IE Insp Rept 50-311/79-15 on 790222.No Noncompliance Noted. Major Areas Inspected:Preoperational Fuel Receipt & Storage Practices,Procedures & Records
ML18079A344
Person / Time
Site: Salem PSEG icon.png
Issue date: 03/28/1979
From: Joyner J, Galen Smith
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML18079A343 List:
References
50-311-79-15, NUDOCS 7906010041
Download: ML18079A344 (3)


Text

U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT Report No. * * 50.,.311/79-15 Docket N * 50.,.311 Region I

,

License. No. CPPR-53 Safi~guards*~ Group IV Priority ------

  • Category _ _.::;.B ____ _

Licensee:

Public Service Electric and Gas Company 80 Park.Place Newark, New Jersey Facility Name:

Salem Nuclear Generating Station, Unit 2 *

Inspection at: Hancocks Bridge, New Jersey Inspection co Inspectors:

Approved by:

~

  • oyn er~ 1ef(,?' NUC ear Material Control Support Section, Safeguards Branch Inspection Summary:

'datsigned date* signed date. signe Z:.y-7f date signed Inspection on February.22, 1979 (Report Na.* 50.,.311/79-*15)

Areas Inspected: Routine unannounced inspection by a regional based inspector of nuclear material control and accounting; including. preoperational fuel receipt and storage practices, procedures and record The inspectio involved five in.spector-hours.'onsite by one regional* based inspector *. *

Results:

No items of noncompliance.*were identifie Region l Form 12 *

(Rev. April 77)

'l9060106'f/ :*=*

DETAILS Persons Contacted *H. Midura, Station Manager, E. Roscioli, Senior Reactor Staff Supervisor W. Schell, Engineer

,

W. O'Brien, Enaineer J. Nichols, Reactor Engineer R. Silverio, Assistant to the Manager

  • J. Stillman, Station Quality Assurance Engineer
  • W., Kille, Resident Quality Assurance Engineer
  • L. Norrholm, NRC Resident Inspector
  • denotes those present at the exit intervie License Reauirements The inspector reviewed the licensee's compliance with possession limits and conditions of License No. SNM-1831 and the licensee's Application for Licens All fuel for the initial loading of Salem Nuclear Generating Station Unit 2 has been received onsite and the total quantity of U-235 is within the possession limits specified in License No. SNM-183 During the inspection the, inspector also verified that all fuel assemblies were stored in storage racks which provide minimum center-to-center and edge-to-edge spacings of 21 11 and 12.5",

respectively, in accordance with the licensee's Application for License.,

No items of noncompliance were identifie.

Environmental Protection The inspector observed that new fuel assemblies are currently being stored in the spent fuel pit. This storage area provides for protection from debris, excessive dust and physical damag The spent fuel pit also provides security for the fuel since access to the area is controlled by a security guard stationed at the only access doo No items of noncompliance were identifie *

3 Verification of Documentation/Records The licensee has established and is maintaining procedures for the receipt and verification of SN The licensee is reviewing and completing Forms NRC-741 in accordance with the printed instruction Additionally, it was noted that most of the licensee 1s material control and accounting procedures for Unit 1 have been revised and put into use for Unit No items of noncompliance were identifie. * Exit Interview The inspector met with licensee personnel (denoted in paragraph 1)

at the conclusion of the inspection and reviewed the scope of the inspection and the findings *