HBL-90-038, Forwards Decommissioning Financial Assurance Certification Rept,Per 10CFR50.75
From kanterella
(Redirected from HBL-90-038)
Jump to navigation
Jump to search
ML20055J365 | |
Person / Time | |
---|---|
Site: | Humboldt Bay |
Issue date: | 07/24/1990 |
From: | Shiffer J PACIFIC GAS & ELECTRIC CO. |
To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
References | |
HBL-90-038, HBL-90-38, NUDOCS 9008020153 | |
Download: ML20055J365 (163) | |
Similar Documents at Humboldt Bay | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20212J7481999-09-29029 September 1999
[Table view]Forwards Insp Rept 50-133/99-02 on 990915.No Violations Noted.Areas Examined During Insp Included Portions of Physical Security Program HBL-99-011, Forwards 10CFR50.59 Annual Rept of Changes,Tests & Experiments for 980101-981231, for Humboldt Bay Power Plant,Unit 31999-08-27027 August 1999 Forwards 10CFR50.59 Annual Rept of Changes,Tests & Experiments for 980101-981231, for Humboldt Bay Power Plant,Unit 3 HBL-99-014, Forwards Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates,1999-07-23023 July 1999 Forwards Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates, ML20209D9981999-07-0808 July 1999 Ack Receipt of Which Transmitted Rev 9 to Physical Security Plan for Humboldt Bay Power Plant,Under Provisions of 10CFR50.54(p).Changes Do Not Decrease Plan Effectiveness,So NRC Approval Is Not Required HBL-99-012, Forwards Rept of Rev 29 to Hbpp Emergency Plan,Effective 990610.Changes in Rev Do Not Decrease Effectiveness of Plan, Per 10CFR50.54(q).Plan Has Been Distributed to Region IV & Is Not Included as Part of Submittal1999-07-0707 July 1999 Forwards Rept of Rev 29 to Hbpp Emergency Plan,Effective 990610.Changes in Rev Do Not Decrease Effectiveness of Plan, Per 10CFR50.54(q).Plan Has Been Distributed to Region IV & Is Not Included as Part of Submittal ML18107A7011999-06-25025 June 1999 Requests Rev of NRC Records to Reflect Change of PG&E Address ML20207E7301999-05-27027 May 1999 Discusses Reorganization of Nrr,Effective 990328 & Forwards Organizational Chart HBL-99-008, Forwards Annual Rept of Occupational Radiation Exposure for 1998. Radiation Exposure Rept Provided on Encl Diskette in Electronic Format of Reg Guide 8.7.Without Encl1999-04-30030 April 1999 Forwards Annual Rept of Occupational Radiation Exposure for 1998. Radiation Exposure Rept Provided on Encl Diskette in Electronic Format of Reg Guide 8.7.Without Encl ML20205L9951999-04-0808 April 1999 Forwards Insp Rept 50-133/99-01 on 990222-25 & 0308.No Violations Identified HBL-99-006, Forwards Annual Radioactive Effluent Release Rept, Covering Period Jan-Dec 1998.Encl 2 Contains Revs 1 & 2 to Safstor ODCM as Required by Specification Section 4.2 of Safstor Offsite Dose Calculation Manual1999-03-31031 March 1999 Forwards Annual Radioactive Effluent Release Rept, Covering Period Jan-Dec 1998.Encl 2 Contains Revs 1 & 2 to Safstor ODCM as Required by Specification Section 4.2 of Safstor Offsite Dose Calculation Manual DCL-99-038, Forwards Decommissioning Funding Repts for Diablo Canyon Power Plant,Units 1 & 2 & Humboldt Bay Power Plant,Unit 3, Per Requirements of 10CFR50.75(f)1999-03-31031 March 1999 Forwards Decommissioning Funding Repts for Diablo Canyon Power Plant,Units 1 & 2 & Humboldt Bay Power Plant,Unit 3, Per Requirements of 10CFR50.75(f) HBL-99-003, Forwards Annual Facility Status & Survey Rept, for Jan-Dec 19981999-03-31031 March 1999 Forwards Annual Facility Status & Survey Rept, for Jan-Dec 1998 ML20202A9831999-01-18018 January 1999 Informs That Modesto Irrigation District No Longer Seeking Addl Interconnection with Pacific Gas & Electric Co at Pittsburg,Ca & Matters First Addressed in 980429 Comments in Opposition to Restructuring of Util Have Now Become Moot HBL-98-021, Forwards Rept Change (Rev 28) to Hbpp Emergency Plan, Effective 981126.Updated Emergency Plan,Not Included as Part of Submittal1998-12-18018 December 1998 Forwards Rept Change (Rev 28) to Hbpp Emergency Plan, Effective 981126.Updated Emergency Plan,Not Included as Part of Submittal ML20195H7631998-11-20020 November 1998 Forwards Insp Rept 50-133/98-04 on 980901-03,1012-17 & 20-22.No Violations Noted.Insp Focused on Activities Associated with Removal of 250 Feet Ventilation Stack HBL-98-013, Forwards 10CFR50.59 Annual Rept of Changes,Tests & Experiments for Jan-Dec 1997. Encl Annual Rept Provides Brief Description of 10CFR50.59 Facility Design Changes, Including Summary of Each SE1998-11-10010 November 1998 Forwards 10CFR50.59 Annual Rept of Changes,Tests & Experiments for Jan-Dec 1997. Encl Annual Rept Provides Brief Description of 10CFR50.59 Facility Design Changes, Including Summary of Each SE ML20154G4441998-10-0101 October 1998 Ack Receipt of Which Transmitted Rev 8 to Physical Security Plan for Humboldt Bay Power Plant,Under Provisions 10CFR50.54.Based on Determination That Changes Do Not Decrease Effectiveness of Plan,No NRC Approval Required DCL-98-123, Submits Listed Address Changes for NRC Service Lists for Listed Individuals1998-09-0909 September 1998 Submits Listed Address Changes for NRC Service Lists for Listed Individuals HBL-98-015, Forwards Rev 2 to DSAR for Humboldt Bay Power Plant,Unit 3, to Comply W/Decommissioning Rule.Dsar Was Formerly Known as Safstor Decommissioning Plan.Encl 1 Identifies & Describes Rept Changes1998-08-28028 August 1998 Forwards Rev 2 to DSAR for Humboldt Bay Power Plant,Unit 3, to Comply W/Decommissioning Rule.Dsar Was Formerly Known as Safstor Decommissioning Plan.Encl 1 Identifies & Describes Rept Changes DCL-98-108, Submits 90-day Response to NRC GL 98-01, Yr 2000 Readiness of Computer Sys at Nuclear Power Plants. Util Has Pursued & Continuing to Pursue Year 