IE Insp Repts 50-324/79-01 & 50-325/79-01 on 790109-12.No Noncompliance Noted.Major Areas Inspected:Refuel Shutdown Planning,Annual Emergency Plan Drill,Plant Tour,Ler Review, IE Circular & Bulletin Review
ML19276F214
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 02/14/1979
From: Dance H, Dyer J, Riley B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML19276F210 List:
References
50-324-79-01, 50-324-79-1, 50-325-79-01, 50-325-79-1, NUDOCS 7903280059
Download: ML19276F214 (4)


Text

.

  1. gm Afoug'o, UNITED STATES NUCLEAR REGULATORY COMMIS$10N

,

[

R EGION 11

,

o

-

,. $

101 MARIETTA STREET.N.W.

\\,...../

Report No.-

50-325/79-1 and 50-324/79-1 Licensee:

Carolina Power and Light Company 336 Fayetteville Street Raleigh, North Carolina 27602 Facility Name:

Brunswick Docket Nos.: 50-325 and 324 License Nos.

DPR-71 and EPR-62 Inspection at:

Brunswick Site, Southport, North Carolina Inspector:

(

de

/n,

1-t4 17 B. W. Ril'ey

'/ ~

Date Signed Accompanying Personnel:

J. A. Dyer, Reactor Inspector Nuclear Support Section No. 1, Region II Approved by:

(

A, uc__

2. - t 4 - 71 H. C. Dance, Bection Chief, RONS Branch Date Signed SUMMARY Inspection on January 9-12, 1979 (Report Nos. 50-324/79-1, 50-324/79-1)

Areas Inspected This routine, unannounced inspection involved 31 inspector-hours onsite in the areas of Unit 1 Refuel Shutdown planning, annual Emergency Plan Drill, plant tour, Licensee Event Report review, and IE Circular and Bulletin review.

Results Of the five areas inspected, no apparent items of noncompliance or devia-tions were identified.

79032805057

.

DETAILS 1.

Persons Contacted Licensee F;mloyees

  • A.

C. Tollison, Jr., Plant Manager AW. M. Tucker, Superintendent, Technical and Administration S. E. Thorndyke, Operating Supervisor W. L. Triplett, Engineering Supervisor L. A. Rogers. Regulatory Coordinator Other Organizations hM. C. Ashenden, Reactor Inspector, USNRC AAttended exit interview 2.

Exit Interview The inspection scope and findings were summarized on January 12, 1979 with those persons indicated in Paragraph 1, above.

3.

Licensee Action on Previous Inspection Findings Not inspected.

4.

Unresolved items Unresolved items were not identified during this inspection.

5.

Shutdown Planning The inspector reviewed and discussed with appropriate plant personnel scheduling and planning activities for the refuel shutdown commencing January 13, 1979 on Unit 1.

Within the scope of review, no problems were identified.

6.

Emergency Plan Drill The inspector observed the annual Emergency Plan drill and critique conducted by the licensee on January 11, 1979. Minor comments developed by the inspector were discussed with Mr. A. C. Tollison to be considered in their overall evaluation of the dril.

.

-1-7.

Plant Tour The inspectors toured the reactor buildi.7g's radwaste building, control rooms, portions of turbine building and yard areas.

Within the scope of tour and observation, no problems were identified.

8.

Licensee Event Report Follow-Up The below listed licensee event reports were reviewed in office for potential generic problems, to detect trends, to determine if the information provided meets NRC reporting requirements, and to consider whether corrective action reviewed appeared appropriate.

All reports were further reviewed at the site to verify adequacy of information provided, corrective action taken and compliance with Technical Specifications and other regulatory requirements.

The inspector examined internal reports, correspondence, operating records and discussed events with appropriate personnel.

LER No.

Date Event 1-78-76 10/11/78 Torus Water Level Low 1-78-80 11/01/78 Co:4tainment Oxygen Monitor Inoperable 1-78-81 10/28/78 Main Streamline Drain Isolation Valve Inoperable 1-78-84 11/02/78 Torus Water Level High 1-78-87 11/14/78 Torus Water Level High 1-78-88 11/14/78 Fire Station Inoperable 1-78-89 11/14/78 HPCI EGR Actuator Inoperable 1-78-91 11/20/78 Primary Containment Hatches Delayed Leak Rate Test 1-78-94 11/22/78 Fire Suppression Water Tank Low Level 2-78-67 8/30/78 Hydraulic Pipe Snubber Low on Fluid 2-78-72 11/01/78 Rod Block Monitor Channel Setpoint Drift 2-78-73 9/27/78 Condensate Demineralizer Conductivity Alarm Inoperable

A

,

-2-2-78-75 11/22/78 HPCI and RCIC Missed Surveillance Tests 2-78-80 11/25/78 Remote Shutdown Drywell Temperature Recorder Inoperable 2-78-82 11/11/78 Torus Water Level High The inspector reviewed with appropriate licensee personnel the necessity for Licensee Event reports to be enmplete, accurate and submitted within the required timeframes as stated in plant Technical Specifications.

Examples of administrative control problems in these areas were presented by the inspector.

The Plant Manager stated they would review their administrative practices in these areas.

9.

IE Circular and Bulletin Follow-Up The inspector reviewed the status of outstanding circulars and bulletins and reviewed the licensee actions.

As a result of these reviews, the following bulletin is considered closed.

IEB 78-10, Bergen-Paterson Hydraulic Shock Suppressor Accumulator Spring Coils