UNITED ST A TES NUCLEAR REGULATORY COMMISSION
REGION II
101 MARIETTA STREET, ATLANTA, GEORGIA 30303 Report N /79-11 Licensee:
Virginia Electric and Power Company P. 0. Box 26666 Richmond, Virginia 23261 Facility Name:
Surry Power Station Unit 2 Docket N License N DPR-37 Inspection at,Jiurry Site near*Williamsburg, Virginia Inspecto17: Jf (kdf rn J. D.)1-Y'J~J: J Approved by: U/[/'{(1£/t A. R. Herdt, Section Chief, RC&ES Branch SUMMARY Inspection on February 13-16, 1979 Areas Inspected Bati?signed 3,1y/7)
Date Signed This routine unannounced inspection involved 27 inspector-hours onsite in the areas of Steam Generator Replacement for Surry Power Station Unit Results Of the areas inspected, no apparent items of noncompliance or deviations were identifie 'l905070ll3,_
-*-~,
.,
DETAILS Persons Contacted Licensee Employees
- W. L. Stewart, Station Manager
- R. L. Baldwin, Supervisor, Administrative Services
- F. L. Rentz, Resident QC Engineer
- J. W. Martin, Jr., Supervisor, Quality Assurance
- R. M. Smith, H.P. Supervisor
- P. P. Nottingham, Assistant H.P. Supervisor
- T. J. Kenny, Outage Coordinator
- W. W. Cameron, System Superintendent Technical Services
- J. Pickworth, Senior Engineer Technician, QC
- E. Reiland, Engineering Technician
- E. P. DeWandel, Staff Assistant
- R. F. Saunders, Superintendent, Maintenance
- J. L. Wilson, Superintendent, Operations
- A. L. Parrish, SGRP Manager
- M. Terrier, System Fire Protection Engineer
- Y. P. Mangum, Jr. Resident Engineer, Project Control
- T. J. Hronec, Safety/Security Coordinator
- C. W. Rhodes, Resident Engineering Construction
- J. Bolin, Engineering Technician
- B. R. Sylvia, Director, Nuclear Operations
- J. Goodson, SGRP QC Supervisor Other licensee employees contacted included two construction craftsmen, two technicians, two security force members, and four office personne Other Organizations
- M. Randolph, Stone and Webster Engineering Corporation (S&W)
- D. J. Burke, NRC Resident Inspector
- Attended exit intervie.
Exit Interview The inspection scope and findings were summarized on February 16, 1979, with those persons indicated in Paragraph 1 above in the areas of steam generator replacemen The licensee was advised that no apparent items of noncompliance were identified during this inspectio ti
' * Licensee Action on Previous Inspection Findings Not inspecte.
Unresolved Items Unresolved items were not identified during this inspectio Independent Inspection The inspector reviewed VEPCO' s Status Report pertaining to the Steam Generator Replacement Project schedul In conjunction with this review, the inspector attended a portion of VEPCO' s Plan-of-the-Day which coordinates the construction efforts being performed on Unit The inspector conducted an inspection of the site which included the following areas:
warehouse facilities (Category A&B warehousing and receiving area); Unit 2 containment with emphasis on areas to be affected by the Steam Generator Replacement project; and support activities and their facilitie In addition, the inspector assisted with the fire protection/prevention inspection at all areas toured. A review was performed on the available Engineering Task Assignments (ETAs) pertaining to upcoming construction efforts to be performed in the near futur The ETA' s reviewed were as follows:
30005 - "Cutting Reactor Coolant Piping"; 30021 - "Disassembly and Storage of Manipulator Crane"; 30002 -
"Removal of Miscellaneous Piping"; 30018 "Removal of SG Level Inst. -
SG "C", "B", and "A"; and 30019 - "Cutting of Crane Wall at Hatch Opening".
No apparent items of * noncompliance or deviations were noted as a result of this inspectio **-. --. -
,---~.
-***.. ---------.. --~ --- **-
,,
I