2000 Readiness Program Similar to That Outlined in Nei/Nusmg 97-07, Nuclear Util Year..1998-08-0707 August 1998 Submits 90-day Response to NRC GL 98-01, Yr 2000 Readiness of Computer Sys at Nuclear Power Plants. Util Has Pursued & Continuing to Pursue Year 2000 Readiness Program Similar to That Outlined in Nei/Nusmg 97-07, Nuclear Util Year.. HBL-98-009, Submits Info Describing site-specifc Decommissioning Cost Estimates1998-08-0505 August 1998 Submits Info Describing site-specifc Decommissioning Cost Estimates ML20236G0691998-06-19019 June 1998 Forwards Endorsement 123 to Neila Policy NF-228,Endorsement 145 to Neila Policy NF-113,Endorsement 124 to Neila Policy NF-228 & Endorsement 89 to Maelu Policy MF-103 L-98-027, Forwards Rev 8 to Physical Security Plan.Encl 1 Identifies & Describes Plan Changes,Which Indicated W/Rev Bars in Left Margin of Physical Security Plan.Rev Withheld,Per 10CFR2.790(d)1998-06-11011 June 1998 Forwards Rev 8 to Physical Security Plan.Encl 1 Identifies & Describes Plan Changes,Which Indicated W/Rev Bars in Left Margin of Physical Security Plan.Rev Withheld,Per 10CFR2.790(d) HBL-98-011, Forwards Rept of Rev 27 to Hbpp Emergency Plan,Effective 980507,per 10CFR50.4 & 10CFR50.54(q).Updated Plan Has Already Been Distributed to NRC Region IV IAW Hbpp Procedures.W/O Rept1998-06-0404 June 1998 Forwards Rept of Rev 27 to Hbpp Emergency Plan,Effective 980507,per 10CFR50.4 & 10CFR50.54(q).Updated Plan Has Already Been Distributed to NRC Region IV IAW Hbpp Procedures.W/O Rept ML20247R9091998-05-26026 May 1998 Forwards Copy of Transcript of Public Meeting Held by NRC W/Participation by PG&E on 980429 in Eureka,California Re Decommissioning of Humboldt Bay Power Plant ML20236E7681998-05-22022 May 1998 Forwards Insp Rept 50-133/98-03 on 980427-30.No Violations Noted.Insp Included Plans for Future Decommissioning of Facility,Including Removal of Unit 3 Stack & Eventual Dry Cask Storage of Unit 3 Spent Fuel ML20247L3571998-05-18018 May 1998 Clarifies Remark Re Discharge Through Existing Ventilation Stack to Avoid Confusion.Remark Was in Response to Question Re Purpose of Dismantlement & Replacement of Existing Ventilation Stack ML20247F9241998-05-14014 May 1998 Forwards Insp Rept 50-133/98-02 on 980414-15.No Violations Noted.Areas Examined During Insp Included Portions of Physical Security Program.Determined That Physical Security Program Was Properly Implemented ML20216B7291998-05-12012 May 1998 Expresses Appreciation for Support Provided for Recent Public Meeting Held at Eureka Inn on Decommissioning of Humboldt Bay Power Plant ML20216B6801998-05-11011 May 1998 Expresses Appreciation for Outstanding Support Staff Provided for Recent Public Meeting Held at Eureka Inn on Decommissioning of Humboldt Bay Power Plant ML20217H1161998-04-21021 April 1998 Forwards Annual Rept of Occupational Radiation Exposure, for Employees & Visitors Monitored at Humboldt Bay Power Plant During CY97.Rept on Diskette.W/O Encl ML20216C8681998-04-0808 April 1998 Forwards Amend 32 to License DPR-7 & Safety Evaluation. Amend Revises TS to Implement GL 89-01 & to Incorporate Requirements of Revised 10CFR20 & App I to 10CFR50 HBL-98-008, Forwards Annual Radioactive Effluent Release Rept for 970101-1231. Rept Contains Comparison of Max Calculated Dose to Individual Members of Public W/Numerical Guidelines of 10CFR50 App I1998-03-31031 March 1998 Forwards Annual Radioactive Effluent Release Rept for 970101-1231. Rept Contains Comparison of Max Calculated Dose to Individual Members of Public W/Numerical Guidelines of 10CFR50 App I HBL-98-006, Forwards Annual Facility Status & Survey Rept for 1997. Section a Addresses Facility Status & Section B Presents Results of Monitoring Performed for Radiological Environ Monitoring Program1998-03-31031 March 1998 Forwards Annual Facility Status & Survey Rept for 1997. Section a Addresses Facility Status & Section B Presents Results of Monitoring Performed for Radiological Environ Monitoring Program HBL-98-003, Forwards Corrected TSs Re LAR 96-02,in Entirety W/ Affected Pages Retyped1998-03-13013 March 1998 Forwards Corrected TSs Re LAR 96-02,in Entirety W/ Affected Pages Retyped HBL-98-002, Submits Updated Post-Shutdown Decommissioning Activities Rept for Humboldt Bay Power Plant,Unit 3. Safstor Decommissioning Plan Will Be Considered FSAR for Hbpp1998-02-27027 February 1998 Submits Updated Post-Shutdown Decommissioning Activities Rept for Humboldt Bay Power Plant,Unit 3. Safstor Decommissioning Plan Will Be Considered FSAR for Hbpp ML20203K9691998-02-27027 February 1998 Forwards Insp Rept 50-133/98-01 on 980126-29.No Violations Noted.Major Areas Reviewed as Part of Insp Included Compliance W/Selected TS of License,Review of 1997 Annual Exercise & Evaluation of Facility Re Decommissioning Plan HBL-98-001, Informs That Existing Hbpp PM Program Adequately Meets Requirements of Maint Rule.Summary of Program & Basis for Determining Maint Rule Compliance at Plant,Encl1998-01-26026 January 1998 Informs That Existing Hbpp PM Program Adequately Meets Requirements of Maint Rule.Summary of Program & Basis for Determining Maint Rule Compliance at Plant,Encl ML20198J4791998-01-0707 January 1998 Informs That LL Wheeler Assumed Project Mgt Responsibilities for Humboldt Bay on 971229.LL Wheeler Can Be Contacted at Listed E-mail Address ML20199B3851997-11-13013 November 1997 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-133/97-02 on 971001 HBL-97-016, Responds to NRC Re Violations Noted in Insp Rept 50-133/97-02.Corrective Actions:Correctly Reset Process Water Monitor Warning High & Low Alarms & re-educated All Operators on Proper Method to Set Process Water Monitor1997-10-27027 October 1997 Responds to NRC Re Violations