U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT
- Region I Report N /79-2 '
- aocket N Licensa N CPPR-53 Priority----------
Category __..B..... l ____ _
Licensee:
Public Service Electric & Gas Compan SO Park Place Newark, New Jersey 071 or Facility Name:
Sal em Nuclear Generating Station, Unit 2 Inspection at: Newark, New Jersey Inspectors:
.
.
Approved by: S.+~, (~EM.Oring Support Section 2, RC&ES Branch Inspection Summary:
~/-;>.'!I z 9 dlte stgTled date signed Inspection on April 4, 1979 (Report No. 50-311/79-25)
. Areas Inspected: Routine, announced inspection by r.egional based inspector at licensee 1s Newark, New Jersey office, to resolve outstanding issues reported in NRC report 50-311/79-21. The inspection involved six inspector-hours at the corporate office by one regional based inspecto Results:
No items of noncompliance were ideritified *
Region I Form 12.
(Rev. April 77)
1909110 J 0 7
(
J
DETAILS L
Persons Contacted Public Service Electric* and Gas Company * *
Mr* *. N. Allman, Engineer
.
- Mr. F. Christiana, Chief Controls Engineer
- Mr. D.~ Evans, Assistant Manager - QAD
- Mr. J. P. Gagliardi;, Controls Engineer
- -** * * --...
- Mr"' E. A. Liden, Project Licensing Manager
- Mr. T. J. Martin, V. P. Engineering & Construction
- Mr~. R. L. Mittle, G. M. License & Environmental Mr *. F. Omohundro, Assistant Manager - QAD
- Mr. M. Rosenzweig, QA Coordinator - Salem Mr. J. Wroblewski, Principal Engineer Mr. B. Yewdall, Engineer
- Denotes those present at the exit in~ervie *. ~Status of Previously Identified Unresolved Items (Closed) 311/79-21-02): Vendor qualification test data for containment
'Radiation Monitors 2Rl l, 2Rl 2A and 2Rl 2B. _.The inspector examined the seismic test data and results presented in Wyle Test Report No.
1s 43870-1 and-44040-1 for plant vent Radiation Monitors R41A, R41B and R41C. * The containment Radiation Monitors were determined to be similar to the plant vent Radiation Monitors and therefore seismically qualified by-these test report In addition, the licensee presented calculated data, Attachment 1 to licensee letter of April 11, 1979; indicating that the monitors meet sensitivity**raqutrements_of the_.purcflasa::*
specifications. This item is resolved. *
(Closed) (311/79-21-03): Containment sample. line configuration, location and desig The licensee indicated to the inspector (via flow patterns) that operation of the ventilation system, consisting of the fan cooler units, the control rod drive vent fans and the reactor nozzle support and shield vent fans would provide a thorough*mix of the containment air mass so that a single sampling point would provide a reasonable estimate of any containment radioactivity that may be present in the movement of the contained air*mass by the ventilation systems *
- In addition, the licensee stated that all releases from the containment to, the environment are routed through the Plant Vent Radiation Monito Sampling for the Plant Vent Radiation Monitor is performed as recommended by ANSI 13.1-1969 11Guide to Sampling Airborne, Radioactive Materials in Nuclear Facilities.
For in plant releases the licensee performs periodic surveys of the containment atmosphere. This data is utilized to perform validation of the sampling technique for the containment atmospher The inspector had no further questions. This item is resolve (Closed) (311/79-21-04):
Remote selection of "Clean Sample" from control roo The licensee has proposed an FSAR change to clarify radiation monitor requirements for Salem Unit 2 containment atmosphere monitoring equipmen The inspector discussed the proposed change with the IE Project Inspector and the NRC licensing Project Manager in a conference call on April 23, 197 The licensee submitted the proposal, dated April 11, 1979, for NRC revie No items of noncompliance were identifie.
Exit Interview The inspector met with licensee representatives as denoted in Details, paragraph 1 of this report, at the concJusion of this inspection on April 4, 197 The inspector sununarized the scope and findings of this inspectio ~