IR 05000281/1979011

From kanterella
Jump to navigation Jump to search
IE Insp Rept 50-281/79-11 on 790213-16.No Noncompliance Noted.Major Area Inspected:Steam Generator Replacement
ML18114A521
Person / Time
Site: Surry 
Issue date: 03/14/1979
From: Herdt A, Wilcox J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML18114A519 List:
References
50-281-79-11, NUDOCS 7905070118
Download: ML18114A521 (3)


Text

. '

UNITED ST A TES NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTA STREET, ATLANTA, GEORGIA 30303 Report N /79-11 Licensee:

Virginia Electric and Power Company P. 0. Box 26666 Richmond, Virginia 23261 Facility Name:

Surry Power Station Unit 2 Docket N License N DPR-37 Inspection at,Jiurry Site near*Williamsburg, Virginia Inspecto17: Jf (kdf rn J. D.)1-Y'J~J: J Approved by: U/[/'{(1£/t A. R. Herdt, Section Chief, RC&ES Branch SUMMARY Inspection on February 13-16, 1979 Areas Inspected Bati?signed 3,1y/7)

Date Signed This routine unannounced inspection involved 27 inspector-hours onsite in the areas of Steam Generator Replacement for Surry Power Station Unit Results Of the areas inspected, no apparent items of noncompliance or deviations were identifie 'l905070ll3,_

-*-~,

.,

DETAILS Persons Contacted Licensee Employees

  • W. L. Stewart, Station Manager
  • R. L. Baldwin, Supervisor, Administrative Services
  • F. L. Rentz, Resident QC Engineer
  • J. W. Martin, Jr., Supervisor, Quality Assurance
  • R. M. Smith, H.P. Supervisor
  • P. P. Nottingham, Assistant H.P. Supervisor
  • T. J. Kenny, Outage Coordinator
  • W. W. Cameron, System Superintendent Technical Services
  • J. Pickworth, Senior Engineer Technician, QC
  • E. Reiland, Engineering Technician
  • E. P. DeWandel, Staff Assistant
  • R. F. Saunders, Superintendent, Maintenance
  • J. L. Wilson, Superintendent, Operations
  • A. L. Parrish, SGRP Manager
  • M. Terrier, System Fire Protection Engineer
  • Y. P. Mangum, Jr. Resident Engineer, Project Control
  • T. J. Hronec, Safety/Security Coordinator
  • C. W. Rhodes, Resident Engineering Construction
  • J. Bolin, Engineering Technician
  • B. R. Sylvia, Director, Nuclear Operations
  • J. Goodson, SGRP QC Supervisor Other licensee employees contacted included two construction craftsmen, two technicians, two security force members, and four office personne Other Organizations
  • M. Randolph, Stone and Webster Engineering Corporation (S&W)
  • D. J. Burke, NRC Resident Inspector
  • Attended exit intervie.

Exit Interview The inspection scope and findings were summarized on February 16, 1979, with those persons indicated in Paragraph 1 above in the areas of steam generator replacemen The licensee was advised that no apparent items of noncompliance were identified during this inspectio ti

' * Licensee Action on Previous Inspection Findings Not inspecte.

Unresolved Items Unresolved items were not identified during this inspectio Independent Inspection The inspector reviewed VEPCO' s Status Report pertaining to the Steam Generator Replacement Project schedul In conjunction with this review, the inspector attended a portion of VEPCO' s Plan-of-the-Day which coordinates the construction efforts being performed on Unit The inspector conducted an inspection of the site which included the following areas:

warehouse facilities (Category A&B warehousing and receiving area); Unit 2 containment with emphasis on areas to be affected by the Steam Generator Replacement project; and support activities and their facilitie In addition, the inspector assisted with the fire protection/prevention inspection at all areas toured. A review was performed on the available Engineering Task Assignments (ETAs) pertaining to upcoming construction efforts to be performed in the near futur The ETA' s reviewed were as follows:

30005 - "Cutting Reactor Coolant Piping"; 30021 - "Disassembly and Storage of Manipulator Crane"; 30002 -

"Removal of Miscellaneous Piping"; 30018 "Removal of SG Level Inst. -

SG "C", "B", and "A"; and 30019 - "Cutting of Crane Wall at Hatch Opening".

No apparent items of * noncompliance or deviations were noted as a result of this inspectio **-. --. -


,---~.

-***.. ---------.. --~ --- **-

,,