Noted in Insp Rept 50-133/97-02.Corrective Actions:Correctly Reset Process Water Monitor Warning High & Low Alarms & re-educated All Operators on Proper Method to Set Process Water Monitor HBL-97-015, Submits Inventory Changes at Unit 3 from 970401-0930 for Matls Re Enriched U Fuel,Plutonium in Fuel,Fission Counters & Incore Flux Detectors.Encl 2 Provides Data Required by Form DOE/NRC-741.W/o Encl1997-10-0909 October 1997 Submits Inventory Changes at Unit 3 from 970401-0930 for Matls Re Enriched U Fuel,Plutonium in Fuel,Fission Counters & Incore Flux Detectors.Encl 2 Provides Data Required by Form DOE/NRC-741.W/o Encl ML20217D6191997-10-0101 October 1997 Forwards Insp Rept 50-133/97-02 on 970513-0828 & Nov.Nrc Will Use Licensee Response to NOV to Determine Whether Further Enforcement Action Necessary HBL-97-012, Forwards Rept of Rev 26 to Plant Emergency Plan,Effective 970801.Changes Do Not Decrease Effectiveness of Plan1997-08-28028 August 1997 Forwards Rept of Rev 26 to Plant Emergency Plan,Effective 970801.Changes Do Not Decrease Effectiveness of Plan ML20210H4671997-08-0202 August 1997 Requests That NRC Suspend Investigation & Review of Issues Raised by Modesto Irrigation District & Transmission Agency of Northern CA Re Contention That PG&E Had Violated Nuclear License Conditions Known as Stanislaus Commitments ML20149K8321997-07-25025 July 1997 Ack Receipt of Transmitting Rev 7 to Physical Security Plan,Submitted Under Provisions of 10CFR50.54(p). Changes Do Not Decrease Effectiveness of Plan & No NRC Approval Is Required HBL-97-009, Provides Addl Justification to Support TS Change Request Contained in LAR 96-02 ,re Establishment of Radiological Effluents Control Program & in Response to 970416 Telcon1997-06-12012 June 1997 Provides Addl Justification to Support TS Change Request Contained in LAR 96-02 ,re Establishment of Radiological Effluents Control Program & in Response to 970416 Telcon L-97-035, Forwards Info Re Changes to Humboldt Bay Power Plant,Unit 3 Physical Security Plan.Changes Do Not Decrease Safeguards Effectiveness of Plan & Are Submitted Per 10CFR50.54(p). Encls Withheld Per 10CFR2.790(d)1997-04-0909 April 1997 Forwards Info Re Changes to Humboldt Bay Power Plant,Unit 3 Physical Security Plan.Changes Do Not Decrease Safeguards Effectiveness of Plan & Are Submitted Per 10CFR50.54(p). Encls Withheld Per 10CFR2.790(d) L-97-033, Confirms Final Disposition of Specific Hazardous Wastes Shipped to IT Corp Panoche & Vine Hill Facilities from Plant in Jul 19861997-04-0202 April 1997 Confirms Final Disposition of Specific Hazardous Wastes Shipped to IT Corp Panoche & Vine Hill Facilities from Plant in Jul 1986 HBL-97-003, Documents Utils Understanding of Results in Discussions from Meeting W/Nrc Personnel to Discuss Application of New Decommissioning Rule to Hbpp1997-02-20020 February 1997 Documents Utils Understanding of Results in Discussions from Meeting W/Nrc Personnel to Discuss Application of New Decommissioning Rule to Hbpp 1999-09-29 Category:INCOMING CORRESPONDENCE MONTHYEARHBL-99-011, Forwards 10CFR50.59 Annual Rept of Changes,Tests & Experiments for 980101-981231, for Humboldt Bay Power Plant,Unit 31999-08-27027 August 1999
[Table view]Forwards 10CFR50.59 Annual Rept of Changes,Tests & Experiments for 980101-981231, for Humboldt Bay Power Plant,Unit 3 HBL-99-014, Forwards Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates,1999-07-23023 July 1999 Forwards Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates, HBL-99-012, Forwards Rept of Rev 29 to Hbpp Emergency Plan,Effective 990610.Changes in Rev Do Not Decrease Effectiveness of Plan, Per 10CFR50.54(q).Plan Has Been Distributed to Region IV & Is Not Included as Part of Submittal1999-07-0707 July 1999 Forwards Rept of Rev 29 to Hbpp Emergency Plan,Effective 990610.Changes in Rev Do Not Decrease Effectiveness of Plan, Per 10CFR50.54(q).Plan Has Been Distributed to Region IV & Is Not Included as Part of Submittal ML18107A7011999-06-25025 June 1999 Requests Rev of NRC Records to Reflect Change of PG&E Address HBL-99-008, Forwards Annual Rept of Occupational Radiation Exposure for 1998. Radiation Exposure Rept Provided on Encl Diskette in Electronic Format of Reg Guide 8.7.Without Encl1999-04-30030 April 1999 Forwards Annual Rept of Occupational Radiation Exposure for 1998. Radiation Exposure Rept Provided on Encl Diskette in Electronic Format of Reg Guide 8.7.Without Encl HBL-99-003, Forwards Annual Facility Status & Survey Rept, for Jan-Dec 19981999-03-31031 March 1999 Forwards Annual Facility Status & Survey Rept, for Jan-Dec 1998 HBL-99-006, Forwards Annual Radioactive Effluent Release Rept, Covering Period Jan-Dec 1998.Encl 2 Contains Revs 1 & 2 to Safstor ODCM as Required by Specification Section 4.2 of Safstor Offsite Dose Calculation Manual1999-03-31031 March 1999 Forwards Annual Radioactive Effluent Release Rept, Covering Period Jan-Dec 1998.Encl 2 Contains Revs 1 & 2 to Safstor ODCM as Required by Specification Section 4.2 of Safstor Offsite Dose Calculation Manual DCL-99-038, Forwards Decommissioning Funding Repts for Diablo Canyon Power Plant,Units 1 & 2 & Humboldt Bay Power Plant,Unit 3, Per Requirements of 10CFR50.75(f)1999-03-31031 March 1999 Forwards Decommissioning Funding Repts for Diablo Canyon Power Plant,Units 1 & 2 & Humboldt Bay Power Plant,Unit 3, Per Requirements of 10CFR50.75(f) ML20202A9831999-01-18018 January 1999 Informs That Modesto Irrigation District No Longer Seeking Addl Interconnection with Pacific Gas & Electric Co at Pittsburg,Ca & Matters First Addressed in 980429 Comments in Opposition to Restructuring of Util Have Now Become Moot HBL-98-021, Forwards Rept Change (Rev 28) to Hbpp Emergency Plan, Effective 