._
,
hi!M
NSMITTED HEREWITH
w. . . ~. . ~ .o. m' m , m ,
CONT
,
.
-
--
. _ _ .
OCT 131981
.@4:#
'O
n\\
Virginia Electric and Power Company
Q
i g'
ci~
ATTN: Mr. R. H. Leasburg, Vice President
tE
OCT22 IS8 A C6
b
Nuclear Operations
P. O. Box 26666
% c,g k g
Richmond, VA 23261
%
-
Gentlemen:
8
g
Subject: Report Nos M80/81 hand 50-281/81-26
5
This refers to the routine safeguards inspection conducted by Mr. A. Tillman of
this office on September 22-26, 1981, of activities authorized by NRC Operating
License Nos. DPR-32 and DPR-37 at the Surry facility and to the discussions of
our findings held with Mr. J. L. Wilson, Manager, at the conclusion of the
inspection.
Areas examined during this inspection included your physical security program as
implemented under the provisions of Title 10, Code of Federal Regulations, Part
73, " Physical Protection of Plants and Materials", and the specific requirements
of licens: onditions and your approved Security Plan. Within these areas, the
inspection consisted of selective examinations of procedures and representative
records, interviews with personnel, performance tests, and observations by the
inspector.
Within the scope of this inspection, no violations or deviations were disclosed.
We have examined actions you have taken with regard to previously identified
enforcement matters and unresolved items. The status of these items is discussed
in the enclosed report.
In accordance with Section 2.790(d) of the NRC's " Rules of Practice", Part 2,
Title 10, Code of Federal Regulations, activities involving safeguards and
security measures are exempt from public disclosure; therefore, the enclosed
report with the exception of the cover page, which is an inspection summary, will
not be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
s/
Paul J. Kellogg, Chief
Reactor Projects Branch 2
Division of Resident and
Reactor Project Inspection
Enclosures: (See Page 2)
13 Hi3 R TRA:S'AflTED M6M
8110220411 811o13
CONTMNS 2390's SEGUARDs !:NATI0ll
rJR ADOCK 05000280
Ob
G
$
.
, h TRANSYlTTED HERe,yn
co;;-
-
Virginia Electric and Power Company
EGUARDS INFORA?C0t!
-
OCT 131981
Enclosures:
1.
Inspection Report Nos.
50-280/81-26 and 50-281/81-26
(Exempt From Disclosure)
2.
Inspection Summary
(Not Exempt)
cc w/ encl:
E. Davis, Director Nuclear Security
J. H. Ferguson, Executive
Vice President-Power
J. L. Wil son, Manager
bec w/ Inspection Summary:
Commonwealth of Virginia
bec w/ encl:
Document Management Branch
RII
Fil
nII
RII
RII
g
g/dm'en:ew
.re
AFGibson
KDL b'
PJ
ogg
81h:nski
m-
10 m e1
10,s ,e1
10, ,e1
10 % ,e1
1u ,e1
1,77,e1
e f
e e **
p,Atm1At rat $MITTED HEREYlW
CMTMG 2FM 3;ttetARD3 II: FORMATION