ML19249A702

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-324/79-18 & 50-325/79-18 on 790518-19.No Noncompliance Noted
ML19249A702
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 06/20/1979
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Jackie Jones
CAROLINA POWER & LIGHT CO.
Shared Package
ML19249A703 List:
References
NUDOCS 7908240174
Download: ML19249A702 (2)


See also: IR 05000324/1979018

Text

b

.

'o

UNITED STA i.'S

E'

"i

NUCLEAR REGULATORY COMMISSION

.

3 s. .M *E

REGION ll

5'

  • d @i

101 MARIETT A sT., N.W., SUIT E 3100

o

AT L ANTA, G EORGI A 30303

'

gu j'

InReply... Refer To:

JUN 2 01979

.

RII:JE0

50-325/79-18

50-324/79-18

Carolina Power and Light Company

Attn:

J. a. Jones, Executive Vice President

and Chief Operating Officer

411 Fayetteville Street

Raleigh, North Carolina 27602

Gentlemen:

This refers to the inspection conducted by J. E. Ouzts of thiu office on

May 18-19, 1979 of activities authorized by hTC License No. DPR-71 and

DPR-62 for the Brunswick facility, Units 1 and 2, and to the discussion

of our findings held with A. C. To11ison at the conclusion of the

inspection.

Areas examined during the inspection and our findings are discussed in

the enclosed inspection report. Within these areas, the inspection

consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspectors.

Within the scope of this inspection, no items of noncompliance were

disclosed.

In accordance with Section 2.790 cf the NRC's " Rules of Practice",

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and

the enclosed inspection report will be placed in the h7C's Public

Document Room.

If this report contains any information that you (or

your contractor) believe to be proprietary, it is necessary that you

make a written application within 20 days to this office to withhold

such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is

claimed that the information is proprietary, and should be prepared so

that proprietary infcrmation identified in the application is contained

in a separate part of the document.

If we do not hear from you in this

regard within the specified period, the report will be placed in the

Public Document Room.

,. -

g

-

I

7908240

-

.

'UN ' 01379

Carolina Power and

'

Light Company

-2-

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

eEI.(:.

sk

R. C.

ewis, Acting Chief

Reactor Operations and

Nuclear Support Branch

Enclosures:

Inspection Report Nos. 50-325/79-18

and 50-324/79-18

cc w/ enclosures:

A. C. Tollison, Jr.

Plant Manager

Box 458

Southport, North Carolina 28461

,, :

"(

)