981126.Updated Emergency Plan,Not Included as Part of Submittal1998-12-18018 December 1998 Forwards Rept Change (Rev 28) to Hbpp Emergency Plan, Effective 981126.Updated Emergency Plan,Not Included as Part of Submittal HBL-98-013, Forwards 10CFR50.59 Annual Rept of Changes,Tests & Experiments for Jan-Dec 1997. Encl Annual Rept Provides Brief Description of 10CFR50.59 Facility Design Changes, Including Summary of Each SE1998-11-10010 November 1998 Forwards 10CFR50.59 Annual Rept of Changes,Tests & Experiments for Jan-Dec 1997. Encl Annual Rept Provides Brief Description of 10CFR50.59 Facility Design Changes, Including Summary of Each SE DCL-98-123, Submits Listed Address Changes for NRC Service Lists for Listed Individuals1998-09-0909 September 1998 Submits Listed Address Changes for NRC Service Lists for Listed Individuals HBL-98-015, Forwards Rev 2 to DSAR for Humboldt Bay Power Plant,Unit 3, to Comply W/Decommissioning Rule.Dsar Was Formerly Known as Safstor Decommissioning Plan.Encl 1 Identifies & Describes Rept Changes1998-08-28028 August 1998 Forwards Rev 2 to DSAR for Humboldt Bay Power Plant,Unit 3, to Comply W/Decommissioning Rule.Dsar Was Formerly Known as Safstor Decommissioning Plan.Encl 1 Identifies & Describes Rept Changes DCL-98-108, Submits 90-day Response to NRC GL 98-01, Yr 2000 Readiness of Computer Sys at Nuclear Power Plants. Util Has Pursued & Continuing to Pursue Year 2000 Readiness Program Similar to That Outlined in Nei/Nusmg 97-07, Nuclear Util Year..1998-08-0707 August 1998 Submits 90-day Response to NRC GL 98-01, Yr 2000 Readiness of Computer Sys at Nuclear Power Plants. Util Has Pursued & Continuing to Pursue Year 2000 Readiness Program Similar to That Outlined in Nei/Nusmg 97-07, Nuclear Util Year.. HBL-98-009, Submits Info Describing site-specifc Decommissioning Cost Estimates1998-08-0505 August 1998 Submits Info Describing site-specifc Decommissioning Cost Estimates ML20236G0691998-06-19019 June 1998 Forwards Endorsement 123 to Neila Policy NF-228,Endorsement 145 to Neila Policy NF-113,Endorsement 124 to Neila Policy NF-228 & Endorsement 89 to Maelu Policy MF-103 L-98-027, Forwards Rev 8 to Physical Security Plan.Encl 1 Identifies & Describes Plan Changes,Which Indicated W/Rev Bars in Left Margin of Physical Security Plan.Rev Withheld,Per 10CFR2.790(d)1998-06-11011 June 1998 Forwards Rev 8 to Physical Security Plan.Encl 1 Identifies & Describes Plan Changes,Which Indicated W/Rev Bars in Left Margin of Physical Security Plan.Rev Withheld,Per 10CFR2.790(d) HBL-98-011, Forwards Rept of Rev 27 to Hbpp Emergency Plan,Effective 980507,per 10CFR50.4 & 10CFR50.54(q).Updated Plan Has Already Been Distributed to NRC Region IV IAW Hbpp Procedures.W/O Rept1998-06-0404 June 1998 Forwards Rept of Rev 27 to Hbpp Emergency Plan,Effective 980507,per 10CFR50.4 & 10CFR50.54(q).Updated Plan Has Already Been Distributed to NRC Region IV IAW Hbpp Procedures.W/O Rept ML20247L3571998-05-18018 May 1998 Clarifies Remark Re Discharge Through Existing Ventilation Stack to Avoid Confusion.Remark Was in Response to Question Re Purpose of Dismantlement & Replacement of Existing Ventilation Stack ML20217H1161998-04-21021 April 1998 Forwards Annual Rept of Occupational Radiation Exposure, for Employees & Visitors Monitored at Humboldt Bay Power Plant During CY97.Rept on Diskette.W/O Encl HBL-98-006, Forwards Annual Facility Status & Survey Rept for 1997. Section a Addresses Facility Status & Section B Presents Results of Monitoring Performed for Radiological Environ Monitoring Program1998-03-31031 March 1998 Forwards Annual Facility Status & Survey Rept for 1997. Section a Addresses Facility Status & Section B Presents Results of Monitoring Performed for Radiological Environ Monitoring Program HBL-98-008, Forwards Annual Radioactive Effluent Release Rept for 970101-1231. Rept Contains Comparison of Max Calculated Dose to Individual Members of Public W/Numerical Guidelines of 10CFR50 App I1998-03-31031 March 1998 Forwards Annual Radioactive Effluent Release Rept for 970101-1231. Rept Contains Comparison of Max Calculated Dose to Individual Members of Public W/Numerical Guidelines of 10CFR50 App I HBL-98-003, Forwards Corrected TSs Re LAR 96-02,in Entirety W/ Affected Pages Retyped1998-03-13013 March 1998 Forwards Corrected TSs Re LAR 96-02,in Entirety W/ Affected Pages Retyped HBL-98-002, Submits Updated Post-Shutdown Decommissioning Activities Rept for Humboldt Bay Power Plant,Unit 3. Safstor Decommissioning Plan Will Be Considered FSAR for Hbpp1998-02-27027 February 1998 Submits Updated Post-Shutdown Decommissioning Activities Rept for Humboldt Bay Power Plant,Unit 3. Safstor Decommissioning Plan Will Be Considered FSAR for Hbpp HBL-98-001, Informs That Existing Hbpp PM Program Adequately Meets Requirements of Maint Rule.Summary of Program & Basis for Determining Maint Rule Compliance at Plant,Encl1998-01-26026 January 1998 Informs That Existing Hbpp PM Program Adequately Meets Requirements of Maint Rule.Summary of Program & Basis for Determining Maint Rule Compliance at Plant,Encl HBL-97-016, Responds to NRC Re Violations Noted in Insp Rept 50-133/97-02.Corrective Actions:Correctly Reset Process Water Monitor Warning High & Low Alarms & re-educated All Operators on Proper Method to Set Process Water Monitor1997-10-27027 October 1997 Responds to NRC Re Violations Noted in Insp Rept 50-133/97-02.Corrective Actions:Correctly Reset Process Water Monitor Warning High & Low Alarms & re-educated All Operators on Proper Method to Set Process Water Monitor HBL-97-012, Forwards Rept of Rev 26 to Plant Emergency Plan,Effective 970801.Changes Do Not Decrease Effectiveness of Plan1997-08-28028 August 1997 Forwards Rept of Rev 26 to Plant