e Report No. 50-281/79-55 UNITED STATES NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTA ST., N.W., SUITE 3100 ATLANTA, GEORGIA 30303 Licensee: Virginia Electric and Power Company

-

Richmond, Virginia 23261 Facility Name:

Surry Power Station Unit No. 2 License No. DPR-27 Docket No. 50-281 Inspectio Inspecto SUMMARY Inspection on June 26-29, 1979 Areas Inspected Date Signed n?Ma This routine, unannounced inspection involved 24 inspector-hours on site in the areas of construction status, engineering task assignment (ETA) review, licensee action on previous inspection findings, calibrated tool control, and nonconformance report revie Results Of the areas inspected, no apparent items of noncompliance or deviations were identifie e DETAILS Persons Contacted Licensee Employees

  • G. E. Kane, Operating Supervisor
  • J. W. Patrick, Mechanical Supervisor
  • P. P. Nottingham, III, Assistant Health Physics Supervisor (SGRP)
  • F. L. Rent, Resident QC Engineer
  • J. Goodson, QC Engineer (SGRP)
  • E. P. Dewandel, Staff Assistant
  • C. W. Rhodes, Resident Engineer, Construction (SGRP)

A. L. Parrish, III, SGRP Project Manager D. Driscoll, QC, VEPCO Other licensee employees contacted included 5 construction craftsmen, 2 tech-nicians, 2 security force members, and 6 office personne Other Organizations Daniel Construction Company (Daniel)

Goth Lowe, Piping NRC Resident Inspector D. K. Burke

  • Attended exit interview Exit interview The inspection scope and findings were discussed on June 29, 1979, with those persons indicated in Paragraph 1 abov.

Licensee Action on Previous Inspection Findings (Closed) Unresolved Item (50-281/79-18-01) Calibration of gages for S. lower assembly purg The vendor installed pressure gages used for moni-toring the S. G. lower assembly nitrogen purge were removed and tested to ensure that these gages were reading correctly. The test proved that the gages were accurate. Immediately after the removal of the vendor installed gages, new calibrated gages were installed on the S. G. lower assemblie No further action is require.

Unresolved Items Unresolved items were not identified during this inspectio e

-

-2-Independent Inspection Effort Construction Status The 'A', 'B' and 'C' cubicle upper shells internals are being refur-bished. The 'B' cubicle steam generator girth weld is in final prepara-

- tion stage Numerous portions of the reactor coolant piping are being installed. Preparation for inverting and fit-up of 'B' cubicle upper shell is in progres Engineering Task Assignments (ETA)

The inspector examined the following VEPCO ETAs for sign-offs, dates, incorporation of field changes, content of field changes, documentation and procedure completeness:

  • ETA/I Procedure fl 30001 Entirety 30007 P-1-U2A P-l-U2B P-1-U2C 30019 Entirety Latest Field Change FC/11 FC/13 FC/12 Title (ETA)

Removal of Steam Generator Insulation Cutting & Removal of Feedwater Piping Cutting of Crane Wall at Hatch Opening No items of noncompliance or deviation were identified in the area inspecte Nonconformance Reports (NCR)

The inspector examined the following VEPCO nonconformance reports for completeness, description noted, corrective action/disposition assigned, corrective action taken and disposition completed:

Report fl SGRP-79-21 SGRP-79-33 SGRP-79-69 SGRP-79-70 Description 3000' 3/4" wire whip (coil)

Upper Manway Cover Bolthole S. G. -

Lower Unit-#2972 Fittings Fittings

  • II

-

SGRP-79-77 SGRP-79-98-3-585' Pipe Feedwater Bridge - Primary Moisture Separator Equipment No items of noncompliance or deviations were identified in the area

- inspecte Calibrated Tool Control The inspector reviewed the calibration records and certification of calibration for the following designated tool Tool Identification Number PSE 1287 PSE 1244 PSE 1212 thru 1223 Description Inside-Outside Calipers Torque Wrench 0-2000FT-lbs Micrometers (Various 0"-12")

No items of noncompliance or deviation were identified in the area inspecte Observation of Safety-Related Work Activities The following safety-related work was observed:

1)

Steam generator girth weld preparation; 'B' Cubicle - ETA 40006 2)

Installation of RC Pipe EP-4, 'B' Cubicle ETA 40004 3)

Pipe refurbishment EP-5, 'B' Cubicle (in pipe refurbishment building) - ETA 40004 No items of noncompliance or deviations were identified in the areas inspecte } '