Facility Name:
Brunswick Unit 1 Inspection at Brunswick site Inspection Conducted: July 9-12, 1979 Date of last Material Control and Accounting Inspection Visit:
September 1-2, 1976 (Unit 1)
Type of Inspection: -J nannoun d Material Control & Accounting Inspector:
'_
[, / l[/fII
~~//_'>- h 7 / _
s Safe da Auditor
/Datd Signed gQ.W. Hod
[/
7/33/77
[
- '
Approved by:
F. '7.' Gillespie, Acting ection Chief, MC&A
'Date'Signeu Inspection Summary:
Areas 6 pected:
Material Control and Accounting. The inspection involved 23 inspector-hours on site by one NRC inspector and was begun during the regular hours.
Results: The licensee was found to be in compliance with NRC requirements in the one area examined during the inspection.
g_yg
Sa
_
er Copies Copy
77 -v m
'Ihis O c c n~ -
i U F 0 t t U D 1075 }Q.h repredac ed r: T n'.
- ccific approval cf IE
- II
.....m -* ti ea "*/"*'l
.n h
_
791 0020 15 {
_