IE Insp Rept 50-281/79-41 on 790529-0601.No Noncompliance Noted.Major Areas Inspected:Steam Generator Replacement, Welding & Associated Activities & Nondestructive Examinations
ML18130A484
Person / Time
Site: Surry Dominion icon.png
Issue date: 06/26/1979
From: Herdt A, Kleinsorge W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML18130A483 List:
References
50-281-79-41, NUDOCS 7908240151
Download: ML18130A484 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTA ST., N.W., SUITE 3100 ATLANTA, GEORGIA 30303 Report No. 50-281/79-41 Licensee:

Virginia Electric and Power Company Richmond, Virginia 23261 Facility Name:

Surry Unit 2 Docket N License N DPR-37 Inspection at Surry ( ~-----;r; Virginia App roved ~.=

i ion Chief, RCES Branch SUMMARY Inspection on May 29 - June 1, 1979 Areas Inspected This routine/unannounced inspection involved 27 inspector-hours onsite in the areas of steam generator replacement, observation of welding and associated activities as well as nondestructive examination Results Of the two areas inspected, no apparent items of noncompliance or deviations were identified.

  • Persons Contacted Licensee Employees DETAILS W. L. Stewart, Station Manager
  • A. L. Parrish, III, Project Manager SGRP
  • J. B. Goodson, Resident QC Engineer
  • C. W. Rhodes, Resident Engineer for Construction W. L. Byrd, Supervisor Welding Construction C. W. Embler, Staff Engineer Welding D. T. Meeks, QA Staff Other licensee employees contacted included four construction craftsmen, five technicians, two mechanics and five office personne Other Organizations Daniels Construction Company (DCC)

J. Latimer, Project Welding Engineer Chicago Bridge and Iron (CB&I)

J. Edgar, Welding and QA Superintendent NRC Resident Inspector D. J. Burke

  • Attended exit interview Exit Interview The inspection scope and findings were summarized on June 1, 1979 with those persons indicated in Paragraph 1 abov.

Licensee Action on Previous Inspection Findings Not inspecte.

Unresolved Items Unresolved items were not identified during this inspectio.

Independent Inspection Effort The inspector conducted a general inspection of Unit 2 Containment, Auxiliary building, refurbishment building and the CB&I mock-up training

-2-area to observe construction progress and construction activities such as weld joint preparation, welder training, radiation control, movement of new steam generator lower shell into the containment, material handling and control, housekeeping and storag No items of noncompliance or deviations were identifie.

Steam Generator Replacement Observation of Welding and Associated Activities The applicable code as required by "VEPCOs licensee submittal (Steam Generator Project Surry Power Station Unit Nos. 1 and 2, Revision 9)," is ASME Section XI, 1974 Edition with Addenda through the Winter of 197 Based on paragraph IWA-7000 of Section XI, VEPCO is using the original construction code (USAS B31.1.0-1967) for pipe weldin Welder quali-fications and procedure qualifications are being performed in accordance with the latest edition and addenda of ASME section IX in effect at the time of the qualificatio All welding materials were purchased and certified in accordance with Class I requirements of the ASME cod Nondestructive testing is being performed in accordance with ASME code Section III and V, 1974 Edition with Addenda through the Winter of 197 Welder Qualification (1)

The inspector reviewed CB&I Welder qualification certification documentation including radiographs to determine whether welding personnel (manual or automatic equipment) are qualified in accordance with the applicable code requirements as implemented by the CB&I "Nuclear Quality Assurance Manual for ASME Section III Products".