Emergency Plan,Effective 970801.Changes Do Not Decrease Effectiveness of Plan ML20210H4671997-08-0202 August 1997 Requests That NRC Suspend Investigation & Review of Issues Raised by Modesto Irrigation District & Transmission Agency of Northern CA Re Contention That PG&E Had Violated Nuclear License Conditions Known as Stanislaus Commitments HBL-97-009, Provides Addl Justification to Support TS Change Request Contained in LAR 96-02 ,re Establishment of Radiological Effluents Control Program & in Response to 970416 Telcon1997-06-12012 June 1997 Provides Addl Justification to Support TS Change Request Contained in LAR 96-02 ,re Establishment of Radiological Effluents Control Program & in Response to 970416 Telcon L-97-035, Forwards Info Re Changes to Humboldt Bay Power Plant,Unit 3 Physical Security Plan.Changes Do Not Decrease Safeguards Effectiveness of Plan & Are Submitted Per 10CFR50.54(p). Encls Withheld Per 10CFR2.790(d)1997-04-0909 April 1997 Forwards Info Re Changes to Humboldt Bay Power Plant,Unit 3 Physical Security Plan.Changes Do Not Decrease Safeguards Effectiveness of Plan & Are Submitted Per 10CFR50.54(p). Encls Withheld Per 10CFR2.790(d) L-97-033, Confirms Final Disposition of Specific Hazardous Wastes Shipped to IT Corp Panoche & Vine Hill Facilities from Plant in Jul 19861997-04-0202 April 1997 Confirms Final Disposition of Specific Hazardous Wastes Shipped to IT Corp Panoche & Vine Hill Facilities from Plant in Jul 1986 HBL-97-003, Documents Utils Understanding of Results in Discussions from Meeting W/Nrc Personnel to Discuss Application of New Decommissioning Rule to Hbpp1997-02-20020 February 1997 Documents Utils Understanding of Results in Discussions from Meeting W/Nrc Personnel to Discuss Application of New Decommissioning Rule to Hbpp HBL-97-001, Submits Annual Rept of Changes,Tests & Experiments for Humboldt Bay Power Plant,Unit 3 for Reporting Interval Jan-Dec 19951997-01-28028 January 1997 Submits Annual Rept of Changes,Tests & Experiments for Humboldt Bay Power Plant,Unit 3 for Reporting Interval Jan-Dec 1995 ML20133F8961997-01-0909 January 1997 Responds to NRC Ltr of 961206 Received on 961210 Which Requested Further Info Re Utils Violations of Conditions of Its Nuclear Licenses Designated to Promote & Protect Competition in Bulk Power Market in Northern & Central CA ML20133F8721997-01-0909 January 1997 Acks & Responds to NRC Ltr of 961206 Received by Undersigned on 961210 Requesting Further Info to Document Tancs Assertion,Per Filing on 960429 That Util Has Violated Terms & Conditions of Nuclear Power Project Licenses HBL-96-027, Forwards Application for Amend to License DPR-7 to Relocate Controls & Limitations on RETS & Radiological Environmental Monitoring to ODCM & PCP1996-12-0909 December 1996 Forwards Application for Amend to License DPR-7 to Relocate Controls & Limitations on RETS & Radiological Environmental Monitoring to ODCM & PCP HBL-93-060, Forwards Rev 6 to Pacific Gas & Electric Co Humboldt Bay Plant Unit 3 - Safstor QA Plan1993-10-14014 October 1993 Forwards Rev 6 to Pacific Gas & Electric Co Humboldt Bay Plant Unit 3 - Safstor QA Plan ML20057F7271993-10-0808 October 1993 Forwards LAR 93-02,revising TS Section II, Site, Section V, Monitoring Sys & Section VII, Administrative Controls ML20059C4221993-09-0808 September 1993 Forwards Humboldt Bay Power Plant Updated Newsletter Sent to People Living within Ten Miles of Power Plant During Sept 1993 HBL-93-050, Forwards Rev 3 to Emergency Plan to Include Local Ltrs of Agreements W/Local Hosps,Humboldt County Fire Depts & Local Ambulance Svcs.Informs That Because Plan Incorporated Into Hbpp Plant Manuals,Vol 3,Rev 21 Appears at Top of Each Page1993-08-17017 August 1993 Forwards Rev 3 to Emergency Plan to Include Local Ltrs of Agreements W/Local Hosps,Humboldt County Fire Depts & Local Ambulance Svcs.Informs That Because Plan Incorporated Into Hbpp Plant Manuals,Vol 3,Rev 21 Appears at Top of Each Page HBL-93-005, Forwards Public Version of Rev 2 to Emergency Plan.Vol 3,Rev 20 Appears at Top of Each Page of Rev to Reflect Incorporation of Emergency Plan Into Hbpp Plant Manuals & Current Sys for Maint of Manuals.W/930202 Release Memo1993-01-19019 January 1993 Forwards Public Version of Rev 2 to Emergency Plan.Vol 3,Rev 20 Appears at Top of Each Page of Rev to Reflect Incorporation of Emergency Plan Into Hbpp Plant Manuals & Current Sys for Maint of Manuals.W/930202 Release Memo HBL-90-038, Forwards Decommissioning Financial Assurance Certification Rept,Per 10CFR50.751990-07-24024 July 1990 Forwards Decommissioning Financial Assurance Certification Rept,Per 10CFR50.75 HBL-90-036, Forwards Replacement Page 13-1,further Revising Section 13.2 of 880826 Rev 2 to Physical Security Plan.Rev Adds Specific Source Ref to Commitment Document & Retention of security- Related Documents.Encl Withheld (Ref 10CFR73.21)1990-07-17017 July 1990 Forwards Replacement Page 13-1,further Revising Section 13.2 of 880826 Rev 2 to Physical Security Plan.Rev Adds Specific Source Ref to Commitment Document & Retention of security- Related Documents.Encl Withheld (Ref 10CFR73.21) HBL-89-041, Responds to NRC Re Violations Noted in Insp Rept 50-133/89-02.Corrective Action:High Level Vault Containing Drums of Waste Immediately Posted as High Radiation Area1989-09-11011 September 1989 Responds to NRC Re Violations Noted in Insp Rept 50-133/89-02.Corrective Action:High Level Vault Containing Drums of Waste Immediately Posted as High Radiation Area ML20246E6061989-08-16016 August 1989 Forwards Endorsements 10 & 11 to Nelia Certificate N-74 & Maelu Certificate M-74 & Endorsements 7 & 8 to Nelia Certificate N-76 & Maelu Certificate M-76,respectively DCL-89-201, Discusses Notification