UNITED STATES NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTA STREET, ATLANTA, GEORGIA 30303 Report Nos. 50-281/79-17 Licensee: Virginia Electric and Power Company Richmond, Virginia 23261 Facility Name: Surry Power Station Docket Nos. 50-281 License Nos. DPR-37 Inspection-:1S~~ Site near Williamsburg, Virginia Inspector(_QC,0c.C7¥D

  • ~WJZ'

3J1 Approved by: Wl.:k:'J.'7r)/'

A. R. Herdt, Section Chief, RCES Branch SUMMARY Inspection on March 13-16, 1979 Areas Inspected This routine unannounced inspected involved 24 inspector-hours onsite in the areas of construction status, QA Audits, licensee action on previous inspec-

~ion findings and observation of safety-related work activitie Results Of the four areas inspected, no apparent items of noncompliance or deviations were identifie tf tJ1

DETAILS Persons Contacted Licensee Employees

  • W. L. Stewart, Station Manager
  • J. L. Wilson, Superintendent Operation
  • R. M. Smith, Supervisor Health Physics
  • F. L. Rentz, Resident Q. C. Engineer
  • A. L. Parrish, III, SGRP Project Manager
  • C. W. Rhodes, SGRP Resident Engineer Construction
  • J. B. Goodson, SGRP Resident QC Engineer
  • E. P. Dewandel, Staff Assistant
  • T. J. Kenny, Outage Coordinator
  • Y. P. Mangum, Jr., SGRP Resident Engineer Project Constrol
  • E. J. Rivas, SGRP Resident Engineer Construction outside Containment
  • J. Sarver, VEPCO Health Physics Other licensee employees contacted included 6 construction craftsmen, 2 technicians, 1 security force member, and 5 office personne Other Organizations Daniels Construction Company (Daniels)

J. P. Bridges, Superintendent - Civil NRC Resident Inspector

  • D. J. Burke
  • Attended exit Intervie.

Exit Interview The inspection scope and findings were summarized on March 16, 1979, with those persons indicated in Paragraph 1 abov The inspector summarized the scope of the inspection as follows:

construction status, review of licensee action on previous inspection findings, QA audit review, and observation of safety-related work activities. No items of noncompliance or deviations were identifie *

-2-Licensee Action on Previous Inspection Findings (Open) Deviation 281/79-08-01, Failure To Implement Fire Protection Commitments in Document Entitled S. G. R. P. For Surry Units 1 and An inspection was made of the Unit 2 containment area to determine implementation of the fire protective features for this are It was determined from observation of the containment area and conversation with VEPCO supervising personnel that the following fire protection and related emergency systems temporary measures have been augmented: Provisions for additional fire hose and relative equipment at two hose stations opposite containment and/or entrances of containmen Provisions for fire extinguishers throughout containment and provisions for additional extinguishers in areas of welding and flame cuttin Provisions for additional emergency lighting at equipment and steam generator cubicle hatch This item shall remain open until complete implementation of the fire protective features for the Steam Generator Replacement Projec Unresolved Items Unresolved items were not identified during this inspectio.

Independent Inspection Effort Construction Status The Reactor Coolant (RC) piping is being cut at the "C" Steam Generator of the Unit 2 Reactor Buildin Installation of Monorail Transport System and Jib crane were being accomplishe The crane wall was being modified to facilitate movement of the Steam Generator lower assemblie The installation of the transportation system was also in progres Quality Assurance (QA) Audits The inspector examined the following QA audit conducted by the site QA unit for completeness and deficiencies found:

(note:

the corrective action and responses to this audit have not been accomplished at this present time):

"

-3-Audit Number Subject SGRP 79-2 Fire Protection The audit reviewed was found to be conducted and documented in a thorough, timely and objective manne No items of noncompliance or deviation were identified in the above area inspecte Observation of Safety-Related Work Activities The following safety-related work was observed by the inspector during the course of the inspection:

(1)

Modification of Crane wall (Engineering Task Assignment (ETA) 30019)

(2)

Cutting RC Pipe - "C" Cubicle (ETA 30005)

No items of noncompliance or deviations were identified in the above areas inspected.