IR 05000261/2015406
| ML15287A252 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 10/06/2015 |
| From: | Scott Shaeffer NRC/RGN-III/DRS/EB2 |
| To: | Glover R Duke Energy Corp |
| References | |
| IR 2015406 | |
| Download: ML15287A252 (5) | |
Text
October 6, 2015
SUBJECT:
H.B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2-U.S. NUCLEAR REGULATORY COMMISSION SECURITY TARGET SET INSPECTION REPORT 05000261/2015406
Dear Mr. Glover:
On August 27, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at the H.B. Robinson Steam Electric Plant Unit No. 2, and discussed the results of this inspection with you and other members of your staff. Inspectors documented the results of this inspection in the enclosed inspection report.
The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
The inspectors documented one finding of very low safety significance (Green) in this report.
This finding involved a violation of NRC requirements. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy. If you contest this violation, or the significance of this NCV, you should provide a response within 30 days of the date of this inspection report, with the basis of your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region II; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at H.B.
Robinson Steam Electric Plant Unit No 2. If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the Regional Administrator, Region II; and the NRC Resident Inspector at the Browns Ferry Nuclear Plant.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and security-related information is necessary to provide an acceptable response, please mark your entire response Security-Related InformationWithhold from Public Disclosure under 10 CFR 2.390, in accordance with10 CFR 2.390(d)(1), and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
Sincerely,
/RA/
Scott M. Shaeffer, Chief Engineering Branch 2 Division of Reactor Safety
Docket No.: 50-261 License No.: NPF-23
Nonpublic Enclosure:
Inspection Report No. 05000261/2015406 w/ Attachment: Supplementary Information (Official Use Only - Security Related Information)
cc: (See page 3)
___ ________________
SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS RII: DRP RII:DRS RII:
RII:
RII:
SIGNATURE JJP3
- SMS GTH1 SMS
NAME PATEL SHAEFFER HOPPER SHAEFFER
DATE 9/28/2015 9/28/2015 9/28/2015 10/6/2015
/2015
/ /2015
/ /2015 E-MAIL COPY?
YES NO YES NO YES NO YES NO YES NO YES NO YES NO cc:
Christopher Isgett, Director Nuclear Plant Security H.B. Robinson Steam Electric Plant 3581 West Entrance Road, RNPA02 Hartsville, South Carolina 29550
Edward T. ONeil, GM Nuclear Protective Services Duke Energy Corporation 526 South Church Street, Phase II, EC5ZD Charlotte, NC 28202 Letter to Richard Michael Glover from Scott M Shaeffer dated October 6, 2015
SUBJECT:
H.B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2-U.S. NUCLEAR REGULATORY COMMISSION SECURITY TARGET SET INSPECTION REPORT 05000261/2015406
Distribution:
M. Layton, NSIR (hard copy w/ encl)
G. West Jr., NSIR (hard copy w/ encl)
E. Wharton, NSIR (hard copy w/encl)
N. Simonian, NSIR (hard copy w/encl)
N. Coleman, OE (hard copy w/encl)
RIDSNRRDIRS
Distribution w/o Encl:
PUBLIC