(2)

The inspector reviewed DCC welder qualification certificates and non-destructive test reports to determine whether welding personnel were qualified in accordance with the applicable code requirements as implemented by DCC WP 501 Revision 2 "Qualifica-tion of Welding Procedures and Welders". Welding Identification Identification numbers from the feedwater and lbw level indicator nozzles on steam generator "B" were traced back to weld maps and nondestructive test reports to determine whether these numbers appeared on CB&I weld maps and whether the information was accurate and retrievabl Control of Welding Filler Materials (1)

The inspector observed activities in CB&! electrode issue station in the containment to determine whether conformance with the applicable code and procedural requirements were being implemented in the areas of storage, dispensing, return and disposition of welding electrodes, flux and other material *

(2)

-3-The inspector observed activities in DCC electrode issue stations in the containment and the refurbishment building to determine whether suitable facilities and controls were in place and maintained for storage, dispensing, return and disposition at welding electrodes, flux and other materials, in conformance with the applicable code and procedural requirement Observation of Welding The inspector observed in process weld build-up of weld No 2 on ISO ETA 40004 U2A-EP3 at cut No. 30005-5-U2A EP3; verified that the applicable DCC weld procedure specification was available to the welder and that QC hold points were indicate In addition, the inspector verified that slag removal was performed between layers on machine fabricated weld Repair of Welds The inspector reviewed the below listed documents to determine the adequacy of procedures for the identification and resolution of defects disclosed by NDE methods and implementation weld repai (1)

CB&I (a)

"Nuclear Quality Assurance Manual for ASME Section III Products" (b)

GRIN Revision O "General Repair Procedure for Materials and Welds" (2)

DCC DCC WP 503 "Repair of Defects in Components" No items of noncompliance or deviations were identifie.

Nondestructive Examinations, Steam Generator Replacement For the applicable codes see paragraph 6 abov The inspector reviewed the documents listed below relative to non-destructive examination to determine whether these documents reflect proper review and approval, are appropriate and meaningful, and are adequately referenced, consistent with NRC requirements and VEPCO's Licensee submittal (1)

CB&I Nondestructive Examination Procedures (a)

MT 10, Revision 2 "Magnetic Particle Examination Procedure, Continuous Prod, Dry, Visable Particle".

-4-(b)

MT 11, Revision 2 "Magnetic Partical Examination Procedure, continuous Yoke, Dry, Visable Particle" (c)

PT 9X, Revision 2 Liquid Penetrant Examination Procedure, Color Contrast, Water Washable, Dry Developer" (d)

PT 22 Revision 1 "Liquid Penetrant Examination Procedure High Temperature, Color Contrast Wet Developer" (e)

RT 1, Revision 3 "Radiographic Examination Procedure" (f)

RT 9X, Revision 1 "Radiographic Examination Procedure for thick Pipe Walls" (g)

UT lX Revision 3 "Ultrasonic Examination Procedure for Low Alloy Welds (2)

DCC Nondestructive Examination Procedures (a)

MT-A-0-77VS Revision O "Magnetic Particle Examination of Weldmets" (b)

MT-0-0-79VS, Revision O "Magnetic Particle Examination" (c)

RT-A-2-77VS, Revision O "Radiographic Examination of Weldmets" (d)

RT-A-G-77VS Revision O "Radiography Requirements for X-Ray and Gamma Ray Examination of Weldmets" (e)

RT-A-SP-77, Revision O "Special Procedure For Radiography" (f) PT-A-0-77VS Revision O "Liquid Penetrant Examination of Weldmets" (g)

UT-A-0-77VS Revision O "Ultrasonic Examination of Weldmets and Thickness Measurements of Pipe and Plate -ASME Code" (3)

VEPCO Engineering Task Assignments:

30016, 40008, and 40009 The inspector reviewed qualification and certification documen-tation for two CB&I Level II examiners, nine DCC Level II and two DCC Level III examiners to deterine whether they were qualified in accourdance with the applicable code requirements as implemented by the below listed document (a)

CB&I "Nondestructive Examination Personnel Training Qualifi-cation and Certification Program" Issue 5

-5-(b)

DCC PQ SN O 75 Revision 1, "Certification of NDE Personnel" No items of noncompliance or deviations were identified.