IR 05000280/1981003

From kanterella
Jump to navigation Jump to search
IE Insp Repts 50-280/81-03 & 50-281/81-03 on 810112-16. Noncompliance Noted:Failure to Follow Security Commitments. Details Withheld (Ref 10CFR2.790)
ML18139B225
Person / Time
Site: Surry  
Issue date: 02/13/1981
From: Hill A, Mcguire D, Perny C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML18139B222 List:
References
50-280-81-03, 50-280-81-3, 50-281-81-03, 50-281-81-3, NUDOCS 8104060093
Download: ML18139B225 (2)


Text

-.

MATERIAL TRANSM 1ITTED HERE.WITH CONTAINS 2.790 IMFOR~'lATIO!i U\\ S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT

  • REGION II

_

-- _ FEB-13 198t

'

.

-

  • Report Nos. 50-280/81-03. and 50~281/81-03 -

Docket Nos. 50-280. and 50-281 License Nos. DPR:..32 and DPR-37

.

.

Licensee: Virginia Electric and Power Compan P. 0. Box 26666

  • Richmond, VA 23.261, _

Facility Name:. Surry-1 and 2

  • Inspection* con_ducted~ ~anuary 12~16*, 1981

. Date: of Last, Physical s"ecurfty Inspection Vi-~it: September 28 -* October 2, 1980

.

. ;:

.

\\.

'.

.

...

,.:*

-,_*;~;:.,..... *'

.

  • .

.

  • ..

.

Typ*e of Inspection.:. Vnannounced Physical Security

Inspectors:.. a:~ :6.)/tig (.fo,.);.-,-::: x:,......

_ c*.. D. Perny~.- Physica;l: ~~~~i.ty Inspector *

.. c..* '., *--.

A.O. H1Qsical Securi~y Inspector A~proved-by,:(j);Ze ~....!f?J..!..*!..!*.~~-. ~-==~=------......----......-----

,

D. McGuire,,:Section Chief, Safeguards. Branch Inspectio~ Summary *:; -:*-:.

  • . *,,

...

.

.

.

dl: /13 /a1 Date Signed

  • j}/,3/el Date, Signed z//7/fl iJate' S.i gned Areas Inspected:., Included review of the. security plan, security program audit,_

securfty organizati.on, lighting, alarm stations, assessment aids, records an reports and license~- action _on* previous inspect.ion finding The. inspection involved'.,]8: inspector* hours on site by two NRC* inspector The inspection was begun-during an. offshift period; 21 inspection hours were accomp 1 i shed: during off shi.ft. peri ads...

Results: The licensee was found-to.be in compliance with NRC requirements within the eight areas examined_ during the inspection except for the following two areas~

  • Phy.sical Barriers (V.ital/Protected: Area) -

Certification of the bullet res.istance: of the control room, central alarm station and other security related structures (Unresolved).

  • ... _* J.-.:'

S-F2 3 \\

Copy.,,,.... __ -_of ___

Copies j?

Pages MATERIAl TRANSMITTED HEREWITH

  • COltTAH'!S 2.790 tNFORMATION -

This Document is not to be reproduced wi tholit speaific *

approval of IE:II

.. ::.,,~.

MATERIAL TRANS:MfITED HEREWITH CONTAl'NS 2.79'3 tNFORMATtON Alarm Stations - Failure to follow commitments in the Security.Plan for operation of the security alarm stations (Violation).

-- *-~.. *-:-

MATERfAt TRAMSM!TTED HEREWITH

,oirAIHS 2.790 lNFORMAHO!i

.. ~