UNITED STATES
-CLEAR REGULATORY COMMISSI
REGION II
101 MARIETTA ST., N.W., SUITE 3100 ATLANTA, GEORGIA 30303 Report Nos. 50-280/81-23, 50-281/81-23, 50-338/81-24 and 50-339/81-21 Licensee:
Virginia Electric and Power Company Richmond, VA 23261 Facility Name:
Surry 1 and 2, and North Anna 1 and 2 Docket Nos. 50-280, 50-281, 50-338 and 50-339 License Nos. DPR-32, DPR-37, NPF-4 and NPF-7 E.nforcement Co~f,re'.ce.in Region II office in Atlanta, GA Approved by: 1;t_ C i').~
H. C. Dance, Section Chief Division of Resident & Reactor Project Inspection SUMMARY 2*--Z..- ¥1 Date Signed
- This special announced management meeting was conducted on August 25, 1981, to
discuss the effectiveness of the quality assurance program and other current operational issues identified during recent inspections at Surry and North Anna.
'*0110200358 810904 *,
PDR. ADOCK 05000280 G
,--
e REPORT DETAILS Personnel Attending Meeting Virginia Electric and Power Company (VEPCO)
J. I. Oatts, Senior Vice President, Power Operations R.H. Leasburg, Vice President, Nuclear Operations E. A. Baum, Executive Manager, Quality Assurance J. W. Martin, Manager, Quality Assurance W.R. Cartwright, Station Manager, North Anna J. L. Wilson, Station Manager, Surry F. L. Rentz, Resident QC Engineer, Surry Office of Inspection and Enforcement, Region II James P. O'Reilly, Director R. D. Martin, Deputy Director F. J. Long, Assistant to the Director R. C. Lewis, Director, Division of Resident and Reactor Project Inspection P. J. Kellogg, Chief, Reactor Projects Branch No. 2 H. C. Dance, Chief, Projects Section 2C C. M. Upright, Chief, Management Programs Section G. A. Belisle, Lead QA Inspector P.R. Bemis, QA Inspector P. E. Fredrickson, QA Inspector P. K. Skinner, QA Inspector Meeting Summary The Region II Director and members of his staff met with VEPCO management representatives on August 25, 1981 at the Region II office in Atlanta, G The purpose of this meeting was to discuss management effectiveness of the quality assurance (QA) program and current operational issue The inspection staff summarized the results of three QA inspections conducted during the past twelve months at Surry and North Ann Viola-tions, deviations, unresolved items, and inspector followup items identi-fied during these inspections which indicate unacceptable trends in manage-ment control of the operational QA program were discussed. These adverse trends were characterized by the inspection staff as failure to provide adequate management attention to detail, failure to fully analyze licensee and NRC requirements and failure to communicate between various licensee functional area Concerns regarding personnel training were also dis-cusse VEPCO representatives were responsive to these concerns aTid stated that action had been initiated to improve management control over most of these problem areas.
e
Current operational issues identified in a recent Surry inspection report (50-280/81-22) and other subjects concerning the discipline of operations at North Anna and Surry were brought to management's attentio The candid discussion and exchange of views was beneficial.