Report No. 50-281/79-53 UNITED STATES NUCLEAR REGULATORY COMMISSION
REGION II
101 MARIETTA ST., N.W., SUITE 3100 ATLANTA, GEORGIA 30303 Licensee: Virginia Electric and Power Company Richmond, Virginia 23261 Facility Name: Surry Power Station Unit 2 Docket No. 50-281 License No. DPR-37 SUMMARY
~ ~ Inspection on June 19-22, 1979 Areas Inspected:
Date Signed zlt~/19 Date 'Signed This routine, unannounced inspection involved 20 inspector hours onsite by one Region I inspector to inspect the activities related to the steam generator replacement progra Observations were made of radiography in progress, radiograph film was reviewed, and the procedure program was reviewe Results Of the areas inspected, no items of noncompliance or deviations were identifie ;;)...71
_J
. __ DETAILS Persons Contacted Licensee Employees
- W. L. Stewart, Station Manager
- A. L. Parrish, II, Project Manager
- C. W. Rhodes, REsident Engineer
- J.B. Goodson, QC Engineer
- W.R. Skelley, Jr., Staff Assistant Other Organizations Daniel Construction Company T. Lawson, QC Manager R. Davis, Welding Supervisor S. Slater, Welding Inspe~tor Chicago Bridge and Iron Company J. Edgar, QC Manager
- Attended exit int~rvie.
Exit Interview The inspection scope and findings were summarized on June 22,1979 with those persons in Paragraph 1 abov.
Licensee Action on Previous Inspection Findings Not inspecte.
Unresolved Items Unresolved items were not identified during this inspectio.
Independent Inspection Effort General A general inspection was made inside the primary containment to inspect the activities and work in progress related to the installation of the replacement tube bundle sections and the modifications to the secondary side of the original steam generators. Observations were made of the setting of the "A" generator tube bundle section into the support ring forgings and the initial 3/8" of weld in the girth weld which joins the primary pipe EP-4 to the cold leg nozzle of the "B" generato Observations were also made of the radiography in progress to *
-2-examine the first 3/8 of weld metal in the weld groov The inspector noted that this was the first production weld in the primary coolant piping which was performed using the diametric automatic cold wire tig equipment. It was also noted that the replacement feedwater nozzle sections were completed on all three generators with the exception of the final post weld heat treat (PWIIT) and subsequent xra The PWHT will be performed when the final shell girth weld is made and the stress relieve As of this inspection, none of the girth welds had been fit u No items of noncompliance were identifie Primary Nozzle Welding and Radiography -
An inspection was made of the radiography in progress to examine the first 3/8" of weld metal in the root of the weld joining the EP-4 nozzle to the cold leg side of the "B" steam generato The radiography was performed to the requirements of a licensee approved procedure, RT-A-G-77VS rev. O, which complies with ASME Section III and V, 1974 edition through the winter Addenda of 197 The inspector observed the film placement, radiation source, radiation boundaries, and exposure activitie A visual inspection was made of the weld metal to evaluate weld bead characteristics for cohesion between beads, por<rsity, undercut_s, weld bead roll over or defect indication A visual inspection was made inside the primary head to examine the internal condition of the EB insert weld ring relative to the pull or fused condition of the initial weld layer depositio The inspector noted the presence of QC personnel, licensee surveillance, material and tool control and the general house-keeping of the work are No items of noncompliance were identifie Feedwater Nozzle Radiography An inspection was made of the radiographs for the feedwater nozzles on the "A", "B", and "C" steam generator The nozzles were modified by the replacement of a major part of the nozzle section and incorporating a redesign of the thermal sleeve assembl The radiography was performed and evaluated to the requirements of CBI-RT-9X Rev. 1 which was reviewed for compli-ance to the requirements of ASME Section III and V of the 1974 edition through winter 1976 Addend The inspector noted that*
the radiography was performed with 96 curies of Cobalt 60 through a weld metal thickness of 4.75 inches using Kodak AA film with lead screens in front and bac The film was examined for radiographic quality and to the requirements of the referenced code and the approved procedures for the presence of mechanical, chemical or other blemish~s such as fogging, process marks;:
,r,
~ *
- )
_/'
-3-scratches, finger marks or artifacts that could mask unacceptable defect The film was also examined for the placement location of the designated penetrameters #45 and the 2T hole outline definition of the penetramete The film was also inspected for proper sequential and contractual identificatio The inspector noted that the film was reviewed and approved by the contractor's quality control manager who is qualified to SNT-TE-lA level II, the licensee representative who is qualified to SNT-TE-lA level III, and the authorized inspector (AI).
The inspector was informed that the radiography would be performed again after final post weld heat trea No items of noncompliance were identifie NDE QA Program Requirements An inspection was made of the NDE program technical specifica-tion and referenced documents to determine whether adequate QA plans and procedures have been established (written, reviewed, approved, and issued) to assure that the following activities are controlled and accomplished: Qualification, responsibilities and duties of QA personnel responsible for NDE test activities.
b. _ Indoctrination, training and qualificatio Audit procedures and check list Work and inspection procedure Control of processe Corrective action Examination control which includes acceptance criteria evaluation of result Calibration procedure Record No items of noncompliance were identified.