IR 05000266/1989017

From kanterella
Jump to navigation Jump to search
Partially Withheld Physical Security Insp Repts 50-266/89-17 & 50-301/89-16 on 890509-12 (Ref 10CFR73.21).Noncompliance Noted Re Access Controls & Protection of Safeguards Info. Major Areas Inspected:Area Barriers & Alarm Stations
ML20244C032
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 05/25/1989
From: Creed J, Madeda T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20244C018 List:
References
50-266-89-17, 50-301-89-16, NUDOCS 8906140100
Download: ML20244C032 (1)


Text

- _ - _ - _ _ _ - _ _ _ - _ _ _ _ - - _ - _

- _ _ ._

- - - _ _ - _ -

!

..

.: -

.-

..

L U.S. NUCLEAR REGULATORY COMMISSION

REGION III

Reports No. 50-266/89017(DRSS); 50-301/89016(DRSS)

Docket Nos. 50-266; 50-301 Licenses No. DPR-24; DPR-27 Licensee: Wisconsin Electric Power Company 231 West _ Michigan Milwaukee, WI 53201 Facility Name: . Point Beach Nuclear Plant, Units 1 and 2 Inspection Conducted: May 9-12, 1989 Date of Previous Security Inspection: April 3 and 4, 1989

. Type of Inspection: Announced Routine Physical Security Inspection

. Inspector: J4*+1 8[2.f[f9 T J.@laAeda

. _

Date-PhysicaT Security Inspector Approved By: C L bevrige1/ri fj/J26/t ? ~

JamesR. Creed,Chipf Date-Safeguards Section Inspection Summary Inspection on May 9-12,1989 (Reports No. 50-266/89017(DRSS);

No. 50-301/89016(DRSS))

Areas Inspected: Management Support; Protected and Vital Area Barriers; Access Control-Personnel, Packages and Vehicles; Alarm Stations and Communications; Power Supply; Testing, Maintenance and Compensatory Measures; Training and Qualifications; and Review of Licensee Actions on Previous Inspection Finding Results: The licensee was found to be in compliance with NRC requirements within the areas examined, except as noted below: Physical Security Program For Power Reactor - Access Control: Failure to adequately search security personnel as require CFR 73.21 Requirements For The Protection of Safeguards Information:

Failure to provide an adequate level of protection for Safeguards Informatio The licensee's site security program is being implemented in an adequate manner. Corporate and plant support is appropriat Enclosure Contains Upon Separation This e,osuotoo 890s26 Page is Decontrolled PDR ADOCKoSOog6 Q

_ _ _ _ = _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ -