_tj REG, UNITED STATES NUCLEAR REGULATORY COMMISSION REGION Il 101 MARIETTA STREET, N.W., SUITE 2900 ATLANTA, GEORGIA 30323-0199 Report No.:
50-261/94-21 Licensee:
Carolina Power and Light Company P. 0. Box 1551 Raleigh, NC, 27602 Docket No.:
50-261 License No.:
DPR-23 Facility Name:
H. B. Robinson Inspection Conducted: August 15-19, 1994 Inspectors:
?
/
£.~
B. R. Crowley Dat6 Signed Approved by:
Blake, Chief Date Signed a erials and Processes Section E ineering Branch Division of Reactor Safety SUMMARY Scope:
This routine, announced inspection was conducted on site in the areas of:
(1) Inservice Inspection (ISI), (2) Nuclear Welding, (3) Flow Accelerated Corrosion (FAC), and (4) review of corrective actions for previous inspection finding Results:
In the areas inspected, one violation - failure to sign off VT hold points Paragraph 3.b - was identified. No deviations were identifie Significant improvements had been made in the welding program, particularly in the areas of welder qualification controls and welding material controls. It appeared that the Plant Welding Engineer was intimately involved in all aspects of the welding program and instrumental in improving the progra The FAC program continues to improve and is considered to be a strengt RO 15 Inspection Report, dated July 15, 1994, is an excellent presentation of FAC inspection results for the last outage. The report concisely presents the Ofindings of the inspection and provides predictions for future pipe wear and the need for future inspections and pipe replacement PDR ADOCK 05000261 G