IR 05000315/1986018

From kanterella
Jump to navigation Jump to search
Partially Withheld Physical Security Insp Repts 50-315/86-18 & 50-316/86-18 on 860414-18 (Ref 10CFR73.21).Major Areas Inspected:Security Organization,Records & Repts,Testing & Maint & Contingency Plan Review
ML17324A873
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 05/01/1986
From: Belanger J, Kniceley J, Madeda T, Madera T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML17324A872 List:
References
50-315-86-18, 50-316-86-18, NUDOCS 8605050210
Download: ML17324A873 (4)


Text

NUCLEAR REGULATORY COMMISSION

REGION III

Reports No. 50-315/86018(DRSS);

50-316/86018(DRSS)

Docket Nos.

50-315; 50-316 Licenses No.

DPR-58; DPR-74 Safeguards Group IV Licensee:

American Electric Power Service Corporation Indi ana and Michi gan Electri c Company 1 Riverside Plaza Columbus, OH 43216 Facility Name:

Donald C.

Cook Nuclear Power Station, Units 1 and

Inspection At:

Donald C.

Cook Site, Bridgman, MI Inspection Conducted:

April 14-18, 1986 Date of Last Physical Protection Inspection:

February 24-27, 1986 Type of Inspection:

Announced, Reactive Physical Security Inspection Inspectors:

. J.

Madeda Physical Security Inspector J.

L. Bel anger Physical Security Inspector sly II4 Date eli~+

Date J.

R. Kniceley Physical Security Inspector slilz'4 Date Approved By:

J.

R. Creed, Chief afeguards Section Date Ins ection Summar Ins ection on A ril 14-18 1986 Re orts No. 50-315/86018 DRSS 50-316/86018 DRSS Areas Ins ected:

Included a review of security management effectiveness; security organization; records and reports; testing and maintenance; locks, keys and combinations; physical barrier vital areas; power supply; 860 0 02 0 PDR

  • DOCH, 0500

Eoclosure contains SA'FEGUARDS INFORMATION Upon separation this page is Decontrol,led

4.

a"3i

~). <lf'.l t"gf fQ f~ p<Q'QQ ]

lighting; compensatory measures; access control personnel, packages and vehicles; detection aids vital areas; alarm stations; personnel training and qualifications; contingency plan review and safeguards information.

The inspection began during the dayshift.

Results:

The licensee was found to be in compliance with NRC requirements in the areas inspected.

Two open items were identified during this inspection.

All previously identified violations and open items were closed.