to NRC Re Employees Potential Safety Issues,Per NRC .Licensee Sent Clarifying Ltrs to Employees Stating That Employees Free to Contact NRC of Any Safety Concerns W/O Fear of Retribution in Any Form1989-07-28028 July 1989 Discusses Notification to NRC Re Employees Potential Safety Issues,Per NRC .Licensee Sent Clarifying Ltrs to Employees Stating That Employees Free to Contact NRC of Any Safety Concerns W/O Fear of Retribution in Any Form ML20244B9261989-06-14014 June 1989 Submits Certificate of Insurance for Plant,Certifying That Insurance Has Been Effected W/Nuclear Mutual Ltd.Policy Term Is 890401-900401 ML20246J7051989-06-0909 June 1989 Forwards Application for Exemption from Requirements of 10CFR50.54(W) Filed Per 10CFR50.12(a).Application Relates to Utils Request for Reduction in on-site Property Damage Insurance from Current $100,000 to $63,160,000 DCL-89-149, Requests Renewal of Approval of QA Programs for Radioactive Matl Packages1989-05-30030 May 1989 Requests Renewal of Approval of QA Programs for Radioactive Matl Packages ML20244B4881989-04-0707 April 1989 Forwards Endorsement 35 to Maelu Policy MF-103 & Endorsements 65 & 116 to Nelia Policies NF-228 & NF-113, Respectively 1999-08-27 Category:UTILITY TO NRC MONTHYEARHBL-90-038, Forwards Decommissioning Financial Assurance Certification Rept,Per 10CFR50.751990-07-24024 July 1990
[Table view]Forwards Decommissioning Financial Assurance Certification Rept,Per 10CFR50.75 HBL-90-036, Forwards Replacement Page 13-1,further Revising Section 13.2 of 880826 Rev 2 to Physical Security Plan.Rev Adds Specific Source Ref to Commitment Document & Retention of security- Related Documents.Encl Withheld (Ref 10CFR73.21)1990-07-17017 July 1990 Forwards Replacement Page 13-1,further Revising Section 13.2 of 880826 Rev 2 to Physical Security Plan.Rev Adds Specific Source Ref to Commitment Document & Retention of security- Related Documents.Encl Withheld (Ref 10CFR73.21) HBL-89-041, Responds to NRC Re Violations Noted in Insp Rept 50-133/89-02.Corrective Action:High Level Vault Containing Drums of Waste Immediately Posted as High Radiation Area1989-09-11011 September 1989 Responds to NRC Re Violations Noted in Insp Rept 50-133/89-02.Corrective Action:High Level Vault Containing Drums of Waste Immediately Posted as High Radiation Area ML20246E6061989-08-16016 August 1989 Forwards Endorsements 10 & 11 to Nelia Certificate N-74 & Maelu Certificate M-74 & Endorsements 7 & 8 to Nelia Certificate N-76 & Maelu Certificate M-76,respectively DCL-89-201, Discusses Notification to NRC Re Employees Potential Safety Issues,Per NRC .Licensee Sent Clarifying Ltrs to Employees Stating That Employees Free to Contact NRC of Any Safety Concerns W/O Fear of Retribution in Any Form1989-07-28028 July 1989 Discusses Notification to NRC Re Employees Potential Safety Issues,Per NRC .Licensee Sent Clarifying Ltrs to Employees Stating That Employees Free to Contact NRC of Any Safety Concerns W/O Fear of Retribution in Any Form ML20246J7051989-06-0909 June 1989 Forwards Application for Exemption from Requirements of 10CFR50.54(W) Filed Per 10CFR50.12(a).Application Relates to Utils Request for Reduction in on-site Property Damage Insurance from Current $100,000 to $63,160,000 DCL-89-149, Requests Renewal of Approval of QA Programs for Radioactive Matl Packages1989-05-30030 May 1989 Requests Renewal of Approval of QA Programs for Radioactive Matl Packages ML20244B4881989-04-0707 April 1989 Forwards Endorsement 35 to Maelu Policy MF-103 & Endorsements 65 & 116 to Nelia Policies NF-228 & NF-113, Respectively ML20235J2191989-02-17017 February 1989 Forwards Endorsements,Including Endorsement 3 to Nelia Certificate NW-132,Endorsement 3 to Maelu Certificate MW-73, Endorsement 4 to Nelia Certificate NW-51 & Endorsement 4 to Maelu Certificate MW-135 HBL-88-077, Requests Exemption from Provisions of 10CFR70.51(d) Re Annual Physical Inventory of Spent Fuel.Conducting Physical Inventory Not Necessary to Achieve Underlying Purpose of Rule.Performance of Annual Inventory Satisfies Requirement1988-09-13013 September 1988 Requests Exemption from Provisions of 10CFR70.51(d) Re Annual Physical Inventory of Spent Fuel.Conducting Physical Inventory Not Necessary to Achieve Underlying Purpose of Rule.Performance of Annual Inventory Satisfies Requirement HBL-88-074, Forwards Changes to Rev 2 to Physical Security Plan.Info Withheld (Ref 10CFR73.21)1988-08-26026 August 1988 Forwards Changes to Rev 2 to Physical Security Plan.Info Withheld (Ref 10CFR73.21) HBL-88-066, Forwards Addl Info Re Use of Security Seals on Spent Fuel Storage Pool,Per1988-07-19019 July 1988 Forwards Addl Info Re Use of Security Seals on Spent Fuel Storage Pool,Per HBL-88-055, Requests NRC Concurrence to Utilize Security Seals on Spent Fuel Storage Pool at Plant.Use of Seals Will Simplify Annual Physical Inventory of Spent Fuel Stored in Pool & Minimize Radiation Exposures to Workers & Contamination1988-06-0606 June 1988 Requests NRC Concurrence to Utilize Security Seals on Spent Fuel Storage Pool at Plant.Use of Seals Will Simplify Annual Physical Inventory of Spent Fuel Stored in Pool & Minimize Radiation Exposures to Workers & Contamination ML20154L3411988-05-23023 May 1988 Forwards Replacement Pages for Proposed Safstor Tech Specs, Rev 0,per 880505 Discussions W/Nrc DCL-88-100, Forwards Rev 4 to Humboldt Bay Power Plant Unit 3 Safstor QA Plan. Revs Listed1988-04-21021 April 1988 Forwards Rev 4 to Humboldt Bay Power Plant Unit 3 Safstor QA Plan. Revs Listed HBL-88-026, Forwards Edited Rev 3 to Proposed Safstor Tech Specs, Initially Transmitted on 871116,for NRC Approval & Issuance as Rev 0.Ack of Receipt Requested1988-03-16016 March 1988 Forwards Edited Rev 3 to