Text
{{#Wiki_filter:.., e.
8% UNITED STATES tg ,e g NUCLEAR REGULATORY COMMISSION [ {)P( $
REGION I
G -[
- j 631 PARK AVENUE O *[(
g KING OF PRUSSI A, PENNSYLVANI A 19406 j ' '%/ j' ..... Docket No. 50-311 ApR 06 im Public Service Electric & Gas Company ATTN: Mr. T. J. Martin Vice President Engineering and Construction 80 Park Place Newark, New Jersey 07101 Gentlemen: Subject: Inspection 50-311/79-12 This refers to the inspection conducte: by Mr. A. Finkel of this office on February 13-14, 1979, at Salem Nuclear Generating Station, Unit 2, at Hancocks Bridge, New Jersey, of activities authorized by NRC License No.
CPPR-53, and to the discussions of our findings held by Mr. Finkel with Mr. E. Meyers of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the Office of Inspection and Enforcement Inspection Report which is enclosed with this letter. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the inspector.
Based on the results of this inspection, it appears that one of your activities was not conducted in full compliance with NRC requirements, as set forth in the Notice of Violation, enclosed herewith as Appendix A.
This item of noncompliance has been categorized into the levels as described in our correspondence to you dated December 31, 1974.
This notice is sent to you pursuant to the provisions of Section 2.201 of thc NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.
Section 2.201 requires you to submit to this office, within thirty (30) days of your receipt of this notice, a written statement or explanation in reply including: (1) corrective steps which have been t= ken by you and the results achieved; (2) corrective steps which will be taken to avoid further items of noncompliance; and (3) the date when full com-pliance will be achieved.
700723 oc>u 412 22 0
. . Public Service Electric
and Gas Company In accordance with Section 2.790 of the NRt,'s " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room.
If this report contains any information that you (or your contractor) believe to be proprietary, it is necessary that you make a written application within 20 days to this office to withhold such information from public disclosure.
Any such application must be accompanied by an affidavit executed by the owner of the information, which identifies the document or part sought to be withheld, and which contains a statement of reasons which addresses with specificity the items which will be considered by the Commission as listed in subparagraph (b)(4) of Section 2.790. The information sought to be withheld shall be incorporated as far as possible into a separate part of the affidavit.
If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document Room.
Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Si r. 'erely, ko W. l}{{htw Robert T. Carl o Chief Reactor Construction and Engineering Support Branch Enclosures: 1.
Appendix A, Notice of Violation 2.
Office of Inspection and Enforcement Inspection Report Number 50-311/79-12 cc w/ encl: E. N. Schwalje, Manager - Quality Assurance, Engineering and Construction Department AI2 2% }}