MATERIAL TRANSMITTED HEREwnl1
'
/ig u, 'g CONTAINWNdOM88ARDS INFORMATION a
!
NUCLEAR REGULATORY COMMISSION o
E REGION 11
101 MARIETTA ST., N.W., SulTE 3100 o
- p[
ATLANTA, GEORGIA 30303 Report Nos.
50-280/81-26, 50-281/81-26 Docket Nos.
50-280, 50-281 License Nos.
OPR-32, D N 37 Licensee:
Virginia Electric and Power Company P. O. Box 26666 Richmond, Virginia 23261 Facility Name: Surry 1 and 2 Inspection at:
Surry Power Station near Surry, Virginia Inspection Conducted:
September 22-26, 1981 Date of Last Dhysical Security Inspection Visit:
July 6-10, 1981 i
Type of Inspection:
Unannounced Physical Security Inspector:
O. mil r
/c - 9 - #/
Aubrey Tillman Physical Security Inspector Date Signed Approved by:
v
_A
_/O - 9 - fl
R. McGuire, Chief, Physical Security Section, Date Signed Technical Inspection Branch, Division of Engineering and Technical Inspection
!
Inspection Summary Areas Inspected:
Included review of Security Plan; Physical Barriers (Protected Area); Physical Barriers (Vital Areas); Access Control (Identification, Authorization and Badging); Access Control (Vital Areas); Communications; Testing and Maintenance; and Power Supply.
The inspection involved 36 inspector hours or, site by one NRC inspector. The inspection was begun during an offshift period; four inspection hours were accomplished during offshift periods.
Results: The licensee was found to be in compliance with NRC requirements within the eight areas examined during the inspection.
gm 8I
- Ifo A Ccpy
of 8 Copics
Paces
~ Ila Docurent is not, to be
-
reproduced.v1.thout specific approval of IE:II
.