Proposed Safstor Tech Specs, Initially Transmitted on 871116,for NRC Approval & Issuance as Rev 0.Ack of Receipt Requested HBL-87-066, Forwards Rev 3 to Proposed Tech Specs for Safstor.Revs Reflect Util 870821 Response to NRC Request for Addl Info1987-11-16016 November 1987 Forwards Rev 3 to Proposed Tech Specs for Safstor.Revs Reflect Util 870821 Response to NRC Request for Addl Info ML20236H9691987-10-26026 October 1987 Forwards Endorsement 25 to Maelu Policy MF-103 & Endorsement 55 to Nelia Policy NF-228 HBL-87-054, Forwards Repts Entitled Radioactive Effluent Releases & Waste Disposal from Humboldt Bay Power Plant Unit 3 for Jan-June 1987 & Environ Radiation Study in Vicinity of Humboldt Bay Power Plant,Annual Rept 19861987-08-28028 August 1987 Forwards Repts Entitled Radioactive Effluent Releases & Waste Disposal from Humboldt Bay Power Plant Unit 3 for Jan-June 1987 & Environ Radiation Study in Vicinity of Humboldt Bay Power Plant,Annual Rept 1986 HBL-87-052, Forwards Responses to NRC 870723 Request for Addl Info Re Safstor Tech Specs.Revised Set of Tech Specs Will Be Submitted After NRC Review of Responses1987-08-21021 August 1987 Forwards Responses to NRC 870723 Request for Addl Info Re Safstor Tech Specs.Revised Set of Tech Specs Will Be Submitted After NRC Review of Responses HBL-87-051, Forwards Rev 2 to Physical Security Plan & Changes.Changes Do Not Decrease Effectiveness of Plan & Submitted Per 10CFR50.54(p).Plan & Changes Withheld (Ref 10CFR73.21)1987-08-18018 August 1987 Forwards Rev 2 to Physical Security Plan & Changes.Changes Do Not Decrease Effectiveness of Plan & Submitted Per 10CFR50.54(p).Plan & Changes Withheld (Ref 10CFR73.21) HBL-87-047, Forwards Rev 3 to Custodial Safstor Facility QA Plan.Changes Include Clarification of Sections Re Packaging & Transportation,Fire Rating of Storage Containers,Audit Frequency & Ref to Reg Guide1987-07-30030 July 1987 Forwards Rev 3 to Custodial Safstor Facility QA Plan.Changes Include Clarification of Sections Re Packaging & Transportation,Fire Rating of Storage Containers,Audit Frequency & Ref to Reg Guide HBL-87-020, Forwards Change Pages for Rev 1 to Facility Physical Security Plan to More Accurately Describe Certain Provisions of Plan.Encl Withheld (Ref 10CFR73.21)1987-04-30030 April 1987 Forwards Change Pages for Rev 1 to Facility Physical Security Plan to More Accurately Describe Certain Provisions of Plan.Encl Withheld (Ref 10CFR73.21) HBL-87-015, Forwards Proposed Rev 2 to Safstor Tech Specs.Rev Includes Changes to Chemistry Limits on Spent Fuel Storage Pool & Requirements for Surveillance Program for Boral Matl of Spent Fuel Assembly Containers1987-03-20020 March 1987 Forwards Proposed Rev 2 to Safstor Tech Specs.Rev Includes Changes to Chemistry Limits on Spent Fuel Storage Pool & Requirements for Surveillance Program for Boral Matl of Spent Fuel Assembly Containers ML20207R4571987-03-13013 March 1987 Forwards Endorsements 52 & 110 to Nelia Policies NF-228 & NF-113,respectively HBL-87-006, Forwards Public Version of Rev 7 to Corporate Emergency Response Plan Implementing Procedure 3.2, Corporate Communications Dept & County of Humboldt Contingency Plan, Nuclear Reactor,Humboldt Bay. W/870310 Release Memo1987-02-26026 February 1987 Forwards Public Version of Rev 7 to Corporate Emergency Response Plan Implementing Procedure 3.2, Corporate Communications Dept & County of Humboldt Contingency Plan, Nuclear Reactor,Humboldt Bay. W/870310 Release Memo HBL-87-002, Forwards Response to 861230 Request for Addl Info on Emergency Plan Supporting Util Proposed Safstor Decommissioning Plan1987-01-20020 January 1987 Forwards Response to 861230 Request for Addl Info on Emergency Plan Supporting Util Proposed Safstor Decommissioning Plan DCL-87-006, Requests That Technical Correspondence Be Addressed to Author at Listed Address,Per Encl .Encl NRC Re Results of Peebles Electrical Machines Insp Mistakenly Addressed to Jo Schuyler1987-01-12012 January 1987 Requests That Technical Correspondence Be Addressed to Author at Listed Address,Per Encl .Encl NRC Re Results of Peebles Electrical Machines Insp Mistakenly Addressed to Jo Schuyler HBL-86-039, Forwards Rev 1 to Proposed Physical Security Plan,Based on Discussions W/Nrc & Description of Changes.Encls Withheld (Ref 10CFR73.21)1986-11-17017 November 1986 Forwards Rev 1 to Proposed Physical Security Plan,Based on Discussions W/Nrc & Description of Changes.Encls Withheld (Ref 10CFR73.21) HBL-86-035, Forwards Alternatives & Issues for Extended Storage of Spent Nuclear Fuel from Humboldt Bay Power Plant,Unit 3 & Extended Fuel Storage in Existing Onsite Humboldt Bay Unit 3 Storage Pool. Ack of Receipt Requested1986-10-29029 October 1986 Forwards Alternatives & Issues for Extended Storage of Spent Nuclear Fuel from Humboldt Bay Power Plant,Unit 3 & Extended Fuel Storage in Existing Onsite Humboldt Bay Unit 3 Storage Pool. Ack of Receipt Requested HBL-86-032, Forwards PG&E Responses to Public Comments on Des for Decommissioning Humboldt Bay Unit 3. Ack Receipt of Matl on Encl Ltr Requested1986-10-20020 October 1986 Forwards PG&E Responses to Public Comments on Des for Decommissioning Humboldt Bay Unit 3. Ack Receipt of Matl on Encl Ltr Requested HBL-86-029, Notifies That No Operator Licensing Exams Planned for Facility,As Util in Process of Decommissioning & Placing Unit in Safstor Mode for long-term Storage,Per Generic Ltr 86-14.Related Correspondence1986-09-24024 September 1986 Notifies That No Operator Licensing Exams Planned for Facility,As Util in Process of Decommissioning & Placing Unit in Safstor Mode for long-term Storage,Per Generic Ltr 86-14.Related Correspondence HBL-86-027, Forwards Radioactive Effluent Releases & Waste Disposal, Jan-June 1986 & Environ Radiation Study in Vicinity of Humboldt Bay Power Plant,Eureka,Ca,Annual Rept 19851986-08-28028 August 1986 Forwards Radioactive Effluent Releases & Waste Disposal, Jan-June 1986 & Environ Radiation Study in Vicinity of Humboldt Bay Power Plant,Eureka,Ca,Annual Rept 1985 HBL-86-026, Forwards Comments on Des for Decommissioning of Humboldt Bay Power Plant,Unit 3.Fission Chamber Strings Cut Up to Separate Chambers & Minimize Stored Waste Vol1986-08-14014 August 1986 Forwards Comments on Des for Decommissioning of Humboldt Bay Power Plant,Unit 3.Fission Chamber Strings Cut Up to Separate Chambers & Minimize Stored Waste Vol DCL-86-186, Informs of Reorganization & Reinstatement of Util Onsite Project Engineering Group.Changes Listed1986-06-30030 June 1986 Informs of Reorganization & Reinstatement of Util Onsite Project Engineering Group.Changes Listed HBL-86-023, Requests Approval for Offsite Disposal of Listed Very Low Radwastes as Produced,W/O Individual Authorization.Util Will Sample Wastes & Monitor Radioactivity Per NRC Approved 831027 & 840407 Transmittals.Fee Paid1986-06-17017 June 1986 Requests Approval for Offsite Disposal of Listed Very Low Radwastes as Produced,W/O Individual Authorization.Util Will Sample Wastes & Monitor Radioactivity Per NRC Approved 831027 & 840407 Transmittals.Fee Paid ML20211B9971986-06-0202 June 1986 Forwards Endorsement 108 to Nelia Policy NF-113 HBL-86-019, Forwards Rev 2 to Safstor QA Plan. Section 2.0 Revised to Reflect Applicable Organization Changes,Section 3.1.3, Insps Added to Describe Applicable Insp Requirements & Section 3.1.4, Nonconformance Control Revised1986-05-23023 May 1986 Forwards Rev 2 to Safstor QA Plan. Section 2.0 Revised to Reflect Applicable Organization Changes,Section 3.1.3, Insps Added to Describe Applicable Insp Requirements & Section 3.1.4, Nonconformance Control Revised HBL-86-020, Forwards Errata to 860313 Rev 1 to Proposed Safstor Tech Specs,Including Revised Figure VII-1, Offsite Organization Chart & Page VII-101986-05-23023 May 1986 Forwards Errata to 860313 Rev 1 to Proposed Safstor Tech Specs,Including Revised Figure VII-1, Offsite Organization Chart & Page VII-10 ML20198B9061986-05-16016 May 1986 Forwards Application to Amend License DPR-7,consisting of License Amend Request 86-02,upgrading Stack Gas Monitoring Sys & Reducing Number of Condensate Demineralizer Beds.Fee Paid HBL-86-018, Suppls 840730 Decommissioning Amend Request for License DPR-7 to Perform Mods Re Upgrading Spent Fuel Storage Pool, Pool Cover & Redundant Level Monitors & Replacing Stack Monitor to Reflect possession-only Status1986-05-16016 May 1986 Suppls 840730 Decommissioning Amend Request for License DPR-7 to Perform Mods Re Upgrading Spent Fuel Storage Pool, Pool Cover & Redundant Level Monitors & Replacing Stack Monitor to Reflect possession-only Status ML20205P0711986-05-14014 May 1986 Forwards License Amend Request 86-01 to License DPR-7, Modifying Security Plan to Reflect possession-only Status of Plant.Security Plan Supporting Decommissioning & Safstor Withdrawn.Fee Paid ML20210L3051986-04-15015 April 1986 Forwards Endorsements 48 & 107 to Nelia Policies NF-228 & NF-113,respectively & Endorsement 19 to Maelu Policy MF-103 HBL-86-006, Forwards Rev 1 to Safstor QA Program & Description of Rev1986-03-14014 March 1986 Forwards Rev 1 to Safstor QA Program & Description of Rev HBL-86-005, Forwards Rev 1 to Tech Specs for Decommissioning of Humboldt Bay Power Plant Unit 3. Rev Incorporates Util Commitments in Response to Questions During NRC Review of Decommissioning Plan1986-03-13013 March 1986 Forwards Rev 1 to Tech Specs for Decommissioning of Humboldt Bay Power Plant Unit 3. Rev Incorporates Util Commitments in Response to Questions During NRC Review of Decommissioning Plan HBL-86-004, Forwards No Significant Hazards Determination,Per Generic Ltr 86-03,supporting 831216 License Amend Request LAR 83-01, Amending License DPR-7 to Delete Requirements of Item E.2e of 760521 Order for Mod of License Re Seismic Network1986-03-0707 March 1986 Forwards No Significant Hazards Determination,Per Generic Ltr 86-03,supporting 831216 License Amend Request LAR 83-01, Amending License DPR-7 to Delete Requirements of Item E.2e of 760521 Order for Mod of License Re Seismic Network ML20140E7281986-01-23023 January 1986 Forwards Endorsement 106 to Nelia Policy NF-113 HBL-85-061, Submits Rept Re Investigation of Radwaste Shipments for Which Notification of Receipt Not Received within 20 Days After Transfer.Formal Notification of Receipt of 851118 & 19 Shipments Received on 851211 & 10,respectively1985-12-20020 December 1985 Submits Rept Re Investigation of Radwaste Shipments for Which Notification of Receipt Not Received within 20 Days After Transfer.Formal Notification of Receipt of 851118 & 19 Shipments Received on 851211 & 10,respectively HBL-85-059, Forwards Rev 1 to Humboldt Bay Power Plant Unit 3 - Safstor QA Plan, Replacing Attachment 4 of 840731 Decommissioning Plan.Basis for & Description of Approach Included1985-12-13013 December 1985 Forwards Rev 1 to Humboldt Bay Power Plant Unit 3 - Safstor QA Plan, Replacing Attachment 4 of 840731 Decommissioning Plan.Basis for & Description of Approach Included HBL-85-058, Cancels 851203 & 10 Advance Notifications of Nuclear Waste Shipment.Advance Notification Not Needed Since Quantity of Radioactive Matl Contained in Shipment Does Not Exceed Quantities Listed in 10CFR71.97(b)(3)1985-12-12012 December 1985 Cancels 851203 & 10 Advance Notifications of Nuclear Waste Shipment.Advance Notification Not Needed Since Quantity of Radioactive Matl Contained in Shipment Does Not Exceed Quantities Listed in 10CFR71.97(b)(3) 1990-07-24 |