IR 05000261/2015404; H.B. Robinson Steam Electric Plant - Nuclear Regulatory Commission Material Control and Accounting Inspection Report
ML15300A343
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 10/27/2015
From: Hopper G
NRC/RGN-II/DRP/RPB4
To: Isgett C
Duke Energy Progress
Betty Hitchuk
References
IR 2015404
Download: ML15300A343 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION ber 27, 2015

SUBJECT:

H.B. ROBINSON STEAM ELECTRIC PLANT - NUCLEAR REGULATORY COMMISSION MATERIAL CONTROL AND ACCOUNTING INSPECTION REPORT 05000261/2015404

Dear Mr. Isgett:

On September 30, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed a material control and accounting inspection at your H. B. Robinson Steam Electric Plant, Unit 2. The enclosed inspection report documents the inspection results, which were discussed on October 15, 2015, with Mr. Glover and other members of your staff.

NRC inspectors documented one Severity Level IV violation under the traditional enforcement process. Further, inspectors documented a licensee-identified violation which was determined to be of very low safety significance in this report. The NRC is treating these violations as non-cited violations consistent with Section 2.3.2.a of the Enforcement Policy.

If you contest the violation or significance of the NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region II, the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at H. B. Robinson Steam Electric Plant, Unit 2.

In accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

However, the material enclosed herein contains Security-Related Information in accordance with 10 CFR 2.390(d)(1), and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the Enclosure will not be made available electronically for public inspection in the NRC Public Document Room, or from the PARS component of NRCs ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information - Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1), and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Sincerely,

/RA/

George T. Hopper, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket No.: 50-261 License No.: DPR-23 Enclosure:

NRC MC&A IR 05000261/2015404 w/Attachment: Supplementary Information (Official Use Only - Security Related Information)

cc: (See page 3) ML15300A343 SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP RII:DRP SIGNATURE KME CBS JSD GTH NAME K. Ellis C. Scott J. Dodson G. Hopper DATE 10/26/2015 10/21/2015 10/8/2015 10/21/2015 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO cc:

Edward T. ONeil, GM Nuclear Protective Services Duke Energy Corporation 526 South Church Street, Phase II, EC5ZD Charlotte, NC 28202 Letter to Christopher Isgett from George T. Hopper dated October 27, 2015.

SUBJECT: H.B. ROBINSON STEAM ELECTRIC PLANT - NUCLEAR REGULATORY COMMISSION MATERIAL CONTROL AND ACCOUNTING INSPECTION REPORT 05000261/2015404 DISTRIBUTION: